USPTO serial 79095845
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Claudia A. Smith
Claudia A. Smith White & Case LLP1155 Avenue of the AmericasPatent and Trademark DepartmentNew York, NY 10036| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Energy production installations, namely, electric current generators, gas and steam turbines other than for land vehicles, combustion engines other than for land vehicles; parts of facilities for co-generation of heat and power, namely, combustion engines, electric current generators; engines other than for land vehicles, combustion engines for combined heat and power units; apparatus and installations for generating electricity, namely, block-type thermal power stations | SECTION 71 - CANCELLED | — |
| 009 | Apparatus and installations for electricity generation, namely, fuel cells; physical, electric and electronic measuring, control and regulating apparatus, namely, sensor devices for use in measuring pressure, concentration, temperature and quantity of gas and liquids and for use in regulating and controlling the operation of energy production installations; apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current | SECTION 71 - CANCELLED | — |
| 011 | Steam generating installations, electrical, furnace and heating boilers, industrial ovens, industrial hot water heating installations, hot water heaters; gas burners; parts of facilities for cogeneration of heat and power, namely, heat pumps and heating apparatus fueled by fuel cells | SECTION 71 - CANCELLED | — |
| 012 | Combustion engines for land vehicles; motors for land vehicles | SECTION 71 - CANCELLED | — |
| 035 | Services of an energy broker, namely, arranging of buying and selling contracts for third parties for the purchase of electricity and gas; professional business and organisational consultancy with regard to climate protection measures; professional business and organisational planning services with regard to apparatus for heating, boilers and burners, facilities for cogeneration of heat and power, heat pumps, block-thermal power stations, fuel cells, fuel cell heating apparatus, machinery for the production of electricity and energy, engines other than for land vehicles, measuring, control and regulating apparatus, apparatus and instruments for conducting, switching, transforming, accumulating, regulating and controlling electricity or gas | SECTION 71 - CANCELLED | — |
| 036 | Project planning and services of a construction management agent except planning and installation of lighting equipment, namely, planning and conducting of building projects for others with regard to finance in the nature of project financing and consultancy concerning financing of energy projects; project financing for facilities for the transmission, distribution and generation of energy; real estate brokerage services | SECTION 71 - CANCELLED | — |
| 037 | Building construction; construction, installation, assembly, maintenance and repair of energy generating facilities and installation of energy generating installations in the nature of AC generators, current generators, DC generators, electric generators, electricity generators, electrostatic generators, gas operated power generators, generators of electricity, high voltage generators, mobile electric power generators, portable electric power generators, solar-powered electricity generators, steam operated power generators, gas and steam turbines other than for land vehicles, and internal combustion engines for power generation, other than for land vehicles; services of a property developer, namely, construction of facilities for the transmission, distribution and generation of energy | SECTION 71 - CANCELLED | — |
| 038 | Telecommunications services, namely, local and long distance transmission of voice, audio, visual images and data by means of telephone, cable, broadband optical and wireless networks in the field of energy supply; electronic exchange of data stored in databases accessible via telecommunication networks; leasing and rental of telecommunication equipment; telecommunication services, namely, providing electronic message alerts via telephone or the Internet notifying individuals of a changed status or condition of a sensing device in a energy supply system | SECTION 71 - CANCELLED | — |
| 039 | Energy supply, namely, distribution of energy in the form of electricity, heat or gas; transmission of electrical energy and heat supplying | SECTION 71 - CANCELLED | — |
| 040 | Power and energy generation | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, scientific research, testing and analysis in the field of gas based power, energy generation and supply; engineering; technical consultancy with regard to energy production installations and testing and analysis equipment | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 4, 2020 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Sep 4, 2020 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Nov 30, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 3, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 2, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jul 2, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 2, 2018 | C71T | CANCELLED SECTION 71 | — |
| Mar 27, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 23, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 31, 2013 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Oct 31, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 22, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 27, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 27, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jun 27, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Mar 27, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 10, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jan 10, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Dec 21, 2011 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 21, 2011 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Dec 21, 2011 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Dec 6, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Nov 30, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Nov 30, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Nov 30, 2011 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Nov 30, 2011 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Nov 30, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 14, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 14, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 8, 2011 | ALIE | ASSIGNED TO LIE | — |
| Oct 25, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 26, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| May 3, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 3, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 3, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 3, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 2, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 29, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 29, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 28, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |