Drawing for SPIREC

USPTO serial 79089136

SPIREC

Reviewed by CopyMark Law Group

Reg. 4120049Status 706Registered
Filing date
Status date
Registration date
Apr 3, 2012
Examiner
MAKHDOOM, SAIMA
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SPIREC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Rebeccah Gan

Rebeccah Gan Muncy, Geissler, Olds & Lowe, P.C.4000 Legato Road, Suite 310Fairfax, VA 22033UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
011[ Apparatus for heating, refrigeration and water distribution, namely, central heating radiators, hot water tanks, hot water heaters, gas water heaters, air conditioners, air cooling apparatus; heating systems composed primarily of tubes, pipes and manifolds through which warm or high temperature water circulates; heating systems composed primarily of tubes, pipes and manifolds through which cold or low temperature water circulates; apparatus for the exchange of substances and heat for use in refrigeration; heat accumulators and regenerators; air-conditioning apparatus and installations; ] heat exchangers; [ air-conditioning apparatus and systems comprised primarily of air conditioners, air cleaning units; air filters for air conditioning units; central air-conditioning installations for industrial purpose; ] water heaters; [ air-cooling apparatus; ] exchangers and preparation devices for instantaneous and semi-instantaneous hot water production and storage, namely, hot water heaters; [ hot water tanks; gas water heaters; ] heat exchangers, not parts of machines [ ; hot-water heating installations; air-conditioning installations for premises and machines; heat exchangers; water distribution and sanitary installations, namely, tankless water heaters, water filtration apparatus; water coolers; pressure regulations for water installations ]ACTIVE—
037[ Installation, repair and maintenance services in the fields of heat exchange and aeraulics, namely, air conditioning apparatus; boilers; freezing equipment; heating equipment; irrigation devices ]SECTION 71 - CANCELLED—
042[ Technical project study, namely, consulting in the fields of heat exchange and aeraulics project management; heat exchange and aeraulics project management; surveying and engineering services; research and development of new products for others; technical research ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 25, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jun 1, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 31, 2023INPCINVALIDATION PROCESSED—
May 8, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 8, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 8, 202271AGREGISTERED-SEC.71 ACCEPTED—
Aug 30, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 30, 2022ES71TEAS SECTION 71 RECEIVED—
Apr 3, 2021REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Dec 9, 2020CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Nov 12, 2020RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 10, 2020CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
May 7, 2020ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 1, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 1, 2019INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 10, 2019INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 10, 2019INPCINVALIDATION PROCESSED—
Dec 24, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 24, 2018NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 24, 201871.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Apr 12, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Mar 26, 2018ES71TEAS SECTION 71 RECEIVED—
Apr 3, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Dec 12, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Feb 21, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB—
May 5, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jul 5, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jul 5, 2012FIMPFINAL DISPOSITION PROCESSED—
Jul 3, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Apr 3, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 24, 2012ETOPEXTENSION OF TIME TO OPPOSE PROCESS - TERMINATED—
Dec 18, 2011GPNXNOTIFICATION PROCESSED BY IB—
Nov 9, 2011ETOFEXTENSION OF TIME TO OPPOSE RECEIVED—
Oct 11, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Oct 11, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 21, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Sep 21, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Sep 7, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Sep 2, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Aug 31, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Aug 31, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 31, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Aug 10, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 10, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Aug 2, 2011ALIEASSIGNED TO LIE—
Jul 21, 2011ALIEASSIGNED TO LIE—
Jul 13, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 13, 2011PETGPETITION TO REVIVE-GRANTED—
Jul 13, 2011PROATEAS PETITION TO REVIVE RECEIVED—
Jan 29, 2011RFNTREFUSAL PROCESSED BY IB—
Jan 21, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jan 11, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 11, 2011RFRRREFUSAL PROCESSED BY MPU—
Jan 10, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 9, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 31, 2010DOCKASSIGNED TO EXAMINER—
Nov 30, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 26, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 25, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance