Drawing for LUXOR

USPTO serial 79098881

LUXOR

Reviewed by CopyMark Law Group

Reg. 5014988Status 709
Filing date
Status date
Registration date
Aug 9, 2016
Examiner
SAITO, KIM
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LUXOR?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
004Industrial oils and greases; industrial lubricants; dust absorbing, wetting and binding compositions for use in the manufacture of photovoltaic modules; fuels and lighting fuels; electrical energy; candles and wicks for candles for lighting; all the aforesaid goods for use in the field of renewable energySECTION 71 - CANCELLED
006Fixing material of metal, namely, metal fasteners for mounting solar panels; materials of metal for scaffolds, metal racks, metal poles, stakes and masts of metal for mounting solar panels, metal building profiles and frames for solar modules and for construction purposes; all the aforesaid goods for use in the field of renewable energySECTION 71 - CANCELLED
011Apparatus for heating, steam generating, cooking, refrigerating, drying, ventilating and water conduit purposes, namely, solar collectors, solar energy receivers, solar reactors, solar heat collection panels, and parabolic mirrors designed for the collection of solar energy; solar energy based cooling apparatus; solar water heaters; solar thermal installations, namely, solar thermal modules; solar collectors and solar modules for heat generation and systems consisting thereof; solar collectors and solar energy receivers for roof installations and open-air installationsSECTION 71 - CANCELLED
019Non-metal building materials for mounting solar panels, non-metal architectural mouldings, namely, building profile ledges; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; roofing, not of metal, incorporating solar cellsSECTION 71 - CANCELLED
035Advertising services; business management services; business administration; providing office functions; professional business and organizational planning of systems and plants for regenerative energy generation; professional business management and business organization consultancy for systems and plants for regenerative energy generation; business project management, in particular for systems and plants in the field of renewable energy; arranging of commercial contracts for others for the buying and selling of power suppliesSECTION 71 - CANCELLED
037Building construction; repair services, namely, repair services of individual components in the field of photovoltaic and solar thermal energy; installation services, namely, installation of photovoltaic and solar thermal energy equipment, and installation of solar energy systems and alternative energy products for residential and commercial use; construction, cleaning, repair and maintenance of systems and plants in the field of renewable energy; scaffolding erection, construction and repair; roofing servicesSECTION 71 - CANCELLED
039Transport of goods by air, bus, marine, railway, truck; packaging and storage of goods, namely, photovoltaic and solar thermal energy equipment; arranging of travel tours; transmission and transport, namely, distribution of electricity, thermal heat, gas or water; delivery of electricity, thermal heat, gas or water for supply to customers; delivery and distribution of energySECTION 71 - CANCELLED
040Treatment of materials for the production of energy, generation of energySECTION 71 - CANCELLED
042Scientific and technological services, namely, research, technology planning, development and design in the fields of solar energy and renewable energy; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; design and development of computer hardware and software; technological analysis and preparation of technical certificates for assessment of projects and project partners in the fields of solar energy and renewable energy; technological planning and design of projects and technological coordination of systems and plants in the field of renewable energy; quality management services, namely, quality testing of products for certification purposes; surveying; construction drafting and architectural consultancy; development services, for others, in the field of renewable energies; engineering services; except services in connection with apparatus for games adapted for use with television receivers only, computer programs, electronic components for apparatus adapted for use with television receivers only, prepaid gaming machines, gaming machines, other gaming machines adapted for use with television receivers onlySECTION 71 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 12, 2023INNTTOTAL INVALIDATION PROCESSED BY THE IB
Oct 26, 2023INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB
Oct 26, 2023INPCINVALIDATION PROCESSED
Oct 24, 2023INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED
Feb 24, 2023C71TCANCELLED SECTION 71
Aug 9, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED
Jun 18, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED
Feb 4, 2021RNWLINTERNATIONAL REGISTRATION RENEWED
Oct 1, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB
Jun 25, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED
May 14, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED
Jan 6, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB
Dec 20, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB
Dec 20, 2016FIMPFINAL DISPOSITION PROCESSED
Nov 9, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Oct 27, 2016ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB
Aug 9, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 1, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
May 24, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
May 24, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
May 4, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
May 4, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
May 4, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Apr 20, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Apr 15, 2016MREINOTICE OF REINSTATEMENT MAILED
Apr 14, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Apr 14, 2016JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY
Apr 14, 2016RGRRREINSTATEMENT GRANTED - RESPONSE RECEIVED
Jan 28, 2016APETASSIGNED TO PETITION STAFF
Jan 12, 2016ERRSTEAS REQUEST FOR REINSTATEMENT
Jan 4, 2016MAB4ABANDONMENT NOTICE MAILED - INTER PARTES DECISION
Jan 4, 2016ABN4ABANDONMENT - AFTER INTER PARTES DECISION
Jan 4, 2016OP.TOPPOSITION TERMINATED NO. 999999
Jan 4, 2016OP.SOPPOSITION SUSTAINED NO. 999999
Oct 9, 2015RFNPREFUSAL PROCESSED BY IB
Sep 16, 2015OP.IOPPOSITION INSTITUTED NO. 999999
Sep 15, 2015OPNSOPPOSITION NOTICE (IB REFUSAL) SENT TO IB
Sep 15, 2015OPNCOPPOSITION NOTICE (IB REFUSAL) CREATED
Apr 16, 2015ETOFEXTENSION OF TIME TO OPPOSE RECEIVED
Mar 17, 2015NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED
Mar 17, 2015PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 13, 2015GPNXNOTIFICATION PROCESSED BY IB
Feb 26, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB
Feb 25, 2015OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Feb 25, 2015OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB
Feb 25, 2015NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED
Feb 6, 2015PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Feb 6, 2015CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Feb 6, 2015XAECEXAMINER'S AMENDMENT ENTERED
Feb 6, 2015GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED
Feb 6, 2015GNEAEXAMINERS AMENDMENT E-MAILED
Feb 6, 2015CNEAEXAMINERS AMENDMENT -WRITTEN
Feb 6, 2015ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN
Aug 26, 2014LIMELIMITATION FROM THE IB - REQUEST EXAM REVIEW
Aug 15, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB
Jul 18, 2014LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED
Jun 13, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB
Mar 23, 2014PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY
Mar 20, 2014LIMGLIMITATION OF GOODS RECEIVED FROM IB
Mar 13, 2014PREVLAW OFFICE PUBLICATION REVIEW COMPLETED
Mar 12, 2014CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER
Mar 11, 2014TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Mar 11, 2014CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Mar 11, 2014ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED
Nov 30, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
May 29, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Dec 29, 2012OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Dec 12, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 12, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Nov 28, 2012RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Nov 27, 2012ALIEASSIGNED TO LIE
Nov 27, 2012ALIEASSIGNED TO LIE
Jun 7, 2012ATRVATTORNEY REVIEW COMPLETED
Jun 6, 2012LIMSLIMITATION OF GOODS/SERVICES FROM IB ENTERED
May 24, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
May 24, 2012GNSLLETTER OF SUSPENSION E-MAILED
May 24, 2012CNSLSUSPENSION LETTER WRITTEN
May 4, 2012LIMGLIMITATION OF GOODS RECEIVED FROM IB
May 3, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
May 2, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
May 2, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Nov 26, 2011RFNTREFUSAL PROCESSED BY IB
Nov 10, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Nov 3, 2011RFRRREFUSAL PROCESSED BY MPU
Nov 3, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Nov 2, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 25, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Oct 19, 2011DOCKASSIGNED TO EXAMINER
Oct 19, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 8, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance