Drawing for NATURAL POWER

USPTO serial 79089644

NATURAL POWER

Reviewed by CopyMark Law Group

Reg. 4159577Status 706Registered
Filing date
Status date
Registration date
Jun 19, 2012
Examiner
RIRIE, VERNA BETH
Law office
GENERIC WEB UPDATE

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with NATURAL POWER?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

David L. May

David L. May Nixon Peabody LLP799 9th Street, NWSuite 500Washington, DC 20001

Goods and services

ClassDescriptionStatusFirst use
009Computers; computer programs, namely, programs for optimizing renewable energy site layout, operational site monitoring, control of light detection and ranging equipment, computational fluid dynamics code development and meteorological and power forecasting on sites; computer software, namely, software for optimizing renewable energy site layout, operational site monitoring, control of light detection and ranging equipment, computational fluid dynamics code development and meteorological and power forecasting on sites; data processing apparatus and equipment, namely, computers and network and Internet servers; electronic apparatus for the input, output, processing, storage and retrieval of data, namely, light detection and ranging equipment; apparatus and instruments for linking computers, namely, networking apparatus, namely, computer cables, wireless computer network extenders, and computer networking hubs; [ resource measurement apparatus, namely, rain gauges, ] particle counters for measuring air quality, electric meters for wind turbines; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, light detection and ranging apparatusACTIVE
035Professional business planning and consultancy in the field of energy generating installations; information, advisory and consultancy services relating to the aforementioned servicesACTIVE
036Financial affairs, namely, due diligence on project portfolios, companies and technology devices; project costing, namely, land valuation for energy projects; preparation and analysis of financial reports; preparation and analysis of financial research; financial planning and management; financial studies, evaluations and appraisals; consultancy, information and advisory services relating to all of the aforesaid services; preparing reports, namely, financial reports and adviceACTIVE
037[ Building construction; ] repair of renewable energy devices; installation services of all renewable energy related equipment, excluding software; construction project management in the field of renewable energy; construction, erection, installation, repair, refurbishment, servicing, maintenance and dismantling of wind farms and renewable energy sites; installation of meteorological masts; site investigations, namely, ground inspections during the construction of a renewable energy site; installation of free standing lattice towers and related apparatus; installation, maintenance and repair of wind towers and anemometers; information, advisory and consultancy services relating to the aforementioned servicesACTIVE
038Telecommunications, namely, satellite transmission of signals used for personnel and equipment tracking; providing on-line forums for providing renewable energy site data; providing multiple user access to computer networks for the transfer and dissemination of information; electronic distribution of publications, reports and books, namely, telecommunications transmission of electronic publication, report and book files via computer networks; [ interactive electronic conferences, namely, providing facilities for video conferencing and web conferencing services for renewable energy workshops; ] electronic mail services; electronic messaging services; communication by electronic mail systems; data transmission by electronic mail; providing access to computer databases and to the Internet; information, advisory and consultancy services relating to the aforementioned servicesACTIVE
039Transport, namely, transport of renewable energy equipment to sites onshore and offshore; storage of goods, namely, storage of renewable energy site equipment; [ storage, supply, transport, transmission, distribution and delivery of energy, electricity storage, electricity supply services; electricity transmission services, electricity distribution services; electricity delivery services; ] consultancy, information and advisory services relating to all of the aforesaid services; information, advisory and consultancy services relating to the aforementioned servicesACTIVE
042Scientific and technological services and research and design relating thereto, namely, engineering services and research and design in the field of energy production; industrial analysis and research services in the field of renewable energy, design and development of computer hardware; computer services, namely, renewable energy site monitoring and optimization; systems analysis, namely, renewable energy site production analysis in the nature of scientific analysis of the production potential of renewable energy systems at particular sites; [ computer time sharing; ] computer software research, development and design; computer programming; updating and maintenance of computer software; writing of computer software; advisory services relating to computers and computer software; computer compatibility verification services, namely, data mapping; provision of computer facilities for conferences, events and exhibitions, all relating to computers; geological research; geological surveys; land surveys; project studies, namely, conducting scientific studies of renewable energy project sites; technical information, namely, providing technical planning information for renewable energy sites; agricultural surveys, namely, land surveying of agricultural areas; wind speed measurement services; anemometry services; laser radar services, namely, measurement of wind speed, using laser radar; civil engineering consultancy, research, engineering, all relating to the energy industries, and design and development services, namely, design and development of renewable energy sites; [ prospecting and exploiting fuel resources, namely, oil and gas site prospecting services; ] engineering consultancy; feasibility studies; consultancy, information and advisory services relating to all of the aforesaid services; preparing reports relating to all of the aforesaid services, namely, technical reports; on-line computer services in relation to power, energy and energy distribution and information, advisory and consultancy services relating to the aforementioned services, namely, computer programming, computer system administration for others in the fields of power, energy and energy distribution, and providing information and consulting in connection therewith; civil engineering, consultancy, information and advisory services relating to all of the aforesaid servicesACTIVE
045[ Legal services; ] information, advisory and consultancy services relating to legal matters, tenders, contracts, directives and regulations, namely, providing legal advice and consulting regarding tenders, contracts, directives and regulations, providing legal information in the fields of business tenders, contracts, directives and regulations; licensing services, namely, licensing of intellectual property for renewable energy equipment; security services for the protection of property and individuals, namely, security and safety guard services; facilities management, namely, security guarding and monitoring security systems at renewable energy sites; contract management health and safety inspection and security services, namely, inspection of renewable energy sites for personnel and equipment safety; information and consultancy services relating to health and safety, namely, consulting and providing information in the field of workplace safety; information services relating to health and safety, namely, providing information in the field of workplace safety; information, advisory and consultancy services relating to all of the aforementioned servicesACTIVE

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Oct 2, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Sep 2, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Sep 2, 2023INPCINVALIDATION PROCESSED
Aug 5, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Jul 10, 2023TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Jul 10, 2023ECDRTEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS
Jul 10, 2023ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 10, 2023REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 10, 2023CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED
Jul 10, 2023COARTEAS CHANGE OF OWNER ADDRESS RECEIVED
Dec 5, 2022NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
Dec 5, 202271AGREGISTERED-SEC.71 ACCEPTED
Nov 29, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Jun 21, 2022ES71TEAS SECTION 71 RECEIVED
Jun 19, 2021REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jan 23, 2020RNWLINTERNATIONAL REGISTRATION RENEWED
Jun 13, 2018NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Jun 13, 2018C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.
Jun 11, 2018EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED
Mar 15, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED
Nov 20, 2017PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15
Nov 14, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Oct 10, 2017ES75TEAS SECTION 71 & 15 RECEIVED
Jun 19, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Mar 19, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Feb 28, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB
Feb 28, 2013FIMPFINAL DISPOSITION PROCESSED
Sep 19, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jun 19, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Apr 3, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Apr 3, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 14, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 27, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Feb 23, 2012CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Feb 15, 2012ALIEASSIGNED TO LIE
Feb 10, 2012RINXUSPTO CORRECTION PROCESSED BY IB
Feb 10, 2012CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Jan 30, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Jan 17, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 17, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 17, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 19, 2011GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 19, 2011GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 19, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jun 23, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jun 22, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jun 22, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 22, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jan 15, 2011RFNTREFUSAL PROCESSED BY IB
Dec 22, 2010RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Dec 22, 2010RFRRREFUSAL PROCESSED BY MPU
Dec 21, 2010RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Dec 20, 2010CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 18, 2010MAFRAPPLICATION FILING RECEIPT MAILED
Dec 14, 2010DOCKASSIGNED TO EXAMINER
Dec 14, 2010NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Dec 9, 2010REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance