USPTO serial 79095492
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jonathan Myers
Jonathan Myers LUCAS & MERCANTI, LLP30 Broad Street21st FloorNew York, NY 10004| Class | Description | Status | First use |
|---|---|---|---|
| 009 | ELECTRIC AND ELECTRONIC FITTINGS FOR SUPPLYING, DISTRIBUTING, CONTROLLING AND REGULATING WATERS, NAMELY, WATER HEATER CONTROLS, WATER LEVEL INDICATORS, WATER METERS, THERMOSTATS WITH AND WITHOUT REGULATORS, FITTINGS WITH MOTION DETECTORS AND INFRARED SENSORS, WATER FILTER CONTROLLERS; ELECTRONIC SPRAYERS FOR DISSEMINATING PERFUMES AND DISINFECTANTS | SECTION 71 - CANCELLED | — |
| 011 | ELECTRIC AND ELECTRONIC FITTINGS FOR SUPPLYING, DISTRIBUTING, CONTROLLING AND REGULATING WATER, NAMELY, CONTROL VALVES, COUPLERS, BIBBS, FAUCETS, TAPS, TETHERED, MECHANICAL, ELECTRICAL AND ELECTRONIC STOPPERS FOR SINKS AND DRAINS SOLD AS A PART OF PLUMBING DRAINS, SHOWER MIXERS AND TAP MIXERS FOR REGULATING FLOW, DISTRIBUTION, AND TEMPERATURE OF WATER, SHOWER HEADS, SETS COMPRISING SHOWER HEADS AND SHOWER RISER RAILS AND PARTS AND FIXTURES THEREFOR, SETS COMPRISING HANDHELD SHOWER HEADS AND PARTS AND FIXTURES THEREFOR, SHOWER CONTROL VALVES, THERMOSTATIC VALVES; APPARATUS FOR LIGHTING, HEATING, STEAM GENERATING, COOKING, REFRIGERATING, DRYING, VENTILATING, WATER SUPPLY AND SANITARY PURPOSES, NAMELY, DRAINS, FAUCETS, FAUCET FILTERS, SPOUTS, SINK STRAINERS, TRAPS, TAPS, TETHERED, MECHANICAL, ELECTRICAL AND ELECTRONIC STOPPERS FOR SINKS AND DRAINS SOLD AS A PART OF PLUMBING DRAINS, MIXER FAUCETS FOR WATER PIPES FOR REGULATING FLOW, DISTRIBUTION, AND TEMPERATURE OF WATER, SHOWER HEAD SETS COMPRISING SHOWER HEADS AND PARTS AND FIXTURES THEREFOR, SHOWER CONTROL VALVES, THERMOSTATIC VALVES; METAL AND PLASTIC PLUMBING FITTINGS FOR TOILETS, BATHROOMS AND KITCHENS FOR SUPPLYING, DISTRIBUTING, CONTROLLING AND REGULATING WATER, INCLUDING FOR REGULATING WATER TEMPERATURE, NAMELY, CONTROL VALVES, COUPLERS, BIBBS, FAUCETS, TAPS, TETHERED, MECHANICAL, ELECTRICAL AND ELECTRONIC STOPPERS FOR SINKS AND DRAINS SOLD AS A PART OF PLUMBING DRAINS, SHOWER MIXERS AND TAP MIXERS FOR REGULATING FLOW, DISTRIBUTION, AND TEMPERATURE OF WATER, SHOWER HEADS, SETS COMPRISING SHOWER HEADS AND SHOWER RISER RAILS AND PARTS AND FIXTURES THEREFOR, SETS COMPRISING HANDHELD SHOWER HEADS AND PARTS AND FIXTURES THEREFOR, SHOWER CONTROL VALVES, THERMOSTATIC VALVES; TANKLESS WATER HEATERS; WATER TREATMENT EQUIPMENT, NAMELY, BATH WATER PURIFYING APPARATUS FOR HOUSEHOLD PURPOSES, FLOW RESTRICTORS FOR REVERSE OSMOSIS, WATER PURIFICATION UNITS AND HOT WATER TANKS, CARTRIDGE FILTRATION UNITS, CHEMICAL STERILIZATION UNITS; SANITARY INSTALLATIONS, NAMELY, BIDETS, TOILETS, URINALS, WASH-HAND SINKS AND WASH STAND STORAGE UNITS SOLD AS A UNIT WITH THE SINKS, TOILET SEATS; PREASSEMBLED INSTALLATION UNITS FOR SHOWERS, SHOWER DEVICES, LIGHTS SOLD AS A UNIT AND COMPRISED PRIMARILY OF WALL LIGHTS, LIGHTING FIXTURES, LIGHTING FIXTURES FOR BATHTUBS; SANITARY FITTINGS OF METAL, PLASTIC AND GLASS, NAMELY, BATH TUB HANDLES; ASSEMBLY COMPONENTS FOR SANITARY UNITS, NAMELY, FOOTINGS, SUPPORTS, ANCHORAGES, MOUNTS FOR WASHBASINS, MOUNTS FOR SHOWER STALLS, MOUNTS FOR BATH TUBS, MOUNTS FOR TOILETS, MOUNTS FOR BIDETS, MOUNTS FOR URINALS, PEDESTALS FOR WASHBASINS, SHOWER PANELS, PRESSURE REGULATORS, SHOWER MIXERS; VERTICAL SUPPORT COLUMN FOR SUPPORTING A SANITARY INSTALLATION AND FOR HOUSING A WATER PIPE FOR SUPPLYING THE SANITARY INSTALLATION WITH WATER; SHOWER TUBS AND SINKS OF PLASTIC, CERAMIC AND METAL FOR SANITARY PURPOSES, NAMELY, SHOWER TUBS AND SINKS WITH SWIRL NOZZLES AND/OR AERATING NOZZLES, NOZZLE FITTINGS AND PUMPS FOR TUBS WITH SWIRL NOZZLES, BLOWING MACHINES, INCLUDING BLOWING MACHINES WITH HEATING MECHANISMS FOR HEATING THE BLAST AIR, FOR AERATING BATHING WATER IN TUBS, HEATING MECHANISMS AND FILTERS FOR BATHING WATER, STEAM BATH INSTALLATIONS AND ACCESSORIES THEREFOR, FITTINGS FOR STEAM BATHS, STEAM GENERATORS, VAPORIZERS, WATER SOFTENING UNITS, LIGHTING DEVICES FOR TUBS, DEVICES FOR STEAM BATHS AND SHOWERS ALL SOLD AS A UNIT WITH THE SHOWER TUBS AND SINKS; MOBILE COMPACT-WHIRL UNIT FOR FITTING IN BATHTUBS, WITH MOTORS, PUMPS AND NOZZLE SYSTEMS FOR WHIRLING WATER | SECTION 71 - CANCELLED | — |
| 019 | DOUBLE-WALL CONSTRUCTIONS NOT OF METAL FOR SANITARY PURPOSES, NAMELY, WALL PANELS NOT OF METAL; SHOWER PARTITIONS OF GLASS OR PLASTIC SOLD AS A UNIT WITH AND WITHOUT FITTINGS OF METAL | SECTION 71 - CANCELLED | — |
| 020 | FURNITURE, BATHROOM FURNITURE, NAMELY, STORAGE RACKS, SUSPENDED CABINETS, DRESSING TABLES, MEDICINE CABINETS, MIRRORS, MIRRORED CABINETS, PICTURE FRAMES; GOODS OF WOOD, CORK, REED, CANE, WICKER, HORN, BONE, IVORY, WHALEBONE, SHELL, AMBER, MOTHER-OF-PEARL, MEERSCHAUM AND SUBSTITUTES FOR ALL THESE MATERIALS, OR OF PLASTICS, NAMELY, STORAGE UNITS COMPRISED OF SHELVES, CABINETS, DOORS, FURNITURE HANDLES, BRACKETS FOR ATTACHMENT TO FURNITURE TO SUPPORT ITEMS TO BE KEPT IN HANDS REACH, AS COMPONENTS OF INTERIOR DISPLAY ASSEMBLIES COMPOSED PRIMARILY OF FIBERGLASS; SANITARY FITTINGS OF METAL, PLASTIC AND GLASS, NAMELY, STORAGE UNITS FITTED WITH MIRRORS, SHELVES, AND SHELF BRACKETS, BUTLER TRAYS, NON-METAL FURNITURE HANDLES, NON-METAL TOWEL HANGERS, NON-METAL BRACKETS FOR GENERAL USE, MIRRORED STORAGE UNITS CONSISTING PRIMARILY OF SHELVES, CUPBOARDS, BASKETS AND CLOTHES RODS SOLD AS A UNIT; STORAGE RACKS; WINDOW AND DOOR FITTINGS OF PLASTIC; NON-METAL FITTINGS FOR SANITARY INSTALLATIONS, NAMELY, SHELVES, CABINETS AND NON-METAL WALL HOOKS; WORKS OF ART OF STONE, CONCRETE, MARBLE, WOOD, WAX, PLASTER OR PLASTIC | SECTION 71 - CANCELLED | — |
| 021 | HOUSEHOLD OR KITCHEN UTENSILS NOT OF PRECIOUS METAL OR COATED THEREWITH, NAMELY, POT AND PAN SCRAPERS, ROLLING PINS, SPATULAS, TURNERS, WHISKS ;CONTAINERS FOR HOUSEHOLD OR KITCHEN USE NOT OF PRECIOUS METAL OR COATED THEREWITH; COMBS AND SPONGES, NAMELY, BATH SPONGES, CLEANING SPONGES; BRUSHES, NAMELY, HAIRBRUSHES, DISHWASHING BRUSHES; BRUSH-MAKING MATERIALS; ARTICLES FOR CLEANING PURPOSES, NAMELY, CLEANING RAGS; STEELWOOL; UNWORKED OR SEMI-WORKED GLASS EXCEPT GLASS USED IN BUILDING; BEVERAGE GLASSWARE, PORCELAIN AND EARTHENWARE, NAMELY, SOAP DISHES, SOAP HOLDERS; SANITARY FITTINGS OF METAL, PLASTIC AND GLASS, NAMELY SOAP DISHES, SOAP HOLDERS, TOWEL BARS, RAILS AND RINGS AND TOILET ROLL HOLDERS, TOILET BRUSHES AND HOLDERS THEREFOR, TOOTHBRUSHES, LAWN SPRINKLERS, VASES, NOT OF PRECIOUS METAL, WASTE BINS/CONTAINERS | SECTION 71 - CANCELLED | — |
| 041 | ARRANGING AND CONDUCTING OF EDUCATIONAL AND CULTURAL EVENTS, NAMELY, EDUCATIONAL CONFERENCES, FESTIVALS IN THE NATURE OF ARCHITECTURAL DESIGN, PERFORMANCE ART, EXPERIMENTAL DANCE, MUSIC, SCULPTURE, FILM AND PAINTING FESTIVALS; ART EXHIBITIONS; CONDUCTING PROFESSIONAL WORKSHOPS, TRAINING COURSES, AND SEMINARS IN THE FIELDS OF ARCHITECTURAL DESIGN INTERIOR DESIGN, DESIGN OF MANUAL AND ELECTRONIC PLUMBING FITTINGS AND FIXTURES FOR BATHROOMS AND KITCHENS, DESIGN OF ACCESSORIES FOR MANUAL AND ELECTRONIC PLUMBING FITTINGS AND FIXTURES FOR BATHROOMS AND KITCHENS, DESIGN OF FURNITURE FOR BATHROOMS AND KITCHENS, METAL-WORKING, MARKETING, AND LEGAL PROTECTION OF INTELLECTUAL PROPERTY; SYMPOSIUMS IN THE FIELDS OF ARCHITECTURAL DESIGN, INTERIOR DESIGN, DESIGN OF MANUAL AND ELECTRONIC PLUMBING FITTINGS AND FIXTURES FOR BATHROOMS AND KITCHENS, DESIGN OF ACCESSORIES FOR MANUAL AND ELECTRONIC PLUMBING FITTINGS AND FIXTURES FOR BATHROOMS AND KITCHENS, DESIGN OF FURNITURE FOR BATHROOMS AND KITCHENS, METAL-WORKING, MARKETING, AND LEGAL PROTECTION OF INTELLECTUAL PROPERTY; ARRANGING AND CONDUCTING OF MUSIC CONCERTS, DRAMATIC PRODUCTIONS IN THE NATURE OF PLAYS AND LIVE PERFORMANCES OF PARODIES, STAGE PERFORMANCES IN THE NATURE OF PLAYS AND PARODIES | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jun 19, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Jun 19, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 6, 2020 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 1, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 1, 2020 | INPC | INVALIDATION PROCESSED | — |
| Jan 10, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 10, 2019 | C71T | CANCELLED SECTION 71 | — |
| Oct 9, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 25, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Jun 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 29, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 29, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 9, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 25, 2012 | UNDR | UNDELIVERABLE MAIL - CORRESP. REMAILED | — |
| Oct 9, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 29, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 3, 2012 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 24, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 4, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 4, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 20, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 7, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 6, 2012 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Jun 6, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 5, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 5, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 5, 2012 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Dec 22, 2011 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 22, 2011 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 22, 2011 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 5, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 5, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 14, 2011 | ALIE | ASSIGNED TO LIE | — |
| Oct 27, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 13, 2011 | RFNP | REFUSAL PROCESSED BY IB | — |
| Apr 28, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 28, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 28, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 27, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 27, 2011 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Apr 27, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 26, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 26, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 22, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 22, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 21, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |