Drawing for KINGSPAN

USPTO serial 79089002

KINGSPAN

Reviewed by CopyMark Law Group

Reg. 4110675Status 404
Filing date
Status date
Registration date
Mar 13, 2012
Examiner
FINE, STEVEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with KINGSPAN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Jeannine A Rittenhouse

Jeannine A Rittenhouse IpHorgan Ltd.1130 Lake Cook RoadSuite 240Buffalo Grove, IL 60089

Goods and services

ClassDescriptionStatusFirst use
007Equipment and apparatus for regenerative energy production, namely, wind power turbines, wind energy converters, windmills, hybrid solar or wind-diesel turbines, towers for wind energy turbines, rotors and rotor blades for wind energy turbines, aerogenerators for extracting usable energy from winds; parts of wind turbine motors, namely, compact drive systems; electricity generators; machine housing, namely, nacelles for wind energy turbines; wind turbines for power generation; wind turbines; generators for wind turbines for the production of wind power; machines for the production of wind power; wind power plants; wind-powered electricity generators for the generation of power; turbine driven machines for electricity production and energy storage; machine boiler scale collectors; pumps for solar heating systems; parts and fitting for all the aforesaid goodsSECTION 71 - CANCELLED
009Solar panels for production of electricity; solar energy collectors for electricity generation; apparatus and instruments for the supply, regulation, control, storage and distribution of electricity; apparatus for control and monitoring of domestic central heating systems; electricity generating apparatus utilizing solar power; solar collectors; apparatus for measuring and controlling temperature, namely, thermostats, air temperature sensors, data processing and display equipment for monitoring of temperature and humidity, electronic display apparatus for monitoring of temperature and humidity, pump control units, and data logging equipment for monitoring of temperature and humidity; alarms, electricity meters, electricity transformers, electricity connectors, batteries, battery chargers, electric switches, electric power controllers; data processing apparatus and computers, in particular for monitoring and controlling wind energy installations, wind measuring devices, automatic and remote control equipment for electricity generators and wind energy installations, electrical installations for the remote control of wind energy installations, computers and computer software for the monitoring and control of wind energy installations, electric cables, condensers, operating system software for the aforesaid goods, controls for the aforesaid goods, parts and fittings for the aforementioned goodsSECTION 71 - CANCELLED
011Apparatus for lighting, heating, refrigerating, ventilating, water supply and air conditioning, namely, domestic central heating radiators, solar energy based cooling apparatus, radiators, solar collectors for heating, solar energy collectors, solar furnaces, solar heat collection panels, solar lighting fixtures, thermal storage apparatus for storing solar energy, heat pumps, pipes being parts of temperature control systems, refrigerating cabinets, portable refrigerating rooms, steam rooms, solar hot water tanks, water conduits, apparatus for heating or cooling air in enclosed spaces, temperature control valves for central heating installations, and parts and fittings for the aforementioned goodsSECTION 71 - CANCELLED
037Installation, maintenance, repair, construction, replacement or overhaul of solar panes, apparatus for capture of solar energy, solar energy collectors for electricity generation, wind energy installations, windmills, wind turbines, wind power plants, controls for the aforesaid goods and operating systems for the aforesaid goods; erection and maintenance of windmills and wind or solar power plants; installation, maintenance, repair and servicing of central heating systems, boilers, pumps, storage tanks, heating products and apparatus, solar panels, apparatus for capture of solar energy, solar energy collectors for electricity generation, controls for the aforesaid goods, and operating systems for the aforesaid goods; building construction and repair; advisory and information services relating to the aforesaidSECTION 71 - CANCELLED
040Custom manufacture of solar panels, apparatus for capture of solar energy, solar energy collectors for electricity generation, controls for the aforesaid goods, operating systems for the aforesaid goods, and parts, components and fittings for the aforesaid goods; production of energy, generation of energy, generation of electricity, rental of electricity generators, rental of turbines for electricity generators, rental of apparatus, equipment and instruments for the generation of power and electricity; power and electrical power generation services; production of energy; treatment of fuels; advice, information and consultancy in connection with the aforesaidSECTION 71 - CANCELLED
042Setting up, operating, managing and supervision of wind farms for others; consultancy for design of wind power plants; design of wind- or solar-powered installations and connection systems therefor; planning and consultancy for building and construction of wind- or solar-powered installations and connection systems therefor; technical consultancy in the fields of setting up and operating wind- or solar-powered installations, creating data processing programs for such installations, planning building and construction of such installations, and scientific and industrial research relating to such installations; technical consultancy on energy supply, the use of energy, use of renewable energy sources, and design of wind energy parksSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 25, 2020DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Dec 25, 2020DETHDEATH OF INTERNATIONAL REGISTRATION
Nov 30, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB
Jul 13, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jul 13, 2019INPCINVALIDATION PROCESSED
Jun 19, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Oct 19, 2018C71TCANCELLED SECTION 71
Mar 13, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
May 31, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED
Oct 25, 2012GPNXNOTIFICATION PROCESSED BY IB
Jul 6, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jun 18, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB
Jun 18, 2012FIMPFINAL DISPOSITION PROCESSED
Jun 13, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 13, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 25, 2012CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Dec 30, 2011CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Dec 27, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Dec 27, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 7, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 7, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Dec 7, 2011NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 19, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 16, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 16, 2011XAECEXAMINER'S AMENDMENT ENTERED
Nov 16, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 16, 2011GNEAEXAMINERS AMENDMENT E-MAILED
Nov 16, 2011CNEAEXAMINERS AMENDMENT -WRITTEN
Jun 30, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 30, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 8, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 8, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 4, 2011ALIEASSIGNED TO LIE
May 27, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2010RFNTREFUSAL PROCESSED BY IB
Dec 2, 2010CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 2, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 30, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Nov 30, 2010RFRRREFUSAL PROCESSED BY MPU
Nov 29, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 28, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 23, 2010MAFRAPPLICATION FILING RECEIPT MAILED
Nov 19, 2010DOCKASSIGNED TO EXAMINER
Nov 19, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Nov 18, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance