USPTO serial 79087943
FRAME+
Reviewed by CopyMark Law Group
Reg. 4162819Status 404
- Filing date
- Status date
- Registration date
- Jun 26, 2012
- Examiner
- MIDDLETON, BERNICE L
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with FRAME+?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
87772 Pfaffenhausen, DE
87772 Pfaffenhausen, DE
87772 Pfaffenhausen, DE
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Paul D. Bianco
Paul D. Bianco Fleit Gibbons Gutman Bongini & Bianco PL21355 East Dixie HighwaySuite 115Miami, FL 33180Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials, namely, metal profiles, metal pipes, metal plates, sheet metal plates, metal foils, metal windows, metal portals, namely, metal doors, metal gates, metal shutters, metal wickets, and metal doorway barriers; prefabricated and partly-prefabricated beams and frameworks consisting primarily of metal and glass, and kits therefor, comprised of facade panels, facade systems primarily comprised of profiles, pipes, tubes, gussets, rods, connectors used as supports; conservatories, namely, in the form of a winter garden as annex to buildings and pavilions, namely, in the form of transportable and immobile metal buildings for permanent and temporary use, especially in the form of gazebos; metal profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings; metal pipes, metal plates, namely, metal wainscots, metal sheathing, metal coverings, metal wall panels, and metal sheet plates; metal sheets, metal foils, metal window frames, metal doors, portals, namely, metal gates, metal shutters, metal wickets, and metal doorway barriers; cladding for construction and building of metal; cladding for windows, doors, facades, roofs, conservatories for building and construction of metal; metal glazing frames for supporting window panes; prefabricated metal components, namely, metal profiles, metal tubes, metal gussets and metal connectors, for doors, windows, building facades, canopies, gazebos and roofs; canopy roofs and cantilever roofs consisting primarily of metal frames, metal awnings and metal profiles; closing and opening devices for windows and doors, namely, metal window shutters, metal window cranks, metal crank handles, and metal pulleys; metal post and rail systems, mainly consisting of metal profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings for installation between windows, doors, frameworks and buildings; metal facade panels and aluminum facades, all for building and construction | SECTION 71 - CANCELLED | — |
| 017 | Seals, namely, non-metal seals primarily of plastic, EPDM, namely, Ethylene Propylene Dyeline Monomer rubber, sponge rubber, polyethylene, polyurethane, polystyrene, or of composites thereof, in particular for facades or windows; heat insulating strips primarily of plastic, EPDM, namely, Ethylene Propylene Dyeline Monomer rubber, sponge rubber, polyethylene, polyurethane, polystyrene, or of composites thereof, in particular for facades or windows; heat insulating seals primarily of plastic, EPDM, namely, Ethylene Propylene Dyeline Monomer rubber, sponge rubber, polyethylene, polyurethane, polystyrene, or of composites thereof, in particular for facades or windows; sealing materials primarily of plastic, EPDM, namely, Ethylene Propylene Dyeline Monomer rubber, sponge rubber, polyethylene, polyurethane, polystyrene, or of composites thereof, in particular for windows or facades; non-metallic insulating materials primarily of plastic, EPDM, namely, Ethylene Propylene Dyeline Monomer rubber, sponge rubber, polyethylene, polyurethane, polystyrene, or of composites thereof, in particular for windows or facades | SECTION 71 - CANCELLED | — |
| 019 | Building materials not of metal, namely, non-metallic profiles, non-metallic pipes, non-metallic plates, non-metallic sheet plates, non-metallic foils, non-metallic windows, non-metallic portals, namely, non-metallic doors, non-metallic gates, non-metallic shutters, non-metallic wickets, and non-metallic doorway barriers; prefabricated and partly-prefabricated glass structures and frameworks consisting primarily of glass and not of metal, and kits therefor, comprised of facade panels, facade systems primarily comprised of profiles, pipes, tubes, gussets, rods, connectors used as supports, conservatories, namely, in the form of a winter garden as annex to buildings, and pavilions, namely, in the form of transportable and immobile non-metallic buildings for permanent and temporary use, especially in the form of gazebos; non-metal profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings; rigid non-metal pipes, plates, namely, non-metallic wainscots, non-metallic sheathing, non-metallic coverings, non-metallic wall panels, non-metallic sheet plates, all for building and construction; sheets, foils, window frames, non-metallic doors, and portals for building and construction, namely, non-metallic gates, non-metallic shutters, non-metallic wickets, and non-metallic doorway barriers; cladding for construction and building not of metal, cladding for windows, doors, facades, roofs, and conservatories, all for building and construction; glazing frames for supporting window panes; prefabricated non-metallic components, namely, non-metallic profiles, non-metallic tubes, non-metallic gussets and non-metallic connectors, for doors, windows, building facades, canopies, gazebos and roofs; canopy roofs and cantilever roofs, namely, non-metallic roof coverings; closing and opening devices for windows and doors, namely, non-metallic shutters; non-metallic post and rail systems, mainly consisting of non-metallic profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings for installation between windows, doors, frameworks and buildings; facade panels and timber facades, all for building and construction; all the aforesaid goods primarily of plastic, wood, glass, stone, or a combination of these materials | SECTION 71 - CANCELLED | — |
| 037 | Building construction, in particular erecting, assembling, constructing and repairing of facades and conservatories; installation of facades and conservatories | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Raico Bautechnik GmbH
- Other trademarks owned by Raico Bautechnik GmbH
- Other trademarks owned by Raico Bautechnik GmbH
- Other trademarks in Class 006
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 037
- Similar marks named FRAME+
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 11, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 11, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 1, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Oct 7, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Oct 7, 2019 | INPC | INVALIDATION PROCESSED | — |
| Oct 1, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 1, 2019 | C71T | CANCELLED SECTION 71 | — |
| Oct 5, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 26, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 1, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 13, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 27, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 27, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 26, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 26, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 23, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Apr 10, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 10, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 4, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 28, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Mar 28, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Mar 21, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 8, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 6, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 29, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 29, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 29, 2011 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Oct 12, 2011 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 12, 2011 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 12, 2011 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 25, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 25, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 11, 2011 | ALIE | ASSIGNED TO LIE | — |
| Jun 24, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 21, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 29, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 29, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 27, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 26, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 16, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 2, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 29, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 28, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |