USPTO serial 79088783
S SENECA
Reviewed by CopyMark Law Group
Status 402
- Filing date
- Status date
- Registration date
- —
- Examiner
- BLANE, SUZANNE
- Law office
- TMO LAW OFFICE 114 - EXAMINING ATTORNEY ASSIGNED
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with S SENECA?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Measuring, signaling, checking, data processing and transmission data apparatus and instruments; apparatus and instruments for automation; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity | SECTION 70 - CANCELLED | — |
| 037 | Building construction; repair; installation services; in particular installation and maintenance of electrotechnical and electronic apparatus, installations and systems for the distribution, production and use of energy, for processing and transmission data and signals, for measuring, controlling and regulating electric and non-electric functions, for the monitoring, security, checking and communications of apparatus and systems for automation; combustion, heating, refrigerating, ventilating and air conditioning apparatus and installations, sanitary fixtures and installations and heating technology installations | SECTION 70 - CANCELLED | — |
| 042 | Scientific and technological services and research and design relating thereto; industrial analysis and research services; design and development of computer hardware and software; in particular, research and development in the industrial automation field and apparatus relating thereto; design of data processing apparatus and systems; engineering services; technical consultancy for others; design and development in the field of electrical engineering and electronics apparatus, installations and instruments, and in the field of apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating, water supply and mixing and regulation of gases and liquids systems | SECTION 70 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Feb 6, 2021 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Feb 5, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Apr 30, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 22, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Feb 10, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 24, 2012 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jul 22, 2012 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 29, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 29, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 11, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 11, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jun 30, 2011 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 29, 2011 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Dec 17, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 1, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 1, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 30, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 29, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 16, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 13, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 12, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 11, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |