Drawing for WAVEROCK

USPTO serial 79092615

WAVEROCK

Reviewed by CopyMark Law Group

Reg. 4017938Status 404
Filing date
Status date
Registration date
Aug 30, 2011
Examiner
LOOK, JEFFREY J
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with WAVEROCK?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Engines and motors for the generation of electricity or power; AC-generators; DC-generators; electric and electrostatic generators; electric power generators; electricity generators; all afore-mentioned generators also with superconductors; auxiliary power units for supplying electric power to heat and power generators; servo motors for machines or presses; electric motors for machines; electric starter motors; electric motors for presses; linear motors; engines not for land vehicles; boat or ship motors; boat engines, all of the aforementioned motors and engines also with superconductive wires or superconductive parts; couplings for machines; shaft couplings not for land vehicles; generators for wind turbines, wind turbines, wind-powered electricity generators; water turbines for generating electrical power; motors, gears and drives for orientating solar panels; parts of wind turbine motors, namely, compact drive systems; variable frequency drives for large power applications in the marine and other industries; engines and motors for the generation of electricity from regenerative power, namely, from wind power, solar power, water power, biogas or marine currentSECTION 71 - CANCELLED—
011Electric furnaces for industrial purposes; furnaces; heating furnaces for industrial purposes; industrial furnaces; melting furnaces; electrically heated diffusion furnaces for industrial use; electrical induction heating apparatus for heating metal work pieces; electromagnetic induction cookers for industrial purposes; induction ovens, all afore-mentioned furnaces, heating apparatus and heaters also with superconductors or superconductive circuits; power plants, namely, wind energy plants, water power plants, wave generating plants, solar thermal-based power plants, all plants also with superconductive wire; energy generating plants, namely, plants for producing or generating renewable energy, namely, wind energy plants, water power plants, wave generating plants, solar thermal- based power plants; pressure water tanks for use in the treatment and purification of water; hot water tanks; water desalination plants; heating installations; boilers for heating installations; solar thermal air systems for heating purposes; heating systems for residential and commercial buildings comprised of boilers, valves, pipes, manifolds, solar panels, control panel, switches and electrical wire, all sold as a unit; heating systems for residential and commercial buildings comprised of biomass burners, boilers, valves, pipes, manifolds, solar panels, control panels, switches and electrical wire, all sold as a unit; heat pumpsSECTION 71 - CANCELLED—
040Water treating; technical consultation in the field of production of solar energy; assembly of power generation engines for others; consultation in the field of custom fabrication of power generation engines; generation of electricity; generation of energy; generation of power; generation of power through operation of power generation equipment and facilities; waste-to-energy generation services; consulting services in the field of production of wind energy; production of wind energy; environmental remediation services, namely, soil, waste and/or water treatment services; water treatment; production of energySECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
May 29, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
May 29, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 1, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Dec 19, 2018INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Dec 19, 2018INPCINVALIDATION PROCESSED—
Dec 6, 2018INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Apr 6, 2018C71TCANCELLED SECTION 71—
Mar 3, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 29, 2012CHLDCHANGE OF OWNER RECEIVED FROM IB—
Dec 19, 2011CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Dec 17, 2011CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Dec 5, 2011FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 5, 2011FIMPFINAL DISPOSITION PROCESSED—
Nov 30, 2011FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 4, 2011GPNXNOTIFICATION PROCESSED BY IB—
Aug 30, 2011R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 14, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jun 14, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 25, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
May 25, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
May 10, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 9, 2011ALIEASSIGNED TO LIE—
Apr 23, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 18, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Apr 18, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 18, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 18, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Mar 12, 2011RFNPREFUSAL PROCESSED BY IB—
Feb 26, 2011MAFRAPPLICATION FILING RECEIPT MAILED—
Feb 24, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Feb 24, 2011RFRRREFUSAL PROCESSED BY MPU—
Feb 24, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Feb 23, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Feb 22, 2011DOCKASSIGNED TO EXAMINER—
Feb 22, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Feb 18, 2011LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Feb 17, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance