Drawing for RITTAL

USPTO serial 79089523

RITTAL

Reviewed by CopyMark Law Group

Reg. 4037041Status 706Registered
Filing date
Status date
Registration date
Oct 11, 2011
Examiner
TANNER, MICHAEL R
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with RITTAL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Thomas J. Mango

Thomas J. Mango Cantor Colburn LLP20 Church Street22nd FloorHartford, CT 06103

Goods and services

ClassDescriptionStatusFirst use
006Cabinets, in particular switchgear cabinets, racks, housings and consoles made primarily of metal, preferably for industry, also air-conditioned, earthquake-proof, vandal-proof or explosion-proof, namely, Prefabricated buildings made substantially of metal for the theft-proof and fire-protected storage of computer hardware components and systems, telecommunications computer networking hardware and systems, and industrial electrical power distribution equipment, Prefabricated air-conditioned buildings made substantially of metal for the theft-proof and fire-protected storage of computer hardware components and systems, telecommunications computer networking hardware and systems and industrial electrical power distribution equipmentACTIVE—
009Cabinets, in particular switchgear cabinets, racks, housings and consoles made primarily of metal, preferably for industry, also air-conditioned, earthquake-proof, vandal-proof or explosion-proof, namely, metal cabinets specially adapted to protect computers, computer networking equipment, industrial electrical power distribution equipment and telecommunications hardware, Mounting racks for computer or telecommunications hardware; Industrial power distribution equipment, namely, busbar systems comprised of electrical cables, electrical circuits, electrical fuses, electrical relays, electrical transformers, and electrical connection boxes; distribution boxes for electrical power, electric distribution consolesACTIVE—
011[ Air conditioning apparatus for use in the cooling of enclosures containing industrial power distribution equipment, computers, computer networking equipment and telecommunications equipment ]SECTION 71 - CANCELLED—
016[ Printed instructional, educational and teaching materials concerning the design, operation and maintenance of electrical power distribution systems, computer networking systems and telecommunications networks ]SECTION 71 - CANCELLED—
019[ Precast concrete enclosures for industrial power distribution equipment, computers, computer networking equipment and telecommunications equipment, namely, prefabricated non-metal structures in the nature of non-metal rooms for the secure industrial storage of industrial power distribution equipment, computers, computer networking equipment and telecommunications equipment; construction material of glass and plastics, namely, non-metal doors and wall panels not of metal ]SECTION 71 - CANCELLED—
020[ Furniture, namely, industrial workstations having multi-use work surfaces for use in a wide variety of fields, computer furniture, computer desks ]SECTION 71 - CANCELLED—
035[ Business consultancy, in particular with regard to the analysis, design and production of business information and data systems, namely, business advisory services in the fields of architecture and interior design as it pertains to electrical power distribution systems, computer networking systems and telecommunications networks ]SECTION 71 - CANCELLED—
036[ Financial services in the nature of financing, namely, equipment financing services, financing of industrial activities ]SECTION 71 - CANCELLED—
037[ Building construction, namely, construction of secure rooms in buildings for use in housing information technology systems and components; construction of buildings for housing information technology centers; installation, repair and maintenance of electrical power distribution systems, computer networking hardware and telecommunications network hardware ]SECTION 71 - CANCELLED—
042[ Technical planning of buildings, in particular secure rooms for information technology, namely, architectural design of secure rooms in connection with information technology; construction management in development and expansion of data and communications locations included in this class, namely, drafting of construction plans for data and communications computer centers, computer project management services in the field of telecommunications; compilation of disaster handbooks in the use and operation of information technology systems, namely, providing technical information about computer disaster recovery; technical analysis and design of power supply, security systems, fire detecting and extinguishing technology, air treatment installations and the organization of data processing and data backup, namely, design of power supply systems, design of securing systems, design of fire alarm, fire detection and fire suppression systems, design of air treatment systems, design of data processing systems and design of data backup systems for others ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Apr 11, 2025CHLDCHANGE OF OWNER RECEIVED FROM IB—
Nov 29, 2024CHLDCHANGE OF OWNER RECEIVED FROM IB—
Jan 26, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Mar 20, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Feb 17, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 16, 2023INPCINVALIDATION PROCESSED—
Dec 28, 2022INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 28, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Apr 28, 202271AGREGISTERED-SEC.71 ACCEPTED—
Apr 28, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Sep 30, 2021ES71TEAS SECTION 71 RECEIVED—
Oct 11, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 28, 2020INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Aug 25, 2020INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 7, 2020RNWLINTERNATIONAL REGISTRATION RENEWED—
Dec 26, 2019LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Dec 25, 2019COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Nov 14, 2019PLGLASSIGNED TO PARALEGAL—
Sep 27, 2019LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Mar 14, 2019INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Feb 28, 2019INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 28, 2018NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Jun 28, 201871AGREGISTERED-SEC.71 ACCEPTED—
Jun 8, 2018EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Feb 23, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jan 18, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jan 17, 2018INPCINVALIDATION PROCESSED—
Jan 1, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Dec 14, 2017PR71POST REGISTRATION ACTION MAILED - SEC.71—
Nov 14, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Oct 9, 2017ES71TEAS SECTION 71 RECEIVED—
May 1, 2017NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
May 1, 2017C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
May 1, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 29, 2016ES75TEAS SECTION 71 & 15 RECEIVED—
Nov 7, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED—
Apr 17, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 23, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 23, 2012FIMPFINAL DISPOSITION PROCESSED—
Jan 11, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 11, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 11, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Aug 6, 2011NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jul 26, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 26, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jun 22, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 20, 2011ALIEASSIGNED TO LIE—
Jun 15, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 25, 2011XAECEXAMINER'S AMENDMENT ENTERED—
May 25, 2011GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 25, 2011GNEAEXAMINERS AMENDMENT E-MAILED—
May 25, 2011CNEAEXAMINERS AMENDMENT -WRITTEN—
May 13, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
May 13, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 13, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 1, 2011RFNTREFUSAL PROCESSED BY IB—
Dec 13, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 13, 2010RFRRREFUSAL PROCESSED BY MPU—
Dec 11, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 10, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 7, 2010MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 3, 2010DOCKASSIGNED TO EXAMINER—
Dec 3, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 2, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance