USPTO serial 79086770
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mark L. Maki
Mark L. Maki FLYNN, THIEL, BOUTELL & TANIS, P.C.2026 Rambling RoadKalamazoo, MI 49008-1631UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, namely, electrical generators, current generators, electricity generators; Motors and engines other than for land vehicles; Parts of motors and engines of all kinds, namely, pneumatic controls, electrical connection boxes specially adapted for use with current generators, machine couplings and transmission components except for land vehicles | SECTION 71 - CANCELLED | — |
| 009 | Surveying apparatus and instruments, namely, surveying instruments in the field of electricity; current measuring and current checking supervision instruments, namely, electrical current-evaluation-instruments in the nature of current-converters, current-sensors and current rectifiers; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, cabinets, fuses, clamps, voltage surge protectors, switches, accumulators and inverters; photovoltaic installations, namely, solar modules for generation of electricity for over-voltage protection, data processing equipment; elements for photovoltaic installations, namely, over-voltage protection fuses, fuse clips and panel-mounted fuse holders for use with electronic glass and ceramic fuses, electric switches, computer switches, cabinets specially adapted for use with photovoltaic modules, housings for electric switches, clamps specially adapted for use with photovoltaic modules, electrical terminal blocks, electric cables, electric control panels for photovoltaic modules, accumulators, batteries, array-boxes, namely, housings specially adapted for use with photovoltaic solar modules in the nature of housings for all of the following: string electrical cables, power supplies, photovoltaic cells, and monitoring systems in the nature of security alarms and electricity meters; photovoltaic solar modules | SECTION 71 - CANCELLED | — |
| 011 | Solar energy installations, namely, solar thermal modules, solar collectors, solar reactors, solar heat collection panels and solar energy receivers; wind power plants; block-type thermal power stations for power generation; biomass heating installations | SECTION 71 - CANCELLED | — |
| 035 | Advertising; business management; business administration; office functions; professional business consultancy; consumer consultancy in the nature of providing consumer product information in the field of electrical installations; retail and wholesale ordering services and online retail store services all in the field of renewable energies featuring machines, motors and engines, parts for motors and engines of all kinds, controls, generator connector boxes, machine coupling and transmission components, photovoltaic installations, elements for photovoltaic installations, photovoltaic modules, surveying apparatus and instruments, measuring and checking instruments, apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity, in particular fuses, voltage surge protection devices, inverters, solar collectors for electricity generation, solar power installations, wind power plants, block-type thermal power stations, biomass heating installations, data processing equipment and computers | SECTION 71 - CANCELLED | — |
| 037 | Building construction and repair; installation, maintenance and repair of photovoltaic-installations and electricity metering and monitoring systems excluding the installation, maintenance and repair of the software or computer systems associated therewith; maintenance and repair of burners; support with installations in the field of renewable energy through services connected to building construction, namely, building construction project management in the field of renewable energy; repair services in the field of electricity, namely, repair of photovoltaic installations, wind power installations and electricity charging equipment excluding the repair of the software or computer systems associated therewith; repair services in the field of electricity, namely, repair of electrical power generating equipment, photovoltaic-systems and wind power installations excluding the repair of the software or computer systems associated therewith | SECTION 71 - CANCELLED | — |
| 042 | Engineering, computer programming, physics research in the field of photovoltaic-installations, connection technology and electric mobility; construction drafting, technological design consultancy in the field of photovoltaic-installations, connection technology and electric mobility; scientific consultancy relating to the conservation of energy in the nature of energy conservation technology; technological consultancy in the fields of technical planning, engineering and project management relating to the design of photovoltaic-plants; engineering services in the field of technical project planning | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 17, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 17, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jun 20, 2020 | IRIV | IRREGULARITY ON INVALIDATION RECEIVED FROM IB | — |
| May 30, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| May 30, 2020 | INPC | INVALIDATION PROCESSED | — |
| Apr 2, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 2, 2019 | C71T | CANCELLED SECTION 71 | — |
| Jan 1, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jul 13, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 6, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 18, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 18, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Apr 29, 2013 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Apr 28, 2013 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Apr 1, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jan 1, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Nov 4, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 4, 2012 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 16, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Oct 16, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Sep 26, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 26, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Sep 26, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Sep 10, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 9, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 9, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 9, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 9, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 9, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Sep 9, 2012 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Sep 7, 2012 | PBER | WITHDRAWN FROM PUB - EXAMINING ATTORNEY REQUEST | — |
| Sep 4, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Sep 4, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Sep 4, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Sep 4, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Sep 4, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Sep 4, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jul 15, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 13, 2012 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 1, 2012 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jun 19, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 12, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 18, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 17, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 17, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 29, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 29, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 29, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 29, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 29, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 3, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 3, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 3, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 5, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 5, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 5, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 6, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 6, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 6, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 4, 2011 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 4, 2011 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Nov 12, 2010 | UNPR | UNRESPONSIVE/DUPLICATE PAPER RECEIVED | — |
| Nov 12, 2010 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 12, 2010 | ALIE | ASSIGNED TO LIE | — |
| Oct 25, 2010 | FAXX | FAX RECEIVED | — |
| Oct 24, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 7, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 7, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 7, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 6, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 5, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 1, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 1, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 30, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |