Drawing for CORIMEC

USPTO serial 79085861

CORIMEC

Reviewed by CopyMark Law Group

Reg. 4008159Status 404
Filing date
Status date
Registration date
Aug 9, 2011
Examiner
COOPER, CHRISTINE H
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CORIMEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Prefabricated portable metal buildings for dwelling purposes; portable metal buildings for dwelling purposes; portable metal residential shelters; metal building material, namely, ceiling boards and floor boards; building materials, namely, composite panels composed primarily of metal; prefabricated buildings made primarily of metal with a metal carrying structure; prefabricated metal platform and their metal parts, namely, ladders, scaffolding, nuts, bolts, wall framing made primarily of metal, materials of metal for scaffolds, metal curtain walls; metal mine drilling and working platform and their metal parts, namely, ladders, scaffolding, nuts, bolts, wall framing made primarily of metal, materials of metal for scaffolds, metal curtain walls; metal rocket launching platforms and their metal parts, namely, ladders, scaffolding, nuts, bolts, wall framing made primarily of metal, materials of metal for scaffolds, metal curtain walls; and offshore drilling platforms made primarily of metal and their metal parts, namely, ladders, scaffolding, nuts, bolts, wall framing made primarily of metal, materials of metal for scaffolds, metal curtain wallsSECTION 71 - CANCELLED—
019Prefabricated portable non-metal buildings for dwelling purposes; manufactured housing, namely, mobile homes; wood boards, ceiling panels not of metal, wall boards, and wall panels not of metal; building materials, namely, composite panels composed primarily of non-metal materials; non-metal water resistant boards and panels for constructions; non-metal fire-resistant boards and panels for construction; prefabricated non-metal buildings with non-metal carrying structure; prefabricated non-metal diving platforms and their non-metal parts, namely, decking, floors, guardrails; and non-metal rocket launching platforms and their non-metal parts, namely, decking, floors, guardrailsSECTION 71 - CANCELLED—
037Construction, repair and maintenance of prefabricated building and mobile dwelling units, platforms and offshore platforms and the installation of plumbing, gas and water system, machinery, heating, ventilating and air conditioning systems associated with these structures; construction, repair and maintenance of vehicles fitted as dwelling units, sickrooms, hospitals, ambulances, maintenance shops, heating and/or conditioning power stations, kitchens, long-distance transmission stations, mobile exhibition pavilions and the installation of plumbing, gas and water system, machinery, heating, ventilating and air conditioning systems associated with these structuresSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 2, 2022FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 5, 2021GPNXNOTIFICATION PROCESSED BY IB—
Apr 18, 2021RFNTREFUSAL PROCESSED BY IB—
Feb 21, 2021LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Nov 7, 2020DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Nov 7, 2020DETHDEATH OF INTERNATIONAL REGISTRATION—
May 15, 2020LIMGLIMITATION OF GOODS RECEIVED FROM IB—
May 14, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 4, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 2, 2018XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Dec 2, 2018XXCRGENERIC MADRID TRANSACTION CREATED—
Nov 16, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 16, 2018C71TCANCELLED SECTION 71—
Sep 7, 2017CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 3, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 22, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 22, 2011FIMPFINAL DISPOSITION PROCESSED—
Nov 9, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 9, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 13, 2011GPNXNOTIFICATION PROCESSED BY IB—
May 24, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 24, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 4, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 4, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 15, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 14, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 14, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Apr 14, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 14, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 14, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Apr 14, 2011ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 14, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 30, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 30, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 24, 2011ALIEASSIGNED TO LIE—
Mar 16, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 16, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 16, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Oct 9, 2010RFNTREFUSAL PROCESSED BY IB—
Sep 17, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 16, 2010RFRRREFUSAL PROCESSED BY MPU—
Sep 16, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 15, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 14, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 10, 2010DOCKASSIGNED TO EXAMINER—
Sep 10, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 9, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance