USPTO serial 79097235
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Mainak H. Mehta
Mainak H. Mehta Procopio, Cory, Hargreaves & Savitch LLP525 B. Street, Suite 2200San Diego, CA 92101UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | [ Tubes, piping, ducts, conduits, manually-operated mixing and outflow control valves made of base metal, all for use in ventilation, air-conditioning, warm-air heating and exhaust systems and structural parts and fittings therefor, none of these goods being equipment for treating steam or used with such equipment, and being equipment for controlling fluids or used with such equipment ] | SECTION 71 - CANCELLED | — |
| 007 | Machines for use in the sheet metal industry, namely, metal working machines for manufacturing spiral tubes and ducts, shaping machines for metalworking in the nature of flanging and locking machines, cutting machines for metal working, Rolling mills for metalworking, rolling machines for rolling metals, hydraulic presses for metalworking, electrical welding machines for metalworking, mechanical presses for metalworking, shaping machines for metal working and structural parts and fittings therefor; mixing and control valves being of machines, and structural parts and fittings therefor; none of these goods being equipment for treating steam or used with such equipment and being equipment for controlling fluids or used with such equipment | ACTIVE | — |
| 011 | [ Tubes, piping, ducts, conduits, mixing and outflow control valves, all as part of ventilation, air-conditioning, hot-air heating and evacuation installations, namely, ventilation, air-conditioning, warm-air heating, and exhaust systems composed primarily of tubes, piping, ducts, mixing and outflow control valves; component parts of ventilation, air-conditioning, hot-air heating and evacuation installations, namely, tubes, piping, ducts, conduits and mixing and outflow control valves all specifically designed for use as integrated parts of air-conditioning, air-cooling, Hot-air space heating and ventilation apparatus and instruments; none of these goods being equipment for treating steam or used with such equipment, and being equipment, and being equipment for controlling fluids or used with such equipment ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 7, 2025 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Mar 24, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Feb 7, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 7, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jun 7, 2022 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jun 3, 2022 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 5, 2021 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Apr 19, 2019 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Mar 14, 2019 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Mar 14, 2019 | INPC | INVALIDATION PROCESSED | — |
| Mar 5, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 5, 2018 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Jul 5, 2018 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jun 26, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 5, 2018 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 11, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Oct 27, 2016 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Oct 20, 2016 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Apr 14, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 6, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 6, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 5, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 5, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 20, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 29, 2012 | NPUB | NOTICE OF PUBLICATION | — |
| Feb 10, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 8, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jan 25, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 11, 2012 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Jan 11, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 11, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 20, 2011 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Dec 19, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 19, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Nov 23, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 22, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 22, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 10, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 24, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 24, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 23, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 22, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 11, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Jun 8, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jun 4, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jun 3, 2011 | PCOI | PARTIAL CANCELLATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jun 2, 2011 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |