USPTO serial 79087689
COLD OAK
Reviewed by CopyMark Law Group
Reg. 4123510Status 404
- Filing date
- Status date
- Registration date
- Apr 10, 2012
- Examiner
- DELGIZZI, RONALD ERNEST
- Law office
- —
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with COLD OAK?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys | SECTION 71 - CANCELLED | — |
| 007 | Mechanical conveyors and mechanical hoisting devices and installations composed thereof, conveying machines, shaft hoisting installations, namely, skip and cage hoisting installations for shafts, incline hoisting installations, hoisting machines, in the nature of Koepe machines, namely, winders and shaft hoisting machines, and in the nature of drum machines for reeling, for one or more ropes, namely, haulage apparatus, reels, winding towers, conveyor belts, skips, and trolley circulation systems in the nature of loading ramps, mechanical winches, namely, for rope handling, mobile friction winches, mobile shaft winches, loading and unloading machinery, mechanical transfer and unloading devices, namely, unloading machines, equipment, namely, lifting apparatus for the above mentioned hoisting installations, namely, rope lifting gears for machines, fixing devices in the nature of jacks, rope changing devices in the nature of winches and jacks; brake systems for hoisting machines and windlasses, namely, disc brake systems consisting of brake shoes, hydraulic and electrical controls; mechanical flow conveyors and conveying apparatus composed of hydraulic conveyors for the horizontal or vertical transport of solid materials in pipelines or shaft pipes, mechanical conveyors for liquids, namely, cooling liquids, pressure exchangers being parts of machines, mechanical conveyors and installations, namely, conveying apparatus for disposal engineering, namely, for disposal of materials underground; mechanical conveyors for transporting waste and installations for waste transport in the nature of radioactive and toxic waste; transfer and transport casks being parts of machines and used for safely enclosing waste in the nature of radioactive and toxic waste, cranes for handling transfer casks, roller-conveyor apparatus, lifting and loading devices in the nature of lifting installations for the transport of persons and goods, equipment for packaging apparatus, namely, surge bin and filling box, tablet bin with outward-transfer box, bore-hole pipes including sample types for high active waste (HAW) molds and apparatus for storing radioactive and toxic waste, all the aforesaid goods being parts of machines, and control devices for automating all the aforesaid machines and apparatus; related parts for fixing ropes, namely, lifting and clamping devices for shaft hoisting installations; and replacement and structural parts for all the aforesaid goods | SECTION 71 - CANCELLED | — |
| 035 | Organizational project management and project analysis for others, namely, business organizational project management consultancy and business project analysis in the fields of engineering and construction | SECTION 71 - CANCELLED | — |
| 037 | Installation, servicing, repair and maintenance of shaft hoisting, namely, skip and cage hoisting installations for shafts; assembly of products for others, namely, hoisting machines and construction planning, construction project management services, construction of technical installations in the nature of shaft hoisting plants, namely, skip and cage hoisting installations for shafts, and technical support services, namely, providing technical advice in the field of installation, servicing, repair and maintenance of shaft hoisting machines * in the field of mining * | SECTION 71 - CANCELLED | — |
| 041 | Organization and implementation of training in the field of engineering and construction; organization and implementation of seminars and workshops; all of the aforementioned training in the field of engineering and construction * in the field of mining * | SECTION 71 - CANCELLED | — |
| 042 | Engineering services, namely, engineering for the underground mining industry; Engineering services, namely, technical project planning of shaft hoisting installations; computer software development in the field of automation software; technical project management in the nature of engineering services in the fields of underground mining and shaft hoisting installations | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by SIEMAG TECBERG GmbH
- Other trademarks owned by SIEMAG TECBERG GmbH
- Other trademarks owned by SIEMAG TECBERG GmbH
- Other trademarks owned by PESCHKE GmbH & Co. KG
- Other trademarks in Class 006
- Other trademarks in Class 007
- Other trademarks in Class 035
- Other trademarks in Class 037
- Other trademarks in Class 041
- Other trademarks in Class 042
- Similar marks named COLD OAK
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 19, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 19, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 29, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 6, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 6, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jul 16, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 16, 2018 | C71T | CANCELLED SECTION 71 | — |
| Apr 10, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 17, 2012 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 14, 2012 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Oct 30, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 30, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jul 30, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jul 30, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 10, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 27, 2012 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Apr 27, 2012 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Apr 27, 2012 | PLGL | ASSIGNED TO PARALEGAL | — |
| Apr 10, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 21, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 21, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Feb 10, 2012 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 24, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 6, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 4, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 19, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 14, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 7, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 6, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 6, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 6, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 6, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 16, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 16, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 9, 2011 | ALIE | ASSIGNED TO LIE | — |
| May 2, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 21, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Nov 1, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 1, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 30, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 29, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 29, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 25, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 25, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 21, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |