Drawing for ENEWELL

USPTO serial 79094305

ENEWELL

Reviewed by CopyMark Law Group

Reg. 4097654Status 709
Filing date
Status date
Registration date
Feb 14, 2012
Examiner
BLOHM, LINDA
Law office
TMO LAW OFFICE 110

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ENEWELL?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Mainak H. Mehta

Mainak H. Mehta Procopio, Cory, Hargreaves & Savitch LLP525 B. Street, Suite 2200San Diego, CA 92101UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007[ Non-electric prime movers, not for land vehicles, namely, engines other than for land vehicles, water mills and wind mills; parts for non-electric prime movers for land vehicles, namely, mechanical engine parts for land vehicles; water mills; wind mills; pneumatic or hydraulic machines and instruments, namely, pumps, vacuum pumps, blowers, compressors; starters for motors and engines; electric AC motors and DC motors other than for land vehicles; alternators; DC generators; hydraulic power generating unit; solar-powered electricity generators; wind-powered electricity generators ]SECTION 7(e) - CANCELLED
009Measuring or testing devices and instruments, namely, instruments for measuring length, distance measuring apparatus, brake fluid testers, position detectors, encoders, speed indicators, accelerometers, anemeters, anemoscepes, water flow indicators, water gauge meters, pressure gauge, temperature indicators, voltmeters, ammeters, power measurement apparatus; power distribution or control devices and apparatus, namely, electric switches, circuit breakers, power controllers, motor control apparatus, namely, inverters, cycloconverters, drive control apparatus, namely, programmable logic controllers (PLC), single board controllers, power generation control apparatus, namely, inverters with regeneration converters, cycloconverters, power conversion devices, power converters, power inverters; rotary converters; phase modifiers; batteries and cells; electronic machines, apparatus and their parts, namely, computer hardware, calculating machines, electronic control systems for machines, computer operating programs, computer peripheral devices, circuits, interfaces for computersSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 18, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB
May 25, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
May 25, 2023INPCINVALIDATION PROCESSED
Apr 26, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Jan 13, 2023NREPNEW REPRESENTATIVE AT IB RECEIVED
Aug 26, 2022C71TCANCELLED SECTION 71
Mar 30, 2021LIMELIMITATION FROM THE IB EXAMINED AND ENTERED
Mar 30, 2021COC.CORRECTION UNDER SECTION 7 - PROCESSED
Feb 18, 2021RNWLINTERNATIONAL REGISTRATION RENEWED
Feb 14, 2021REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jan 3, 2021LIMGLIMITATION OF GOODS RECEIVED FROM IB
Feb 12, 2018NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED
Feb 12, 2018C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.
Jan 24, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Dec 25, 2017ES75TEAS SECTION 71 & 15 RECEIVED
Feb 14, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Aug 10, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 25, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB
Jul 25, 2012FIMPFINAL DISPOSITION PROCESSED
Jul 6, 2012GPNXNOTIFICATION PROCESSED BY IB
May 14, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Feb 14, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Nov 29, 2011NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Nov 29, 2011PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 23, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Nov 23, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Nov 22, 2011LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Nov 9, 2011NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 5, 2011LIMGLIMITATION OF GOODS RECEIVED FROM IB
Oct 27, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Oct 24, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 20, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Oct 20, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 13, 2011ALIEASSIGNED TO LIE
Oct 12, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 11, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Oct 11, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
May 7, 2011RFNTREFUSAL PROCESSED BY IB
Apr 20, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 20, 2011RFRRREFUSAL PROCESSED BY MPU
Apr 20, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 19, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 18, 2011DOCKASSIGNED TO EXAMINER
Mar 29, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Mar 25, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 24, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance