USPTO serial 79089002
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Kingspan Holdings (IRL) Limited
Kingscourt, Co. Cavan, IE
Kingspan Holdings (IRL) Limited
Kingscourt, Co. Cavan, IE
Kingspan Holdings (IRL) Limited
Kingscourt, Co. Cavan, IE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jeannine A Rittenhouse
Jeannine A Rittenhouse IpHorgan Ltd.1130 Lake Cook RoadSuite 240Buffalo Grove, IL 60089| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Equipment and apparatus for regenerative energy production, namely, wind power turbines, wind energy converters, windmills, hybrid solar or wind-diesel turbines, towers for wind energy turbines, rotors and rotor blades for wind energy turbines, aerogenerators for extracting usable energy from winds; parts of wind turbine motors, namely, compact drive systems; electricity generators; machine housing, namely, nacelles for wind energy turbines; wind turbines for power generation; wind turbines; generators for wind turbines for the production of wind power; machines for the production of wind power; wind power plants; wind-powered electricity generators for the generation of power; turbine driven machines for electricity production and energy storage; machine boiler scale collectors; pumps for solar heating systems; parts and fitting for all the aforesaid goods | SECTION 71 - CANCELLED | — |
| 009 | Solar panels for production of electricity; solar energy collectors for electricity generation; apparatus and instruments for the supply, regulation, control, storage and distribution of electricity; apparatus for control and monitoring of domestic central heating systems; electricity generating apparatus utilizing solar power; solar collectors; apparatus for measuring and controlling temperature, namely, thermostats, air temperature sensors, data processing and display equipment for monitoring of temperature and humidity, electronic display apparatus for monitoring of temperature and humidity, pump control units, and data logging equipment for monitoring of temperature and humidity; alarms, electricity meters, electricity transformers, electricity connectors, batteries, battery chargers, electric switches, electric power controllers; data processing apparatus and computers, in particular for monitoring and controlling wind energy installations, wind measuring devices, automatic and remote control equipment for electricity generators and wind energy installations, electrical installations for the remote control of wind energy installations, computers and computer software for the monitoring and control of wind energy installations, electric cables, condensers, operating system software for the aforesaid goods, controls for the aforesaid goods, parts and fittings for the aforementioned goods | SECTION 71 - CANCELLED | — |
| 011 | Apparatus for lighting, heating, refrigerating, ventilating, water supply and air conditioning, namely, domestic central heating radiators, solar energy based cooling apparatus, radiators, solar collectors for heating, solar energy collectors, solar furnaces, solar heat collection panels, solar lighting fixtures, thermal storage apparatus for storing solar energy, heat pumps, pipes being parts of temperature control systems, refrigerating cabinets, portable refrigerating rooms, steam rooms, solar hot water tanks, water conduits, apparatus for heating or cooling air in enclosed spaces, temperature control valves for central heating installations, and parts and fittings for the aforementioned goods | SECTION 71 - CANCELLED | — |
| 037 | Installation, maintenance, repair, construction, replacement or overhaul of solar panes, apparatus for capture of solar energy, solar energy collectors for electricity generation, wind energy installations, windmills, wind turbines, wind power plants, controls for the aforesaid goods and operating systems for the aforesaid goods; erection and maintenance of windmills and wind or solar power plants; installation, maintenance, repair and servicing of central heating systems, boilers, pumps, storage tanks, heating products and apparatus, solar panels, apparatus for capture of solar energy, solar energy collectors for electricity generation, controls for the aforesaid goods, and operating systems for the aforesaid goods; building construction and repair; advisory and information services relating to the aforesaid | SECTION 71 - CANCELLED | — |
| 040 | Custom manufacture of solar panels, apparatus for capture of solar energy, solar energy collectors for electricity generation, controls for the aforesaid goods, operating systems for the aforesaid goods, and parts, components and fittings for the aforesaid goods; production of energy, generation of energy, generation of electricity, rental of electricity generators, rental of turbines for electricity generators, rental of apparatus, equipment and instruments for the generation of power and electricity; power and electrical power generation services; production of energy; treatment of fuels; advice, information and consultancy in connection with the aforesaid | SECTION 71 - CANCELLED | — |
| 042 | Setting up, operating, managing and supervision of wind farms for others; consultancy for design of wind power plants; design of wind- or solar-powered installations and connection systems therefor; planning and consultancy for building and construction of wind- or solar-powered installations and connection systems therefor; technical consultancy in the fields of setting up and operating wind- or solar-powered installations, creating data processing programs for such installations, planning building and construction of such installations, and scientific and industrial research relating to such installations; technical consultancy on energy supply, the use of energy, use of renewable energy sources, and design of wind energy parks | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 25, 2020 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Dec 25, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 30, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jul 13, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 13, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jun 19, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 19, 2018 | C71T | CANCELLED SECTION 71 | — |
| Mar 13, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 31, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 25, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 6, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 18, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 18, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 13, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 13, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 25, 2012 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Dec 30, 2011 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Dec 27, 2011 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Dec 27, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 7, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 7, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 7, 2011 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Nov 19, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 16, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 16, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 16, 2011 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 16, 2011 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 16, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 30, 2011 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 30, 2011 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 30, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 8, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 8, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 4, 2011 | ALIE | ASSIGNED TO LIE | — |
| May 27, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 17, 2010 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 2, 2010 | CNRT | NON-FINAL ACTION MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 2, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 30, 2010 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Nov 30, 2010 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Nov 29, 2010 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Nov 28, 2010 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 23, 2010 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 19, 2010 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 19, 2010 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 18, 2010 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |