Drawing for SNR

USPTO serial 79096822

SNR

Reviewed by CopyMark Law Group

Reg. 4181274Status 707Registered
Filing date
Status date
Registration date
Jul 31, 2012
Examiner
HUSSAIN, TASNEEM
Law office
—

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SNR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Andy I. Corea

Andy I. Corea Murtha Cullina265 Church StreetOne Century TowerNew Haven, CT 06510

Goods and services

ClassDescriptionStatusFirst use
007Machines for manufacturing bearings; metalworking machine tools; component machine parts of these machines, namely, ball bearings, roller bearings, thrust bearings, smooth rings or plain bearings, ball cages, roller cages or needle roller cages, bearings for transmission shafts other than for land vehicles; bearings as part of machines; cranes as lifting and hoisting apparatus; wind turbines; hydraulic pile extractors; agricultural machines, namely, reapers, disk harrows, seeders, cultipackers; large agricultural implements and component parts of these implements, namely, cultivators, harvesters, incorporators, seed drills, hay balers, coultersACTIVE—
009[ Scientific apparatus and instruments, namely, testing equipment for measuring the temperature, weight, speed, pressure, position or form of workpieces in a machine tool; electric apparatus and instruments, namely, testing equipment for measuring the temperature, weight, speed, pressure, position or form of workpieces in a machine tool; optical apparatus and instruments, namely, testing equipment for measuring the temperature, weight, speed, pressure, position or form of workpieces in a machine tool; scientific apparatus, namely, sensing and signaling devices for measurement and quality control of materials processing in connection with rolling bearings, thrust bearings, transmission shafts, bearings and component parts of machines, machine tools and land, air, sea and space vehicles; data processors and computers; computer software for maintaining and monitoring machines, especially for data management; computer software, CD-ROMs, DVD-ROMs for training on the use of technology and products, namely, rolling bearings, thrust bearings, transmission shafts, bearings and component parts of machines, machine tools and land, air, sea and space vehicles; gloves for protection against accident; laser thermometers, not for medical purposes ]SECTION 71 - CANCELLED—
012[ Land vehicles, namely, automobiles, buses, trucks, vans, tractors, lift trucks and trains; air vehicles, namely, aeroplanes, and seaplanes; space vehicles; sea vehicles, namely, boats, canoes, hydroplanes, ships; component parts of the aforementioned land vehicles, namely, transmission shafts ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Dec 11, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 17, 2024INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
May 13, 2024INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
May 13, 2024INPCINVALIDATION PROCESSED—
May 9, 2024INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 9, 2023NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 9, 202371.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Sep 8, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Jul 29, 2023ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Mar 9, 2023PR71POST REGISTRATION ACTION MAILED - SEC.71—
Feb 5, 2023APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 28, 2022ES71TEAS SECTION 71 RECEIVED—
Jul 31, 2021REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Jan 28, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Aug 2, 2019INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Jun 3, 2019INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 3, 2019INPCINVALIDATION PROCESSED—
May 10, 2019INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Sep 10, 2018NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 10, 201871.PREGISTERED - PARTIAL SEC 71 ACCEPTED—
Sep 10, 2018PRANPOST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED—
Aug 23, 2018PR71POST REGISTRATION ACTION MAILED - SEC.71—
Aug 16, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Jul 27, 201871AFREGISTERED-SEC.71 FILED—
Jul 27, 201871AFREGISTERED-SEC.71 FILED—
Jul 27, 2018ES71TEAS SECTION 71 RECEIVED—
Jun 5, 2018ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 5, 2018REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 31, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 9, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
May 25, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Apr 19, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Apr 19, 2013FIMPFINAL DISPOSITION PROCESSED—
Oct 31, 2012FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jul 31, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
May 15, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
May 15, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Apr 25, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Apr 12, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 5, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Apr 4, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Apr 4, 2012ALIEASSIGNED TO LIE—
Apr 4, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Apr 4, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Apr 4, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Jan 5, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Dec 12, 2011CNFRFINAL REFUSAL MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Dec 12, 2011CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Nov 29, 2011TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Nov 29, 2011CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Nov 29, 2011TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jun 19, 2011RFNTREFUSAL PROCESSED BY IB—
May 31, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
May 31, 2011RFRRREFUSAL PROCESSED BY MPU—
May 31, 2011MAFRAPPLICATION FILING RECEIPT MAILED—
May 29, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
May 28, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 27, 2011DOCKASSIGNED TO EXAMINER—
May 27, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
May 26, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance