Drawing for Serial No. 79091863

USPTO serial 79091863

Serial No. 79091863

Reviewed by CopyMark Law Group

Reg. 4004664Status 709
Filing date
Status date
Registration date
Aug 2, 2011
Examiner
KIDWELL WALKER, JACLYN NOEMI
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with Serial No. 79091863?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Timothy T. Wang

Timothy T. Wang Ni, Wang & Massand, PLLC8140 Walnut Hill Ln., Ste. 500Dallas, TX 75231UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001[ Oil cement being putty; adhesives for industrial purposes; viscose for manufacturing and industrial purposes; contact cements; mastic for leather; adhesives for paperhanging; plastisols; starch paste being adhesive, other than for stationery or household purposes; adhesives for wall tiles; glue for industrial purposes; gums being adhesives for industrial and commercial use, other than for stationery or household purposes; chemical curing agents ]SECTION 71 - CANCELLED—
002[ Wood coatings being paints; varnishes; lime wash paint; thinners for lacquers; distempers; siccatives being drying agents for paints; coatings being paints; fixatives being varnishes; agglutinants for paints; primers; lacquers; thinner for paints; non-sticky chemical coating for non-stick pans; water-repellent coating; paints ]SECTION 71 - CANCELLED—
011Regulating accessories for water or gas apparatus and pipes; heat pumps; hydrants; hot water heating installations; anti-splash tap nozzles; water-pipes for sanitary installations, namely, pipes being part of sanitary facilities; water distribution installations, namely, irrigation sprinklers, pipes being parts of plumbing installations, spouts for affixing on walls for baths, basins, and showers; pressure water treatment tanks; floor drains; pipe accessory for hot-water heating device, namely, pipe heating tape, pipe regulators for hot water heating installations, flexible pipes being parts of hot water heating installations; automatic watering installations, namely, irrigations sprinklers; bath fittings, namely, couplers, drains, faucet filters, spouts, traps, valves, baffles; bath tubs; wash-hand basins being parts of sanitary installations; shower cubicle enclosures; sanitary apparatus and installations, namely, sinks, basins, toilets, hot tubs; urinals being sanitary fixtures; toilet seats; toilet bowls; water purification installations; water filtering apparatus; device for drinking water, namely, drinking fountainsSECTION 71 - CANCELLED—
020[ Sideboards; office furniture; furniture; furniture of metal; storage and display racks; washstands; dressing tables; towel closets; bathroom cabinets; cupboards ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 4, 2022INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Nov 9, 2022INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 9, 2022INPCINVALIDATION PROCESSED—
Oct 18, 2022INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Feb 18, 2022C71TCANCELLED SECTION 71—
Jan 28, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 2, 2020REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 8, 2019CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jul 5, 2019CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Jul 4, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Dec 7, 2018NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 15, 2018INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 2, 2018INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 2, 2018INPCINVALIDATION PROCESSED—
Apr 30, 2018INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 15, 2018ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Aug 30, 2017NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Aug 29, 2017NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Aug 29, 201771AGREGISTERED-SEC.71 ACCEPTED—
Aug 28, 2017APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 2, 2017ES71TEAS SECTION 71 RECEIVED—
Mar 27, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Mar 8, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB—
Mar 6, 2012FIMPFINAL DISPOSITION PROCESSED—
Nov 2, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Aug 2, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 12, 2011GPNXNOTIFICATION PROCESSED BY IB—
May 17, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 4, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 4, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Apr 27, 2011NPUBNOTICE OF PUBLICATION—
Apr 9, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 7, 2011ALIEASSIGNED TO LIE—
Mar 24, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 24, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 24, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 24, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 20, 2011RFNTREFUSAL PROCESSED BY IB—
Feb 3, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 3, 2011RFRRREFUSAL PROCESSED BY MPU—
Feb 3, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 2, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 1, 2011MAFRAPPLICATION FILING RECEIPT MAILED—
Jan 28, 2011DOCKASSIGNED TO EXAMINER—
Jan 28, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Jan 27, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance