USPTO serial 79094806
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John J. O'Malley
John J. O'Malley Volpe and Koenig, PC30 S. 17th StreetPhiladelphia, PA 19103-4009UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials of metal, namely, steel, namely, shores, supports, braces, metal bars for construction, beams, joists, building wall framings composed primarily of metal, metal roof trusses, composite panels composed primarily of metal, ceiling boards and floor boards; steel scaffolding; steel ladders; steel lifting rings; steel lifting chains; portable steel buildings; non-electric cables and wires of metal, namely, steel; steel ironmongery in the nature of small items of metal hardware, namely, nuts, washers, screws, bolts, hooks and nails; steel pipes and tubes; steel prefabricated construction elements, namely, boxes of common metal, metal tiles, metallic refractory blocks, metallic swage blocks, metallic chain block used for lifting and rigging, metal bars used on construction, metal rods, metal strips used on construction, metal frameworks for building, metal roof trusses, reservoirs of metal, metal sheets, metal gratings, metal plates, metal tiles; steel structures for the mechanical stabilization of soil, namely, prefabricated metal components for building foundations, metal wall panels, metal wall panels for forming the facing of mechanically stabilized or stabilizing earth structures, metal wall panels for forming the facing of stabilizing earth structures by mechanical effect, pre-shaped metal casting forms for concrete; steel soil retention structures, namely, prefabricated metal components for building foundations, metal wall panels, metal wall panels for forming the facing of mechanically stabilized or stabilizing earth structures, metal wall panels for forming the facing of stabilizing earth structures by mechanical effect, pre-shaped metal casting forms for concrete; steel retaining walls; steel reinforcements for building civil engineering structures; steel building panels in the nature of floor, ceiling, wall and door panels; metallic steel panels in the nature of metal roofing panels, steel ceiling panels, steel metal wall panels and door panels for forming a cover for mechanically-stabilized land structures; metallic steel panels in the nature of metal roofing panels, metal ceiling panels, metal wall panels and metal door panels for forming a cover for structures for the mechanical stabilization of soil | SECTION 71 - CANCELLED | — |
| 007 | Mechanical lifts, pneumatic lifts, hydraulic lifts; power operated elevating or lifting work platforms, including mobile; lifting installations for the transport of goods; cranes; fixed cranes; mobile cranes; fast-erected tower cranes; pulleys being part of machines; mechanical, pneumatic and hydraulic hoisting gears; soil excavation machines, especially for digging trenches or building walls in the soil | SECTION 71 - CANCELLED | — |
| 009 | Electronic machines for measuring the tensile strength of prestressed or reinforced concrete, as well as for measuring the tensile strength of mobile or stationary steel wires, cables and strands | SECTION 71 - CANCELLED | — |
| 037 | Building construction; erection of scaffolding; construction of scaffolding, supporting walls, retaining walls, mechanical lifts, pneumatic lifts, hydraulic lifts, power operated jacks, elevating or lifting work platforms including mobile, lifting installations for the transport of goods; restoration of works of art and works of civil engineering, excavations services, drilling of pilots, wells, trenches, walls or tunnels for reinforcing the soil; construction, repair, maintenance, and demolition of buildings; construction, maintenance and repair of roads, ways railroads, tracks runways, bridges, bridge abutments, berms, embankments, supporting walls, retaining walls, dams, soil stabilization devices, retaining walls, dikes, tunnels, gutters, shelters, protection bunkers, tanks, reservoirs, silos and historic monuments; earthworks construction; land clearing; underwater dredging; construction supervision; rental of construction equipment; rental of scaffolding equipment; rental of construction equipment namely, lifts, jacks, construction site lifts, goods lifts, cranes, fixed cranes, mobile cranes, fast-erected tower cranes, pulleys and hoisting gears; erection of roofs, works of art and works of civil engineering; building and scaffolding construction information; information on the repair of buildings, works of civil engineering, railroads, runways, bridges, bridge abutments, berms, embankments, supporting walls, retaining walls, dams, soil stabilization devices, filling material, retaining walls, dikes, tunnels, gutters, shelters, protection bunkers, tanks, reservoirs, silos, historical monuments, scaffolding, lifts, jacks, construction site lifts, goods lifts, cranes, fixed cranes, mobile cranes, fast-erected tower cranes, pulleys, hoisting gears | SECTION 71 - CANCELLED | — |
| 042 | Construction engineering services; consultation in the field of engineering, namely, in relation with cabled structures, building construction and prestressing; consultation in the field of engineering, namely, in relation with building and civil engineering structures; civil and industrial engineering consulting in relation to soil stabilization; engineering services and consultation for the use of seals and fire protection preparations used in civil constructions; engineering services and consultation for the detection of contaminants in the soil; consultation in the field of engineering, namely, in relation with the use of the following goods: metal building materials, metal scaffolding, metal ladders, metal lifting rings, metal lifting chains, transportable metal constructions, non-electric cables and wires of metal, ironmongery, small items of metal hardware, metal pipes and tubes, shores, supports, braces, metal bars for construction, beams, joists, building wall framings composed primarily of metal, metal roof trusses, composite panels composed primarily of metal, ceiling boards and floor boards; prefabricated metal construction elements, metal structures for the mechanical stabilization of soil, metal soil retention structures, metal retaining walls, metal reinforcements for building civil engineering structures, metal building panels, metal panels for forming a cover for mechanically-stabilized land structures, metal panels for forming a cover for structures for the mechanical stabilization of soil; consulting in the field of engineering regarding the use of mechanical lifts, pneumatic lifts, hydraulic lifts, power operated jacks, elevating or lifting work platforms including mobile, lifting installations for the transport of goods, cranes, fixed cranes, mobile cranes, fast-erected tower cranes, pulleys being part of machines, mechanical, pneumatic and hydraulic hoisting gears, hydraulic and electromagnetically powered machines used in prestressed bar tensile testing, machines for measuring the tensile strength of prestressed or reinforced concrete as well as for measuring the tensile strength of steel wires, cables and strands or similar, soil excavation machines, especially for digging trenches or building walls in the soil; design and development of computer software | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Apr 17, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Apr 17, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 5, 2020 | IRIV | IRREGULARITY ON INVALIDATION RECEIVED FROM IB | — |
| Sep 24, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 24, 2020 | INPC | INVALIDATION PROCESSED | — |
| Aug 27, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 27, 2019 | C71T | CANCELLED SECTION 71 | — |
| Dec 12, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 8, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 13, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 21, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 22, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 30, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 30, 2013 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Aug 30, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 21, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 6, 2013 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 21, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 8, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 5, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 5, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 13, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 13, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 13, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 25, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 24, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 24, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 24, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 24, 2013 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 29, 2012 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Sep 12, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 12, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Jul 28, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 28, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 27, 2012 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jul 23, 2012 | PBCR | WITHDRAWN FROM PUB - OG REVIEW QUERY | — |
| Jul 7, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jul 5, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 12, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 12, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 12, 2012 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Jan 3, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Jan 3, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jan 3, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 23, 2011 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Nov 29, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 29, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 29, 2011 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Nov 17, 2011 | ALIE | ASSIGNED TO LIE | — |
| Nov 4, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 2, 2011 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 2, 2011 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 28, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 6, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 6, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 6, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 5, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 12, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 11, 2011 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Apr 10, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 9, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 8, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 8, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 7, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |