Drawing for ECOSPECIFIER GLOBAL GREEN TAG CERTIFIED

USPTO serial 79094367

ECOSPECIFIER GLOBAL GREEN TAG CERTIFIED

Reviewed by CopyMark Law Group

Reg. 4307149Status 404
Filing date
Status date
Registration date
Mar 26, 2013
Examiner
MIZELLE HOWARD, DEZMONA JULYE
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with ECOSPECIFIER GLOBAL GREEN TAG CERTIFIED?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
002Paints; varnishes; lacquers and coating compositions used in building construction and manufacture, paints and oils for preserving concrete; paints for preserving metal; wood preservativesSECTION 71 - CANCELLED
003Cleaning preparations used in building construction and manufacture; polishing preparations used in building construction and manufacture, scouring preparations used in building construction and manufacture; abrasive preparations used in building construction and manufactureSECTION 71 - CANCELLED
006Common metal alloys; common metals; metal building materials; transportable buildings of metal; non-electric metal cables; non-electric metal wires; ironmongery; metal hardware; metal pipes; metal tubes; cash safes; metal safety boxes; safes; strong boxesSECTION 71 - CANCELLED
009Scientific equipment used in building construction and manufacture; apparatus for weighing used in building construction and manufacture; apparatus for measuring used in building construction and manufacture; signaling equipment used in building construction and manufacture; computer hardware and software for data processing used in building construction and manufactureSECTION 71 - CANCELLED
011Apparatus for lighting; apparatus for heating; steam generators; apparatus for cooking; apparatus for refrigerating; drying apparatus; apparatus for ventilating; apparatus for water supply; apparatus for sanitary purposesSECTION 71 - CANCELLED
017Plastics for use in manufacture; goods made from rubber, gutta-percha, gum, asbestos and mica used in building construction and manufactureSECTION 71 - CANCELLED
019Non-metal building materialsSECTION 71 - CANCELLED
020FurnitureSECTION 71 - CANCELLED
022Nets; awnings; canopies; fabric roofed structures; temporary structures made of fabrics; sails; industrial storage containers in the nature of bags and sacks for bulk material; padding materials made of fibrous material; stuffing used in building construction and manufacture; raw fibrous textile used in building construction and manufactureSECTION 71 - CANCELLED
024Textile material used in building construction and manufacture; textilesSECTION 71 - CANCELLED
027Carpets; rugs; mats; linoleum; and floor coveringsSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 14, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Aug 14, 2021DETHDEATH OF INTERNATIONAL REGISTRATION
Sep 12, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB
Aug 12, 2020INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Aug 12, 2020INPCINVALIDATION PROCESSED
Jul 1, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Nov 1, 2019C71TCANCELLED SECTION 71
May 3, 2019TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Dec 17, 2018TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
Mar 26, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Jul 14, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jun 27, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB
Jun 27, 2013FIMPFINAL DISPOSITION PROCESSED
Jun 26, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 26, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 8, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Jan 8, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 19, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 19, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Dec 19, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Dec 5, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Dec 5, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Dec 5, 2012XAECEXAMINER'S AMENDMENT ENTERED
Dec 5, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Dec 5, 2012GNEAEXAMINERS AMENDMENT E-MAILED
Dec 5, 2012CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 28, 2012ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Nov 25, 2012PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Nov 13, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 13, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 13, 2012XAECEXAMINER'S AMENDMENT ENTERED
Nov 12, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Nov 12, 2012GNEAEXAMINERS AMENDMENT E-MAILED
Nov 12, 2012CNEAEXAMINERS AMENDMENT -WRITTEN
Nov 8, 2012ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Nov 8, 2012PBSRWITHDRAWN FROM PUB - SENIOR ATTORNEY REQUEST
Oct 30, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Oct 30, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Oct 26, 2012FAXXFAX RECEIVED
Oct 26, 2012DMCCDATA MODIFICATION COMPLETED
Oct 22, 2012GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED
Oct 22, 2012GECDACTION DENYING REQ FOR RECON E-MAILED
Oct 22, 2012CNCFACTION CONTINUING FINAL - COMPLETED
Sep 15, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Aug 29, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Aug 29, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Aug 27, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Aug 27, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 27, 2012ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
May 13, 2012RDX3NOTIFICATION FOR REQ FOR RECON DENIED NO APPEAL FILED
May 13, 2012RDX1ACTION FOR REQ FOR RECON DENIED NO APPEAL FILED E-MAILED
May 13, 2012RRDXACTION REQ FOR RECON DENIED NO APPEAL FILED COUNTED NOT MAILED
Apr 20, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Apr 20, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Apr 20, 2012ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED
Feb 27, 2012GNFNNOTIFICATION OF FINAL REFUSAL EMAILED
Feb 27, 2012GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 27, 2012CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Feb 3, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 3, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 27, 2012ALIEASSIGNED TO LIE
Jan 19, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jan 19, 2012PETGPETITION TO REVIVE-GRANTED
Jan 19, 2012PROATEAS PETITION TO REVIVE RECEIVED
Nov 29, 2011MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 28, 2011ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Nov 9, 2011TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED
May 13, 2011RFNTREFUSAL PROCESSED BY IB
Apr 28, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 28, 2011RFRRREFUSAL PROCESSED BY MPU
Apr 28, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 27, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 25, 2011DOCKASSIGNED TO EXAMINER
Mar 29, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Mar 25, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Mar 24, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance