USPTO serial 79098558
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Weil der Stadt/Hausen, DE
Weil der Stadt/Hausen, DE
Weil der Stadt/Hausen, DE
Boeblingen, DE
Zurich, CH
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Miriam D. Trudell
Miriam D. Trudell Davis Graham & Stubbs LLP3400 Walnut Street, Suite 700Denver, CO 80205United States| Class | Description | Status | First use |
|---|---|---|---|
| 004 | [ [ Industrial oils and greases; industrial lubricants; dust absorbing],wetting and binding compositions for use in the manufacture of photovoltaic modules;[ fuels and lighting fuels;] electrical energy; [ candles and wicks for candles for lighting ] ] | SECTION 71 - CANCELLED | — |
| 006 | [ Common metals and their alloys; building materials of metal, namely, aluminum profiles for mounting solar panels, rotary metal structures for mounting solar panels, solar modules and roof constructions; fixing material of metal, namely, metal fasteners for mounting solar panels; materials of metal for scaffolds, metal racks, metal poles, stakes and masts of metal for mounting solar panels, metal building profiles and frames for construction purposes; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal not for electrical purposes; ironmongery, small items of metal hardware, namely, metal brackets, metal washers, and metal nuts for construction purposes; pipes and tubes of metal; metal safes; goods of common metal not included in other classes, namely, substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors and solar panel mounts; metal ores; * all the aforesaid goods exclusively for the mounting of photovoltaic systems and their parts * ] | SECTION 71 - CANCELLED | — |
| 009 | [ Scientific, [ nautical, surveying, photographic, cinematographic, optical, weighing,] measuring * apparatus and instruments (not for gas measurements) *, signaling, checking, [ life-saving and teaching ] Apparatus and instruments, namely, electronic device for monitoring and optimizing photovoltaic arrays, electronical sensors for measuring solar radiation; ] Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, solar panels for production of electricity; [ solar cells; photovoltaic cells and modules; photovoltaic inverters; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members, photovoltaic solar modules, photovoltaic cladding panels, photovoltaic solar hybrid modules, photovoltaic thermal hybrid modules, photovoltaic thermal module; ] photovoltaic systems consisting of solar modules for power generation, [ inverters, ] electronic apparatus and instruments for controlling, regulating, accumulating and monitoring; solar panel systems consisting of solar modules, solar collectors [ and inverters ] for power generation; electronic apparatus and instruments for controlling, regulating, accumulating and monitoring of power generation; [ blank magnetic data carriers, data processing apparatus and computers * (not for [ acturing ] * capturing * the measuring results of gas measurement) *; ] * all the aforesaid goods exclusively for the mounting of photovoltaic systems and their parts * | ACTIVE | — |
| 011 | [Apparatus for lighting, heating, steam generating, [ cooking, ] refrigerating, drying, ventilating and water conduit purposes, namely, solar collectors, solar energy receivers, solar reactors, solar heat collection panels, and parabolic mirrors designed for the collection of solar energy, * all aforementioned goods related to solar technology *; solar energy based cooling apparatus; solar water heaters; solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures, solar thermal installations, namely, solar thermal modules; solar collectors and solar modules for heat generation and systems consisting thereof; solar collectors and solar energy receivers for roof installations and open-air installations] | SECTION 71 - CANCELLED | — |
| 019 | [Non-metal building materials for mounting solar panels; non-metal architectural mouldings, namely, building profile ledges; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; roofing, not of metal, incorporating solar cells] | SECTION 71 - CANCELLED | — |
| 035 | [ Advertising services; business management services; business administration; providing office functions; professional business and organizational planning of systems and plants for regenerative energy generation; professional business management and business organization consultancy for systems and plants for regenerative energy generation; business project management, in particular for systems and plants in the field of renewable energy; arranging of commercial contracts for others for the buying and selling of power supplies ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building construction; ] Repair services, namely, repair services of individual components in the field of photovoltaic and solar thermal energy; installation services, namely, installation of photovoltaic and [ solar thermal ] energy equipment, and installation of solar energy systems and alternative energy products for residential and commercial use [ ; construction, cleaning, repair and maintenance of systems and plants in the field of renewable energy; scaffolding erection, construction and repair; roofing services ] | ACTIVE | — |
| 039 | [ Transport of goods by air, bus, truck, marine and railway; packaging and storage of goods, namely, photovoltaic [and solar thermal energy] equipment[; arranging of travel tours; transmission and transport, namely, distribution of electricity, thermal heat, gas or water; delivery of electricity, thermal heat, gas or water for supply to customers; delivery and distribution of energy ] ] | SECTION 71 - CANCELLED | — |
| 040 | [ Treatment of materials for the production of energy, generation of energy ] | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, research, technology planning, development and design in the fields of solar energy and renewable energy; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; [ design and development of computer hardware and software; technological analysis and preparation of technical certificates for assessment of projects and project partners in the fields of solar energy and renewable energy; ] technological planning and design of projects and technological coordination of systems and plants in the field of renewable energy; quality management services, namely, quality testing of products for certification purposes [ ; design, planning and engineering for third parties in the field of renewable energy; development services for third parties, namely, construction drafting and architectural consultancy in the field of renewable energy; engineering services ] | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 18, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 18, 2024 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Nov 18, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 18, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 17, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 7, 2024 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 7, 2024 | INPC | INVALIDATION PROCESSED | — |
| Feb 1, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 1, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jun 1, 2023 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| May 29, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Nov 18, 2022 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Nov 18, 2022 | PARI | TEAS VOLUNTARY AMENDMENT RECEIVED | — |
| Jun 18, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 4, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Feb 4, 2021 | FIXD | ELECTRONIC RECORD REVIEW COMPLETE | — |
| Oct 23, 2020 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jun 25, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 14, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 18, 2019 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Apr 22, 2019 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Apr 22, 2019 | INPC | INVALIDATION PROCESSED | — |
| Mar 25, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Aug 30, 2018 | NA15 | SEC. 15 ACKNOWLEDGEMENT - E-MAILED | — |
| Aug 30, 2018 | 15AK | REGISTERED - SEC. 15 ACKNOWLEDGED | — |
| Aug 28, 2018 | E15R | TEAS SECTION 15 RECEIVED | — |
| Jul 25, 2018 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jul 25, 2018 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| May 29, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 17, 2018 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Mar 12, 2016 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 7, 2016 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 4, 2015 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| May 13, 2015 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 9, 2015 | CORN | CORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 8, 2015 | ERRR | ON HOLD - ELECTRONIC RECORD REVIEW REQUIRED | — |
| May 7, 2015 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| May 7, 2015 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| May 7, 2015 | PLGL | ASSIGNED TO PARALEGAL | — |
| May 6, 2015 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| May 2, 2015 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 2, 2015 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| May 1, 2015 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| May 1, 2015 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 29, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Dec 22, 2014 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 26, 2014 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Apr 23, 2014 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Apr 22, 2014 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Apr 22, 2014 | PLGL | ASSIGNED TO PARALEGAL | — |
| Feb 28, 2014 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jan 9, 2014 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 9, 2013 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| May 9, 2013 | PLGL | ASSIGNED TO PARALEGAL | — |
| May 9, 2013 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Apr 28, 2013 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Mar 12, 2013 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Mar 12, 2013 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Mar 12, 2013 | PLGL | ASSIGNED TO PARALEGAL | — |
| Mar 10, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 17, 2013 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Feb 5, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 5, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 25, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 22, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 22, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Mar 6, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 6, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 15, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 15, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 15, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 30, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 30, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jan 13, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 5, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 4, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 4, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 16, 2011 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Dec 16, 2011 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Aug 7, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 15, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 15, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 15, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 14, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 12, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 8, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 8, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 7, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |