USPTO serial 79088070
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Anti-friction bearings; bearings for industrial machines and equipment, namely, mining equipment, quarrying equipment, machines used in the manufacture and processing of paper and pulp, food, beverages and metal; bearings for industrial machines and equipment used in the extraction industries; bearings for industrial machines and equipment used in the printing industry; bearings for industrial machines and equipment for power generation; bearings for industrial machines and equipment used in civil engineering projects, namely, the building of railways; bearings for motors, gearboxes, and engines,excluding land vehicle motors; bearings for use in theme park rides; bearings for shafts; bearings for transmission shafts; parts and fittings therefor, namely, rings for bearings, bearing brackets, bushings for bearings, discs for clutch thrust bearings | SECTION 70 - CANCELLED | — |
| 012 | Anti-friction bearings; bearings for use in land, air and sea vehicles and vessels; anti-friction bearings for motors, gearboxes, and engines; release bearings for the friction clutches of land vehicles; transmission bearings for land vehicles; parts and fittings therefor, namely, rings for bearings, bearing brackets, bushings for bearings, discs for clutch thrust bearings | SECTION 70 - CANCELLED | — |
| 042 | Consultancy services in the field of design of anti-friction bearings; consultancy services in the field of design of bearings for industrial machines and equipment, namely, machines used in the manufacture and processing of papers and pulp, food, beverages and metal, machines and equipment used in the extraction industries, namely, the mining, quarrying dredging, oil and gas extraction industries, machines and equipment used in the printing industry, machines and equipment for power generation, machines and equipment used in civil engineering projects, motors, gearboxes, and engines, shafts and transmission shafts; consultancy services in the bearings for industrial machines and equipment, namely, machines used in the manufacture and processing of paper and pulp, food, beverages and metal, machines and equipment used in the extraction industries, namely, the mining, quarrying, dredging, oil and gas extraction industries, machines and equipment used in the printing industry, machines and equipment for power generation, machines and equipment used in civil engineering projects; design services for parts of vehicle motors, namely, anti-friction bearings for motors, gearboxes, and engines, bearings for use in rings for bearings, bearing brackets, bushings for bearings, discs for clutch thrust bearings; computer aided design engineering services; engineering services for the design of anti-friction bearings for industrial machines and equipment, namely, machines used in the manufacture and processing of paper and pulp, food, beverages, and metal, machines and equipment used in the extraction industries, namely, the mining, quarrying, dredging, oil and gas extraction industries, machines and equipment used in the printing industry, machines and equipment for power generation, machines and equipment used in civil engineering projects, motors, gearboxes, and engines, shafts and transmission shafts and for use in theme park rides | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 20, 2017 | OP.T | OPPOSITION TERMINATED NO. 999999 | — |
| Dec 20, 2017 | OP.S | OPPOSITION SUSTAINED NO. 999999 | — |
| Aug 18, 2017 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Aug 17, 2017 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jun 13, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Apr 16, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Aug 21, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 10, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 30, 2011 | RFNP | REFUSAL PROCESSED BY IB | — |
| Dec 2, 2011 | OP.I | OPPOSITION INSTITUTED NO. 999999 | — |
| Nov 30, 2011 | OPNS | OPPOSITION NOTICE (IB REFUSAL) SENT TO IB | — |
| Nov 30, 2011 | OPNC | OPPOSITION NOTICE (IB REFUSAL) CREATED | — |
| Aug 18, 2011 | ETOF | EXTENSION OF TIME TO OPPOSE RECEIVED | — |
| Aug 2, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 2, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 27, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 24, 2011 | ALIE | ASSIGNED TO LIE | — |
| Jun 22, 2011 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jun 21, 2011 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 21, 2011 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jun 21, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 21, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 21, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Mar 28, 2011 | LOPT | LETTER OF PROTEST EVIDENCE FORWARDED | — |
| Jan 15, 2011 | RFNP | REFUSAL PROCESSED BY IB | — |
| Dec 21, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 20, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 19, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 18, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 18, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 12, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 8, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 5, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |