Drawing for LUXOR

USPTO serial 79098107

LUXOR

Reviewed by CopyMark Law Group

Reg. 4492898Status 709
Filing date
Status date
Registration date
Mar 11, 2014
Examiner
MORENO, PAUL A
Law office

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LUXOR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
004[ Industrial oils and greases; industrial lubricants; dust absorbing, wetting and binding compositions for use in the manufacture of photovoltaic modules; fuels and lighting fuels; electrical energy; candles and wicks for candles for lighting; all the aforesaid goods for use in the field of renewable energy ]SECTION 71 - CANCELLED
006fixing material of metal, namely, metal fasteners for mounting solar panels; materials of metal for scaffolds, metal racks [, metal poles, stakes and masts of metal ] for mounting solar panels, metal building profiles [ and frames ] for solar modules and for construction purposes; all the aforesaid goods for use in the field of renewable energySECTION 71 - CANCELLED
009[ Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking, life-saving and teaching apparatus and instruments, namely, electronic device for monitoring and optimizing photovoltaic arrays and electronic sensors for measuring solar radiation; * excluding video, photographic and lighting apparatus and instruments used in connection with borescopes or microscopes; * ] apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, solar panels for production of electricity; [ solar cells; photovoltaic cells and modules; photovoltaic inverters; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members, photovoltaic solar modules, photovoltaic cladding panels, photovoltaic solar hybrid modules, photovoltaic thermal hybrid modules, photovoltaic thermal module; ] photovoltaic systems consisting of solar modules for power generation, inverters, electronic apparatus and instruments for controlling, regulating, accumulating and monitoring; solar panel systems consisting of solar modules, solar collectors and inverters for power generation; electronic apparatus and instruments for controlling, regulating, accumulating and monitoring of power generation; [ blank magnetic data carriers, data processing apparatus; ] except apparatus for games adapted for use with television sets only, computer programs, electronic components for apparatus adapted for use with television sets only, prepaid gaming machines, gaming machines, gaming machines other than those adapted for use with television sets only; all the aforesaid goods being for use in the field of renewable energy * and excluding batteries, accumulators, chargers for accumulators, safety switchgears for mains power failure *SECTION 71 - CANCELLED
011[ Apparatus for heating, steam generating, cooking, refrigerating, drying, ventilating and water conduit purposes, namely, solar collectors, solar energy receivers, solar reactors, solar heat collection panels, and parabolic mirrors designed for the collection of solar energy; solar energy based cooling apparatus; solar water heaters; solar thermal installations, namely, solar thermal modules; solar collectors and solar modules for heat generation and systems consisting thereof; solar collectors and solar energy receivers for roof installations and open-air installations ]SECTION 7(e) - CANCELLED
019[ Non-metal building materials for mounting solar panels, non-metal architectural mouldings, namely, building profile ledges; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; roofing, not of metal, incorporating solar cells ]SECTION 71 - CANCELLED
035[ Advertising services; business management services; business administration; providing office functions; professional business and organizational planning of systems and plants for regenerative energy generation; professional business management and business organization consultancy for systems and plants for regenerative energy generation; business project management, in particular for systems and plants in the field of renewable energy; arranging of commercial contracts for others for the buying and selling of power supplies ]SECTION 71 - CANCELLED
037Building construction; repair services, namely, repair services of individual components in the field of photovoltaic and solar thermal energy [ ; installation services, namely, installation of photovoltaic and solar thermal energy equipment, and installation of solar energy systems and alternative energy products for residential and commercial use; construction, cleaning, repair and maintenance of systems and plants in the field of renewable energy; scaffolding erection, construction and repair; roofing services ]SECTION 71 - CANCELLED
039[ Transport of goods by air, bus, marine, railway, truck; packaging and storage of goods, namely, photovoltaic and solar thermal energy equipment; arranging of travel tours; transmission and transport, namely, distribution of electricity, thermal heat, gas or water; delivery of electricity, thermal heat, gas or water for supply to customers; delivery and distribution of energy ]SECTION 71 - CANCELLED
040[ Treatment of materials for the production of energy, generation of energy ]SECTION 71 - CANCELLED
042Scientific and technological services, namely, research, technology planning, development and design in the fields of solar energy and renewable energy [ ; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; creation and development of computer hardware and software; technological analysis and preparation of technical certificates for assessment of projects and project partners in the fields of solar energy and renewable energy; technological planning and design of projects and technological coordination of systems and plants in the field of renewable energy; quality management services, namely, quality testing of products for certification purposes; surveying; construction drafting and architectural consultancy; development services, for others, in the field of renewable energies; engineering services; except services in connection with apparatus for games adapted for use with television receivers only, computer programs, electronic components for apparatus adapted for use with television receivers only, prepaid gaming machines, gaming machines, other gaming machines adapted for use with television receivers only ]SECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 6, 2026C71TCANCELLED SECTION 71
Mar 11, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED
Jun 6, 2022FIXDELECTRONIC RECORD REVIEW COMPLETE
Jun 18, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED
Apr 22, 2021RNWLINTERNATIONAL REGISTRATION RENEWED
Feb 28, 2021INNPPARTIAL INVALIDATION PROCESSED BY THE IB
Jan 15, 2021INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Jan 15, 2021INPCINVALIDATION PROCESSED
Jan 12, 2021INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Oct 1, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB
Jun 25, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED
May 15, 2020ERRRON HOLD - ELECTRONIC RECORD REVIEW REQUIRED
May 14, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED
May 12, 2020NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED
May 12, 202071.PREGISTERED - PARTIAL SEC 71 ACCEPTED
Apr 22, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL
Mar 10, 2020ES71TEAS SECTION 71 RECEIVED
Mar 11, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Oct 27, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Jul 15, 2015INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE
Mar 24, 2015INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED
Feb 26, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB
Feb 5, 2015CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Feb 5, 2015CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Feb 4, 2015LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Feb 4, 2015LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Jan 30, 2015CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Jan 30, 2015CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Jan 30, 2015LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jan 30, 2015LIMGLIMITATION OF GOODS RECEIVED FROM IB
Aug 16, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Jul 31, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB
Jul 31, 2014FIMPFINAL DISPOSITION PROCESSED
Jul 25, 2014LIMELIMITATION FROM THE IB EXAMINED AND ENTERED
Jul 25, 2014LIMELIMITATION FROM THE IB EXAMINED AND ENTERED
Jul 24, 2014COC.CORRECTION UNDER SECTION 7 - PROCESSED
Jul 24, 2014PLGLASSIGNED TO PARALEGAL
Jun 19, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jun 19, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jun 11, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
May 28, 2014LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Mar 11, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Feb 18, 2014GPNXNOTIFICATION PROCESSED BY IB
Dec 24, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Dec 24, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 17, 2013CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Dec 4, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 4, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Dec 4, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Nov 22, 2013CRCVCORRECTION TRANSACTION RECEIVED FROM IB
Nov 22, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB
Nov 3, 2013PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Oct 22, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Oct 15, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Sep 5, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Sep 5, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Aug 27, 2013ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Jul 12, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jul 12, 2013GNSLLETTER OF SUSPENSION E-MAILED
Jul 12, 2013CNSLSUSPENSION LETTER WRITTEN
May 29, 2013LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED
May 29, 2013LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED
May 29, 2013LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED
Apr 13, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB
Mar 30, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB
Feb 11, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB
Feb 5, 2013OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Feb 1, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Dec 5, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 5, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Jul 26, 2012RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Jul 26, 2012ALIEASSIGNED TO LIE
Jan 26, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Jan 26, 2012GNSLLETTER OF SUSPENSION E-MAILED
Jan 26, 2012CNSLSUSPENSION LETTER WRITTEN
Jan 4, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Jan 4, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Jan 4, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 16, 2011ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 16, 2011REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED
Jul 25, 2011RFNTREFUSAL PROCESSED BY IB
Jul 7, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Jul 7, 2011RFRRREFUSAL PROCESSED BY MPU
Jul 7, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Jul 6, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jul 5, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Jul 1, 2011DOCKASSIGNED TO EXAMINER
Jul 1, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jun 30, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance