Drawing for LEMMINKÄINEN

USPTO serial 79089097

LEMMINKÄINEN

Reviewed by CopyMark Law Group

Reg. 4169679Status 404
Filing date
Status date
Registration date
Jul 10, 2012
Examiner
MAKHDOOM, SAIMA
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LEMMINKÄINEN?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Common metals and their alloys; metal building materials, namely, profiles, tubes, scaffolds, building flashings, chimneys, claddings for building and construction, metal roofs and roofings, stair cases, prefabricated platforms, prefabricated metal bridges, metal wall frames and panels, metal gates, metal doors, metal windows and window casements, metal piles and armour steel; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery in the nature of small items of metal hardware, namely, metal sash fasteners for windows, bolts, nails, rivets, screws, brads, clamps, cotter pins, ball lock pins, white metal pins, nuts; pipes and tubes of metal; metal safes; metal ores; metal wire fences, gates and latch bars; metal stands for audience, namely, metal stands for audience seating and metal bleachers, and metal grating; metal gutters; metal roofingsSECTION 71 - CANCELLED—
019Non-metallic building materials, namely, sawn timber and un-sawn timber for use in construction industries; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; bituminous roofing materials and waterproofing products, namely, bitumen roofing membranes, bitumen shingles, bitumen roofing sealants and fixatives; concrete covering stones, ceramic and concrete tiles, edging, fences, walls and wall stones, concrete breeze-blocks, non-metal water channels in the nature of gutters for roofs, balconies, streets and yards; non-metal construction materials, namely, cups for collecting rain water; gouge slabs of concrete, non-metal exterior stairs, concrete driving hindrances and bollards, staircase units of mosaic concrete, natural stone or concrete, steps in the nature of non-metal stairs; and cement chair slabs; building materials, namely, asphalt and bitumen roof coating; non-metallic fences, gates and latch barsSECTION 71 - CANCELLED—
037Building construction; building repair; installation services in the field of residential construction, commercial and office construction, namely, installation of electrical systems, HVAC systems, plumbing systems, fire protection systems, alarm systems, lighting systems, cooling systems, heating systems, telecommunication systems, data network systems, security systems, automation systems, irrigation systems, and structural and decorative building elements and components, namely, building timber, building stones, building glass, concrete blocks, bricks, pavers, posts, slabs, panels, beams, girders, drywall, columns, paving stones, tiles, walls, wall forms, facades, floor slabs, flooring, shutters, shingles, siding, pipes, paneling, gutters, windows and window frames, doors and door frames, fireplaces, chimneys, stairs, and staircases, ceilings, and roofing; construction of industrial and logistic buildings, underground structures, parking structures, underground sport facilities, roads, bridges, railroads and tunnels; construction of sports and recreational facilities; infrastructure construction of roads, streets and rail networks; residential building construction services, municipal infrastructure construction services, water supply infrastructure construction services, sewer infrastructure construction services, public transportation infrastructure construction services, bridge infrastructure construction services, airport infrastructure construction services, pedestrian tunnels infrastructure construction services, and noise barrier infrastructure construction services; infrastructure building construction services; installation, repair and maintenance services related to technical building services; consulting services related to residential construction, infrastructure construction and installation, repair and maintenance of technical building services; repair and maintenance services of real estate; quarrying, crushing and screening of minerals aggregate; construction services, namely, asphalt paving and foundation structuring; installations, maintenance and repair of automation systems; metal and steel structures construction; building of telecommunications networksSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 2, 2020DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Oct 2, 2020DETHDEATH OF INTERNATIONAL REGISTRATION—
Dec 13, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 5, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 5, 2019INPCINVALIDATION PROCESSED—
Oct 15, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 15, 2019C71TCANCELLED SECTION 71—
Oct 25, 2018CHLDCHANGE OF OWNER RECEIVED FROM IB—
Aug 30, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 10, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
May 11, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 1, 2012GPNXNOTIFICATION PROCESSED BY IB—
Nov 4, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Oct 17, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Oct 17, 2012FIMPFINAL DISPOSITION PROCESSED—
Oct 10, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 10, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 18, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 24, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Apr 24, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 18, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 18, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 4, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 4, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 4, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Mar 21, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Mar 19, 2012EXPTEXPARTE APPEAL TERMINATED—
Mar 19, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 1, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 1, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Feb 29, 2012ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Feb 29, 2012EXPIEX PARTE APPEAL-INSTITUTED—
Feb 29, 2012JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Feb 29, 2012EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Dec 27, 2011GNS1NOTIFICATION OF SUBSEQUENT FINAL EMAILED—
Dec 27, 2011GNCFCONTINUATION OF FINAL REFUSAL E-MAILED—
Dec 27, 2011CNCFACTION CONTINUING A FINAL - COMPLETED—
Nov 30, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 30, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 7, 2011ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Aug 31, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 31, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 31, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 10, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 10, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 29, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 30, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 30, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 30, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 12, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 12, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 12, 2011CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Jan 11, 2011ALIEASSIGNED TO LIE—
Dec 21, 2010TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 17, 2010RFNTREFUSAL PROCESSED BY IB—
Dec 1, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 1, 2010RFRRREFUSAL PROCESSED BY MPU—
Nov 30, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Nov 29, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 26, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 22, 2010DOCKASSIGNED TO EXAMINER—
Nov 22, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 19, 2010LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Nov 18, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance