Drawing for E F U T U R E

USPTO serial 79093983

E F U T U R E

Reviewed by CopyMark Law Group

Reg. 4085858Status 404
Filing date
Status date
Registration date
Jan 17, 2012
Examiner
BULLOFF, TOBY ELLEN
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with E F U T U R E?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
007Drilling rigs for oil or gas and other construction machines and apparatus, namely, floating production storage and offloading system (FPSO), floating storage and regasification units (FSRU), and floating storage and offloading system (FSO) for offshore oil or gas producing and storage; well drilling machines for oil or gas and oil-well pumping machines; oil refining machines and other chemical processing machines and apparatusSECTION 70 - CANCELLED
012Vessels, namely, tankers, container ships, bulk cargo ships, ferryboats, roll-on roll-off ships, car carriers, passenger ships, navel ships, patrol ships, floating storage and offloading (FSO) vessel, floating storage and regasification unit (FSRU) vessel, and floating production storage and offloading vessel (FPSO)SECTION 70 - CANCELLED
037Shipbuilding, repair or maintenance of vessels; repair or maintenance of drilling rigs for oil or gas and other construction machines and apparatus; repair or maintenance of well drilling machines for oil or gas and oil-well pumping machines; repair or maintenance of oil refining machines and other chemical processing machines and apparatusSECTION 70 - CANCELLED
042Designing of vessels; provision of drawings for shipbuilding; designing of offshore structures; provision of drawings for offshore structure buildings; devising of design for vessels and offshore structures; technical advice relating to performance, operation of computers, vessels and other machines that require high levels of personal knowledge, skills or experience of the operators to meet the required accuracy in operating themSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 28, 2013DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Nov 17, 2012DETHDEATH OF INTERNATIONAL REGISTRATION
Sep 1, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Aug 15, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB
Aug 15, 2012FIMPFINAL DISPOSITION PROCESSED
Apr 17, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Apr 15, 2012NREPNEW REPRESENTATIVE AT IB RECEIVED
Jan 17, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 1, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 1, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Sep 28, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Sep 23, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 22, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 22, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Sep 21, 2011ALIEASSIGNED TO LIE
Sep 19, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Sep 19, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Apr 23, 2011RFNPREFUSAL PROCESSED BY IB
Apr 7, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 7, 2011RFRRREFUSAL PROCESSED BY MPU
Apr 7, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 6, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2011DOCKASSIGNED TO EXAMINER
Mar 22, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Mar 18, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 17, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance