Drawing for HELIOTROUGH

USPTO serial 79087860

HELIOTROUGH

Reviewed by CopyMark Law Group

Reg. 4036972Status 404
Filing date
Status date
Registration date
Oct 11, 2011
Examiner
KING, CHRISTINA B
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with HELIOTROUGH?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jan Tamulewicz

Jan Tamulewicz Katten Muchin Rosenman LLP575 Madison AvenueNew York, NY 10022-2585UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; metal building materials, namely, torque tubes, pylons in the nature of structural beams and poles, pipe support bridges, metal counter weights, soffits, fascia, ceiling boards and floor boards; transportable buildings of metal; materials of metal for construction of railway tracks; non-electric cables and wires of common metal; small items of metal hardware for supporting structures, namely, pipe supports, cantilever arms, pipe bearings; pipes and tubes of metal; metal safes; hardware of common metal, namely, connection bolts, nuts, washers, anchor bolts, iron oresSECTION 71 - CANCELLED—
009Photovoltaic cells for electricity generation also including a solar thermal collector sold as a unitSECTION 71 - CANCELLED—
011Solar thermal installations, namely, solar thermal modules including parabolic mirrors designed for solar energy and structural components therefor sold as a unit; solar thermal collectors for heatingSECTION 71 - CANCELLED—
019Non-metal pipes and pipe groups for solar thermal installationsSECTION 71 - CANCELLED—
035Electronic data processing consultancy in connection with the marketing, production, installation and maintenance of machines for pumps, solar installations, solar thermal installations, photovoltaic installations, photovoltaic modules and renewable energy generation installationsSECTION 71 - CANCELLED—
037Planning and consultancy for building construction; installation, maintenance and repair of energy production installations and machines, in particular solar thermal and photovoltaic installationsSECTION 71 - CANCELLED—
042Building and construction drafting and architectural consultancy, providing technical planning and product research and development, all the aforesaid services in connection with the construction of energy production installations, in particular solar thermal and photovoltaic installationsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 10, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Jul 10, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 15, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 6, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 6, 2019INPCINVALIDATION PROCESSED—
Jan 18, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 18, 2018C71TCANCELLED SECTION 71—
Jun 15, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 25, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 25, 2012FIMPFINAL DISPOSITION PROCESSED—
Jan 11, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 11, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 5, 2011ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jul 26, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 6, 2011NPUBNOTICE OF PUBLICATION—
Jun 17, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 15, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 15, 2011CNEAEXAMINERS AMENDMENT MAILED—
Jun 15, 2011XAECEXAMINER'S AMENDMENT ENTERED—
Jun 15, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
Jun 2, 2011CEAPEXAMINER'S AMENDMENT/PRIORITY ACTION MAILED—
Jun 1, 2011CPEAEXAMINERS AMENDMENT AND/OR PRIORITY ACTION - COMPLETED—
Apr 29, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 29, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 22, 2011ALIEASSIGNED TO LIE—
Apr 18, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 18, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 18, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Dec 4, 2010RFNTREFUSAL PROCESSED BY IB—
Nov 12, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Nov 12, 2010RFRRREFUSAL PROCESSED BY MPU—
Nov 12, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 11, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 2, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Oct 29, 2010DOCKASSIGNED TO EXAMINER—
Oct 29, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Oct 28, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance