Drawing for IHC MERWEDE

USPTO serial 79095375

IHC MERWEDE

Reviewed by CopyMark Law Group

Reg. 4116752Status 404
Filing date
Status date
Registration date
Mar 27, 2012
Examiner
SHARMA, NAPOLEON
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with IHC MERWEDE?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Todd A. Denys

Todd A. Denys Porzio, Bromberg & Newman, P.C.29 Thanet Road, Suite 201PRINCETON, NJ 08540-3674UNITED STATES

Goods and services

ClassDescriptionStatusFirst use
007MACHINE TOOLS AND STRUCTURAL PARTS THEREFOR FOR DREDGING WORKS, MINING WORKS AND OFFSHORE WORKS AND FOR WET AND DRY SOIL TREATMENT AND WET OR NOT WET SOIL MOVEMENT, NAMELY, CUTTING, PILE DRIVING AND DRILLING MACHINES, HYDRAULIC HAMMERS, DRILLING UNITS, HYDRAULIC ROCK BREAKERS AND PILE SLEEVES; MACHINES, NAMELY, BOOSTER PUMP STATIONS; REMOTELY OPERATED MACHINES FOR UNDERWATER MINING AND DREDGING; TREATMENT PLANTS FOR THE MINING INDUSTRY, NAMELY, SOIL TREATMENT PLANTS; HYDRAULIC POWER PACKS BEING MACHINES; MACHINES FOR VERTICAL TRANSPORT BEING HOISTING APPARATUS AS PARTS OF DREDGING AND MINING MACHINES; LIFT SYSTEMS FOR DREDGING, MINING AND OFFSHORE OPERATIONS, NAMELY, MACHINES FOR THE LAUNCHING AND LIFTING OF RISERS AND REMOTELY OPERATED MACHINES, SEABED LEVELING EQUIPMENT BEING MACHINES FOR LEVELING SEABEDS; MACHINE PARTS, NAMELY, CUTTER HEADS, DREDGING WHEELS, DRAG HEADS, WINCHES, MACHINE PARTS BEING SWELL COMPENSATORS, GEARBOXES, OTHER THAN FOR LAND VEHICLES, SUCTION PIPES, BOW COUPLINGS AND BARGE LOAD PIPES MACHINE PARTS FOR MACHINES; GANTRIES BEING GANTRY CRANES; MACHINE PARTS, NAMELY, SPUD CARRIERS; SPUD TILTING AND LIFTING MACHINES; MACHINES, NAMELY, CENTRIFUGAL PUMPS, SUBMARINE PLOUGHS, TRENCHERS FOR DIGGING TRENCHES; MACHINE PARTS, NAMELY, PILE CLAMPS FOR PILE HANDLING EQUIPMENT, PIPE CLAMPS FOR PIPE HANDLING EQUIPMENT, PIPE CAROUSELS AND PIPE LIFTING FRAMES; JIGS, NAMELY, GRAVITY SEPARATORS AND GRAVITY CONCENTRATORS; MACHINE COMPONENTS FOR DREDGING WORKS, MINING WORKS AND OFFSHORE WORKS AND FOR MACHINES FOR WET AND NOT WET SOIL TREATMENT WORKS AND WET AND NOT WET SOIL MOVEMENT, NAMELY, HYDRAULIC CYLINDERS, PUMPS, VALVES, POWER PACKS, HYDRAULIC PUMPS AND HYDRAULIC VALVES, HYDRAULIC MANIFOLDS BEING PARTS OF MACHINES AND BEING PIPINGS AS PART OF HYDRAULIC MACHINES; PARTS OF MACHINES, NAMELY, BEARINGS BEING MACHINE PARTS AND SEALING PARTS OF MACHINES, NAMELY, TURNING GLANDS, VALVES, DREDGE VALVES, LOADING BOXES, DREDGING BUCKETS, OVERFLOW PIPES, BOTTOM DOORS, GRABS, BASKETS FOR CAROUSEL EQUIPMENT, LEVEL WINDERS FOR CAROUSEL EQUIPMENT, LEVEL WIND COMPENSATORS FOR CAROUSEL EQUIPMENT, BENDERS FOR CAROUSEL EQUIPMENT, ALIGNER CHUTES FOR CAROUSEL EQUIPMENT, RUNNING TRAYS FOR CAROUSEL EQUIPMENT, SIEVES FOR SOIL TREATMENT PLANTS, FEED BOXES FOR SOIL TREATMENT PLANTS, HYDRO CYCLONES FOR SOIL TREATMENT PLANTS, TEETH FOR CUTTING SOIL AND ROCK, ADAPTERS FOR TEETH AND SUCTION MOUTHSSECTION 71 - CANCELLED
012WATER VESSELS FOR DREDGE AND SOIL TRANSPORTS, NAMELY, CUTTER SUCTION DREDGERS, BUCKET WHEEL DREDGERS, PLAIN SUCTION DREDGERS, BUCKET LADDER DREDGERS, GRAB DREDGERS, BARGE UNLOADING DREDGERS, TRAILING SUCTION HOPPER DREDGERS, AMPHIBIAN VESSELS, BACKHOE DREDGERS, DEEP SEA DREDGING AND MINING VESSELS AND DREDGE MATERIAL DELIVERY VESSELS; UNLOADING, LOADING AND TRANSPORT MACHINES ALL SOLD COMPONENTS OF BARGES AND SPRAY PONTOONS AND ALL PARTS OF VESSELS SOLD AS SINGLE UNITS; TUG BOATS; DREDGING SUPPORT VESSELS, NAMELY, WORK BOATS; VESSELS USED FOR OFF-SHORE ACTIVITIES EITHER WITH AND WITHOUT THEIR OWN PROPULSION, NAMELY, DRILLING SHIPS, OFFSHORE SUPPLY VESSELS, WELL INTERVENTION AND ENHANCEMENT VESSELS, DIVE SUPPORT VESSELS, DEEP SEA DREDGING AND MINING SUPPORT VESSELS, OFFSHORE WIND MILL PLACEMENT AND MAINTENANCE VESSELS, PIPE LAYING VESSELS, JACK-UP PLATFORM VESSELS, OFFSHORE CONSTRUCTION VESSELS AND WIND MILL INSTALLATION VESSELS; OFFSHORE SUPPORT VESSELS, NAMELY, WORK BOATS, OFFSHORE SUPPLY VESSELS, RESEARCH VESSELS, CABLE LAY VESSELS, JACK-UP VESSELS IN THE NATURE OF LIFTING PLATFORMS ON WATER AND CRANE VESSELS, SUPPORT BARGES, HEAVY LIFT VESSELS; SPECIAL VESSELS, NAMELY, FERRIES AND CRUISE VESSELS AND INLAND CRUISE VESSELS AND NAVAL VESSELS AND NAVAL AUXILIARY VESSELSSECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 18, 2022UNDNUNDELIVERABLE MAIL - NO ACTION TAKEN
Nov 22, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED
Nov 22, 2021DETHDEATH OF INTERNATIONAL REGISTRATION
Nov 30, 2019INNTTOTAL INVALIDATION PROCESSED BY THE IB
Aug 3, 2019INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Aug 2, 2019INPCINVALIDATION PROCESSED
Jul 2, 2019INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Nov 2, 2018C71TCANCELLED SECTION 71
May 15, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED
Jun 5, 2014NREPNEW REPRESENTATIVE AT IB RECEIVED
Nov 24, 2012FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Nov 6, 2012FICSFINAL DISPOSITION NOTICE SENT TO IB
Nov 6, 2012FIMPFINAL DISPOSITION PROCESSED
Oct 31, 2012GPNXNOTIFICATION PROCESSED BY IB
Jun 27, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Mar 27, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jan 10, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 21, 2011OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 21, 2011OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Dec 21, 2011NPUBNOTICE OF PUBLICATION
Dec 2, 2011PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Nov 24, 2011CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Nov 2, 2011ACECAMENDMENT FROM APPLICANT ENTERED
Nov 2, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Oct 20, 2011ALIEASSIGNED TO LIE
Oct 12, 2011MAILPAPER RECEIVED
May 13, 2011RFNTREFUSAL PROCESSED BY IB
Apr 26, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Apr 26, 2011RFRRREFUSAL PROCESSED BY MPU
Apr 26, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Apr 25, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 22, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Apr 18, 2011DOCKASSIGNED TO EXAMINER
Apr 18, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Apr 15, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance