USPTO serial 79095513
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 009 | Solar collectors for electricity-production (photovoltaic); solar thermal collectors for electricity-production; energy-generation facilities, specifically solar thermal facilities for electricity-production consisting of solar collectors or solar mirrors, receiver devices and electric devices, apparatus and instruments for steering, controlling, recording and supervision (of the solar thermal energy generating facility); energy-generation facilities, specifically photovoltaic facilities for electricity-production consisting of solar modules for electricity-production, DC/AC converters and electric devices and instruments apparatus for steering, controlling, recording and supervision (of the photovoltaic energy generating facility); parabolic mirrors; DC/AC converters; solar mirrors; included in this class | SECTION 70 - CANCELLED | — |
| 011 | Energy-generation facilities for the production of heat or steam; solar thermal facilities for the production of heat or steam | SECTION 70 - CANCELLED | — |
| 019 | Glass components, specifically but not limited to, glass components with photovoltaic modules; included in this class | SECTION 70 - CANCELLED | — |
| 035 | IT-consulting, specifically organizational project management in the IT-area; preparation of commercial reports | SECTION 70 - CANCELLED | — |
| 037 | Installation, maintenance and repair of energy-generation facilities and machines, especially solar thermal and photovoltaic facilities; erection of energy-generation facilities especially erection of solar thermal and photovoltaic facilities | SECTION 70 - CANCELLED | — |
| 042 | IT-consulting in connection with the sale, production, installation and maintenance of machines for pumps, solar facilities, solar thermal facilities, photovoltaic facilities, photovoltaic modules as well as renewable-energy-generation devices; planning of construction and erection; consulting in the erection (of energy-generation facilities); conducting of scientific/industrial research and development projects; preparation of technical expert reports; all aforementioned services in connection with the erection of energy-generation facilities, especially solar thermal and photovoltaic facilities | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 11, 2021 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Oct 10, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Dec 23, 2012 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 9, 2012 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Nov 28, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 28, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 26, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Sep 26, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Nov 28, 2011 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Nov 28, 2011 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| May 25, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 29, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 29, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 29, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 28, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 26, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 22, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 22, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 21, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |