Drawing for LEMMINKÄINEN

USPTO serial 79087687

LEMMINKÄINEN

Reviewed by CopyMark Law Group

Reg. 4078585Status 404
Filing date
Status date
Registration date
Jan 3, 2012
Examiner
BURNS, ELLEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LEMMINKÄINEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andrew Roppel

Andrew Roppel Holland & Hart LLPPO Box 8749Attn. Tracy BakerDenver, CO 80201

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; metal building materials, namely, profiles, tubes, scaffolds, building flashings, chimneys, claddings for building and construction, metal roofs and roofings, stair cases, prefabricated platforms, prefabricated metal bridges, metal wall frames and panels, metal gates, metal doors, metal windows and window casements, metal piles and armour steel; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery in the nature of small items of metal hardware, namely, metal sash fasteners for windows, bolts, nails, rivets, screws, brads, clamps, cotter pins, ball lock pins, white metal pins, nuts; pipes and tubes of metal; metal safes; ores; metal wire fences, gates and latch bars; metal stands for audience and metal grating; metal gutters; metal roofingsSECTION 71 - CANCELLED—
019Non-metallic building materials, namely, sawn timber and un-sawn timber for use in construction industries; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; bituminous roofing materials and waterproofing products, namely, bitumen roofing membranes, bitumen shingles, bitumen roofing sealants and fixatives; concrete covering stones, ceramic and concrete tiles, edging, fences, walls and wall stones, concrete breeze-blocks, non-metal water channels for roofs, balconies, streets and yards; and cups, gouge slabs of concrete, non-metal exterior stairs, concrete driving hindrances and bollards, staircase units of mosaic concrete, natural stone or concrete, steps in the nature of non-metal stairs; and cement chair slabs; building materials, namely, asphalt and bitumen roof coating; non-metallic fences, gates and latch barsSECTION 71 - CANCELLED—
037Building construction; building repair; installation services in the field of residential construction, commercial and office construction; construction of industrial and logistic buildings, structures, roads, bridges, railroads and tunnels; construction of sports and recreational facilities; infrastructure construction of roads, streets and rail networks; residential building and infrastructure construction services; infrastructure building construction services; installation, repair and maintenance services related to technical building services; consulting services related to residential construction, infrastructure construction and installation, repair and maintenance of technical building services; repair and maintenance services of real estate; quarrying, crushing and screening of minerals aggregate; construction services, namely, asphalt paving and foundation structuring; installations, maintenance and repair of automation systems; metal and steel structures construction; building of telecommunications networksSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 29, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
May 29, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 7, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 2, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 2, 2019INPCINVALIDATION PROCESSED—
Apr 10, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Oct 25, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 18, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 30, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 10, 2018C71TCANCELLED SECTION 71—
Jan 3, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 11, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 30, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 11, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 11, 2012FIMPFINAL DISPOSITION PROCESSED—
Apr 3, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jan 3, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 23, 2011GPNXNOTIFICATION PROCESSED BY IB—
Oct 18, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 18, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 28, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 28, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 13, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 12, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Sep 12, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Sep 12, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Sep 12, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
Sep 12, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Aug 8, 2011DOCKASSIGNED TO EXAMINER—
Jul 20, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 20, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 1, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 19, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 19, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 19, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 29, 2010TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Dec 29, 2010CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Dec 29, 2010ALIEASSIGNED TO LIE—
Dec 2, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 21, 2010RFNTREFUSAL PROCESSED BY IB—
Oct 29, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Oct 29, 2010RFRRREFUSAL PROCESSED BY MPU—
Oct 29, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 28, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Oct 27, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 25, 2010DOCKASSIGNED TO EXAMINER—
Oct 25, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 22, 2010LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED—
Oct 21, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance