USPTO serial 79095375
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Todd A. Denys
Todd A. Denys Porzio, Bromberg & Newman, P.C.29 Thanet Road, Suite 201PRINCETON, NJ 08540-3674UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | MACHINE TOOLS AND STRUCTURAL PARTS THEREFOR FOR DREDGING WORKS, MINING WORKS AND OFFSHORE WORKS AND FOR WET AND DRY SOIL TREATMENT AND WET OR NOT WET SOIL MOVEMENT, NAMELY, CUTTING, PILE DRIVING AND DRILLING MACHINES, HYDRAULIC HAMMERS, DRILLING UNITS, HYDRAULIC ROCK BREAKERS AND PILE SLEEVES; MACHINES, NAMELY, BOOSTER PUMP STATIONS; REMOTELY OPERATED MACHINES FOR UNDERWATER MINING AND DREDGING; TREATMENT PLANTS FOR THE MINING INDUSTRY, NAMELY, SOIL TREATMENT PLANTS; HYDRAULIC POWER PACKS BEING MACHINES; MACHINES FOR VERTICAL TRANSPORT BEING HOISTING APPARATUS AS PARTS OF DREDGING AND MINING MACHINES; LIFT SYSTEMS FOR DREDGING, MINING AND OFFSHORE OPERATIONS, NAMELY, MACHINES FOR THE LAUNCHING AND LIFTING OF RISERS AND REMOTELY OPERATED MACHINES, SEABED LEVELING EQUIPMENT BEING MACHINES FOR LEVELING SEABEDS; MACHINE PARTS, NAMELY, CUTTER HEADS, DREDGING WHEELS, DRAG HEADS, WINCHES, MACHINE PARTS BEING SWELL COMPENSATORS, GEARBOXES, OTHER THAN FOR LAND VEHICLES, SUCTION PIPES, BOW COUPLINGS AND BARGE LOAD PIPES MACHINE PARTS FOR MACHINES; GANTRIES BEING GANTRY CRANES; MACHINE PARTS, NAMELY, SPUD CARRIERS; SPUD TILTING AND LIFTING MACHINES; MACHINES, NAMELY, CENTRIFUGAL PUMPS, SUBMARINE PLOUGHS, TRENCHERS FOR DIGGING TRENCHES; MACHINE PARTS, NAMELY, PILE CLAMPS FOR PILE HANDLING EQUIPMENT, PIPE CLAMPS FOR PIPE HANDLING EQUIPMENT, PIPE CAROUSELS AND PIPE LIFTING FRAMES; JIGS, NAMELY, GRAVITY SEPARATORS AND GRAVITY CONCENTRATORS; MACHINE COMPONENTS FOR DREDGING WORKS, MINING WORKS AND OFFSHORE WORKS AND FOR MACHINES FOR WET AND NOT WET SOIL TREATMENT WORKS AND WET AND NOT WET SOIL MOVEMENT, NAMELY, HYDRAULIC CYLINDERS, PUMPS, VALVES, POWER PACKS, HYDRAULIC PUMPS AND HYDRAULIC VALVES, HYDRAULIC MANIFOLDS BEING PARTS OF MACHINES AND BEING PIPINGS AS PART OF HYDRAULIC MACHINES; PARTS OF MACHINES, NAMELY, BEARINGS BEING MACHINE PARTS AND SEALING PARTS OF MACHINES, NAMELY, TURNING GLANDS, VALVES, DREDGE VALVES, LOADING BOXES, DREDGING BUCKETS, OVERFLOW PIPES, BOTTOM DOORS, GRABS, BASKETS FOR CAROUSEL EQUIPMENT, LEVEL WINDERS FOR CAROUSEL EQUIPMENT, LEVEL WIND COMPENSATORS FOR CAROUSEL EQUIPMENT, BENDERS FOR CAROUSEL EQUIPMENT, ALIGNER CHUTES FOR CAROUSEL EQUIPMENT, RUNNING TRAYS FOR CAROUSEL EQUIPMENT, SIEVES FOR SOIL TREATMENT PLANTS, FEED BOXES FOR SOIL TREATMENT PLANTS, HYDRO CYCLONES FOR SOIL TREATMENT PLANTS, TEETH FOR CUTTING SOIL AND ROCK, ADAPTERS FOR TEETH AND SUCTION MOUTHS | SECTION 71 - CANCELLED | — |
| 012 | WATER VESSELS FOR DREDGE AND SOIL TRANSPORTS, NAMELY, CUTTER SUCTION DREDGERS, BUCKET WHEEL DREDGERS, PLAIN SUCTION DREDGERS, BUCKET LADDER DREDGERS, GRAB DREDGERS, BARGE UNLOADING DREDGERS, TRAILING SUCTION HOPPER DREDGERS, AMPHIBIAN VESSELS, BACKHOE DREDGERS, DEEP SEA DREDGING AND MINING VESSELS AND DREDGE MATERIAL DELIVERY VESSELS; UNLOADING, LOADING AND TRANSPORT MACHINES ALL SOLD COMPONENTS OF BARGES AND SPRAY PONTOONS AND ALL PARTS OF VESSELS SOLD AS SINGLE UNITS; TUG BOATS; DREDGING SUPPORT VESSELS, NAMELY, WORK BOATS; VESSELS USED FOR OFF-SHORE ACTIVITIES EITHER WITH AND WITHOUT THEIR OWN PROPULSION, NAMELY, DRILLING SHIPS, OFFSHORE SUPPLY VESSELS, WELL INTERVENTION AND ENHANCEMENT VESSELS, DIVE SUPPORT VESSELS, DEEP SEA DREDGING AND MINING SUPPORT VESSELS, OFFSHORE WIND MILL PLACEMENT AND MAINTENANCE VESSELS, PIPE LAYING VESSELS, JACK-UP PLATFORM VESSELS, OFFSHORE CONSTRUCTION VESSELS AND WIND MILL INSTALLATION VESSELS; OFFSHORE SUPPORT VESSELS, NAMELY, WORK BOATS, OFFSHORE SUPPLY VESSELS, RESEARCH VESSELS, CABLE LAY VESSELS, JACK-UP VESSELS IN THE NATURE OF LIFTING PLATFORMS ON WATER AND CRANE VESSELS, SUPPORT BARGES, HEAVY LIFT VESSELS; SPECIAL VESSELS, NAMELY, FERRIES AND CRUISE VESSELS AND INLAND CRUISE VESSELS AND NAVAL VESSELS AND NAVAL AUXILIARY VESSELS | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 18, 2022 | UNDN | UNDELIVERABLE MAIL - NO ACTION TAKEN | — |
| Nov 22, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Nov 22, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 30, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 3, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 2, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jul 2, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 2, 2018 | C71T | CANCELLED SECTION 71 | — |
| May 15, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 5, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Nov 24, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 6, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 6, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 31, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 27, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 27, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 10, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 21, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 21, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 21, 2011 | NPUB | NOTICE OF PUBLICATION | — |
| Dec 2, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 24, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 2, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Nov 2, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 20, 2011 | ALIE | ASSIGNED TO LIE | — |
| Oct 12, 2011 | PAPER RECEIVED | — | |
| May 13, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 26, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 26, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 26, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 25, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 22, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 18, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 18, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 15, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |