Drawing for FERMACELL

USPTO serial 79094001

FERMACELL

Reviewed by CopyMark Law Group

Reg. 4184726Status 404
Filing date
Status date
Registration date
Aug 7, 2012
Examiner
FROMM, MARTHA L
Law office
PETITIONS OFFICE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FERMACELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Joseph F. Schmidt

Joseph F. Schmidt Taft Stettinius & Hollister LLP111 E. Wacker Dr., Ste. 2800Chicago, IL 60601UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
001Adhesives used in industry; construction adhesives for use on joints and in the assembly of building panelsSECTION 71 - CANCELLED
006Small items of metal hardware, namely screws and drywall screws; metal air duct pipes and metal elements for use in building air duct pipes, namely, collars and connectorsSECTION 71 - CANCELLED
009Fire resistant electrical cable ductsSECTION 71 - CANCELLED
017Semi-finished plastics in extruded form for use in manufacture; sealing, packing, and insulating material, namely, heat insulation materials made from mineral wool and foamed polystyrene for use in building construction; insulating plaster; insulating wall panels; insulating materials; heat insulation materials; thermal insulation composite systems for building purposes comprised of one or more of insulating plaster, insulating wall panels, insulating materials, heat insulation materials, glass fiber insulation cloth and mesh mats, insulating wall panels made of mineral wool and insulating tape sold as unitSECTION 71 - CANCELLED
019Non-reinforced blocks and reinforced beams and building panels made from aerated concrete, normal concrete, porous concrete, foam concrete or calcareous sandstone; cement mixes; gypsum; sand; lightweight concrete; coating products for plastering building surfaces, namely, plaster, plaster stops for reinforcing plaster in the corners of plastered walls; adhesive plaster, interior plaster, exterior plaster, repair plaster, normal plaster and thin plaster, the aforesaid products mainly with a lime, cement or gypsum base, with or without plastic admixtures; dry mortar, normal mortar, thin-bed mortar, levelling mortar, facing mortar, dry concrete; non-metal floor screeds for use in marking concrete and plaster levels; prefabricated, non-metal wall panels and plaster boards for the erecting of buildings, walls and ceilings; prefabricated, non-metal panels made of concrete, calcareous sandstone or plaster fiberboard; non-metal lintels; non-metal U-shaped beam and column encasements used for dry-lining; facing stones; bottom leveling plaster for floors of gas concrete; plaster fiberboards, in particular for the construction of interiors; plasterboard and gypsum boards; ceiling panels made of plasterboard and gypsum boards; mobile wall partitions, in particular of plaster fiberboards; non-metal ceiling elements, namely, panels for roofs and ceilings; mobile partitions made of plastic fiberboards; non-metal fire protection and fire proof boards, namely, fire-resistant boards and panels for construction; non-metal tunnel lining panels; non-metal air duct tubes and related components, namely, non-metal air duct jointsSECTION 71 - CANCELLED
037Building construction; factory construction; repair work for the restoration of buildings as well as restoration of machines for manufacturing building materials and construction machines; rental of construction machines; construction managementSECTION 71 - CANCELLED
042Engineering services, in particular services of a construction engineer and/or structural engineer; testing of materials for others; construction planning of standard houses; civil engineeringSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 7, 2020DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Nov 7, 2020DETHDEATH OF INTERNATIONAL REGISTRATION
Dec 27, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB
Nov 29, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Nov 29, 2019INPCINVALIDATION PROCESSED
Nov 8, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Sep 5, 2019ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Mar 8, 2019C71TCANCELLED SECTION 71
Feb 5, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 5, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Aug 7, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Oct 31, 2014CORVREVIEW OF CORRESPONDENCE COMPLETE
Oct 21, 2014ERTITEAS RESPONSE TO PETITION INQUIRY LETTER
Oct 1, 2014PILMPETITION INQUIRY LETTER ISSUED
Sep 29, 2014APETASSIGNED TO PETITION STAFF
Sep 24, 2014RCIIREQUEST TO CANCEL INADVERTENTLY ISSUED REGISTRATION RECEIVED
May 21, 2014CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Feb 17, 2014CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Dec 23, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 16, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Mar 26, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB
Mar 26, 2013FIMPFINAL DISPOSITION PROCESSED
Nov 7, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Aug 7, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 24, 2012ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
May 22, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 22, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 2, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Apr 18, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 17, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Apr 17, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 16, 2012EXPIEX PARTE APPEAL-INSTITUTED
Apr 16, 2012JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY
Apr 16, 2012EXAFEXPARTE APPEAL RECEIVED AT TTAB
Apr 15, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 15, 2012ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Nov 1, 2011GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Nov 1, 2011GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 1, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Oct 14, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 14, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 4, 2011ALIEASSIGNED TO LIE
Sep 29, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 25, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Sep 25, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Aug 16, 2011ATRVATTORNEY REVIEW COMPLETED
Aug 2, 2011CORRCORRECTION FROM IB ENTERED - NO REVIEW REQUIRED
Jul 3, 2011RINXUSPTO CORRECTION PROCESSED BY IB
Jul 3, 2011CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Apr 17, 2011RFNTREFUSAL PROCESSED BY IB
Mar 31, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Mar 31, 2011RFRRREFUSAL PROCESSED BY MPU
Mar 31, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Mar 30, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Mar 26, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Mar 22, 2011DOCKASSIGNED TO EXAMINER
Mar 22, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 17, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance