USPTO serial 79095658
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Building materials and components of metal, for photovoltaic, solar thermal and solar installations, namely, module frames, mounting systems consisting of rod, slats, end caps, countertops, soffits, fascia, corrugated metal sheets, flashings, mounting rails, rail splices, spacers, profiles used for arranging devices on and in walls, ceilings, roofs and other surfaces, fastening systems consisting of metal fasteners, roof hooks, clips, clamps, bolts and nuts; building materials and components of metal, namely, module frames, corrugated metal sheets and flashings containing solar cells, solar modules and solar collectors; metal roofs with integrated solar cells, solar modules and solar collectors; rigid pipes of metal for building and metal fasteners for photovoltaic, solar thermal and solar installations | SECTION 71 - CANCELLED | — |
| 009 | Photovoltaic solar modules for production of electricity; solar cells and solar panels for production of electricity; components of glass, namely, synthetic quartz glass plates being structural parts of solar cells; special purpose glass for optical, chemical, physical, electric, electrotechnical and electronic purposes, namely, glass covered with an electrical conductor, conductive fibers, namely, fluoride glass fibers; measuring, testing, checking supervision apparatus and instruments, namely, inverters and data loggers for inverters, bevels, rain gauges, laser distance meter, remote controls used for the regulation and control of interior and exterior window blinds, temperature sensors, electric wind sensors, and electric sun sensors; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electric conductors, electric switches, electric cables, cable connectors, junction boxes, electric transformers, electric accumulators, electric commutators, electric storage batteries and voltage regulators for electric power and automatic switchboards; apparatus or components for energy generation, namely, apparatus or components for converting light or solar energy into electricity, namely, solar panels for production of electricity; solar charge voltage regulators; electronic cables, wires and connection fittings; electric and electronic equipment, namely, smart metering components, namely, electric meters; electric and electronic components for the construction of photovoltaic, solar thermal and solar installations, namely, temperature sensors, sun sensors, wind sensors, transceivers with collection and display technology for the status and tracking of the technical data of photo-voltaic and solar thermal installations; all the aforesaid goods in particular for use in the field of photovoltaic, solar thermal and solar installations | SECTION 71 - CANCELLED | — |
| 011 | Solar heat collection panels; solar installation systems for heating consisting of boilers, valves, pipes, manifolds, solar panels, control panel, switches and electrical wire, all sold as a unit; apparatus for lighting, heating, steam generating, drying, ventilating, water supply and sanitary purposes, namely, hot-air space heating apparatus, hot-water space heating apparatus, steam valve, ventilating louvers; thermal heat pumps; solar thermal collectors | SECTION 71 - CANCELLED | — |
| 019 | Building materials and components, not of metal for photovoltaic, solar thermal and solar installations, namely, module frames, mounting systems consisting of slats, end caps, countertops, soffits, fascia, flashing, plastic panels, mounting rails, rail splices, spacers, mouldings for use in building construction, non-metal bonding fasteners for mounting of ceiling, wall and roof panels consisting of roof hooks, clips, clamps, bolts and nuts, anti-slip brackets; non-metallic building materials and components, namely, encapsulant frames, flashings and plastic panels containing solar cells, solar modules and solar collectors; roofing, not of metal, incorporating solar cells, solar modules and solar collectors; non-metallic rigid pipes, namely, gutter pipes, water pipes, sewer pipes, polyethylene pipes, pipes of polypropylene, for use with photovoltaic, solar thermal and solar installations; non-metallic fastening systems consisting of mounting rails and rail splices for use with photovoltaic, solar thermal and solar installations | SECTION 71 - CANCELLED | — |
| 040 | Generation of power, in particular solar power; production of electricity; treatment of materials by laser beam and by application of chemical preparations for the production of parts for solar, solar thermal and photovoltaic installations and their components and accessories; consultancy in the field of energy generation | SECTION 71 - CANCELLED | — |
| 042 | Architectural and construction drafting and consultancy with regard to the use of solar power; engineering; technical consultancy and expert opinion regarding the planning of solar technology, solar, solar thermal and photovoltaic installations; technical planning of solar, solar thermal and photovoltaic installations as well as components and accessories therefor | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 22, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED | — |
| Nov 22, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 30, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jul 10, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jul 10, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jun 19, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 19, 2018 | C71T | CANCELLED SECTION 71 | — |
| Oct 25, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 6, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 18, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 18, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 13, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 13, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Dec 27, 2011 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 7, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 7, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 7, 2011 | NPUB | NOTICE OF PUBLICATION | — |
| Nov 21, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 21, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 14, 2011 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Nov 10, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 10, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Oct 25, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 25, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 18, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 18, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 5, 2011 | ALIE | ASSIGNED TO LIE | — |
| Sep 26, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 28, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 10, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 10, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 10, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 9, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 3, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 29, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 29, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 28, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |