USPTO serial 79098924
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Paul D. Bianco, PhD
Paul D. Bianco, PhD Fleit Intellectual Property Law21355 E. Dixie HighwaySuite 115Miami, FL 33180| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials, namely, metal profiles, [ metal pipes, metal plates, ] sheet metal plates, metal foils, metal windows, metal portals, namely, metal doors, metal gates, metal shutters, metal wickets, and metal doorway barriers; prefabricated and partly-prefabricated beams and frameworks consisting primarily of metal and glass, and kits therefor, comprised of facade panels, facade systems primarily comprised of profiles, pipes, tubes, gussets, rods, connectors used as supports; winter gardens, namely, conservatories as annex to buildings and pavilions, namely, in the form of transportable and immobile metal buildings for permanent and temporary use, especially in the form of gazebos; metal profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings; [ metal pipes, metal plates, namely, metal wainscots, metal sheathing, metal coverings, metal wall panels, and metal sheet plates; ] metal sheets, metal foils, metal window frames, metal doors, portals, namely, metal gates, metal shutters, metal wickets, and metal doorway barriers; [ cladding for construction and building of metal; ] cladding for windows, doors, facades, roofs, conservatories for building and construction of metal; metal glazing frames for supporting window panes; prefabricated metal components, namely, metal profiles, metal tubes, metal gussets and metal connectors, for doors, windows, building facades, canopies in the nature of metal gazebos and roofs; [ canopy and cantilever roofs consisting primarily of metal frames, metal awnings and metal profiles; ] closing and opening devices for windows and doors, namely, metal window shutters, metal window cranks, metal crank handles, and metal pulleys; metal post and rail systems, mainly consisting of metal profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings for installation between windows, doors, frameworks and buildings; metal facade panels and aluminum facades, all for building and construction | ACTIVE | — |
| 019 | Building materials not of metal, namely, non-metallic profiles, non-metallic pipes, non-metallic plates, non-metallic sheet plates, non-metallic foils, non-metallic windows, non-metallic portals, namely, non-metallic doors, non-metallic gates, non-metallic shutters, non-metallic wickets, and non-metallic doorway barriers; prefabricated and partly-prefabricated glass structures and frameworks consisting primarily of glass and not of metal, and kits therefor, comprised of facade panels, facade systems primarily comprised of profiles, pipes, tubes, gussets, rods, connectors used as supports, conservatories, namely, in the form of a winter garden as annex to buildings, and pavilions, namely, in the form of transportable and immobile non-metallic buildings for permanent and temporary use, especially in the form of gazebos; non-metal profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings; [ rigid non-metal pipes, plates, namely, non-metallic wainscots, non-metallic sheathing, non-metallic coverings, non-metallic wall panels, and non-metallic sheet plates, all for building and construction; ] sheets, foils, window frames, non-metallic doors, and portals for building and construction, namely, non-metallic gates, non-metallic shutters, non-metallic wickets, and non-metallic doorway barriers; cladding for construction and building not of metal, cladding for windows, doors, facades, roofs, and conservatories, all for building and construction; Insulating glass for windows for building purposes; glazing frames for supporting window panes; prefabricated non-metallic components, namely, non-metallic profiles, non-metallic tubes, non-metallic gussets and non-metallic connectors, for doors, windows, building facades, canopies in the form of portable gazebos not primarily of metal and non-metal roof coverings; [ canopy roofs and cantilever roofs, namely, non-metallic roof coverings; closing and opening devices for windows and doors, namely, non-metallic shutters; ] non-metallic post and rail systems, mainly consisting of non-metallic profiles for windows, doors, facades, roofs, conservatories, beams, frameworks and buildings for installation between windows, doors, frameworks and buildings; facade panels and timber facades, all for building and construction; all the aforesaid goods primarily of plastic, wood, glass, stone, or a combination of these materials | ACTIVE | — |
| 020 | [ Non-metallic opening and closing devices for windows and doors, namely, handles, latches, bolts, catches, and hardware, namely, keys, guards and claps ] | SECTION 71 - CANCELLED | — |
| 037 | [ Building construction, in particular erecting, assembling, mounting and repairing of facades and winter gardens; installation of facades and winter gardens ] | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Sep 5, 2024 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Mar 13, 2023 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Jan 23, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 23, 2022 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| May 23, 2022 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| May 12, 2022 | ES71 | TEAS SECTION 71 RECEIVED | — |
| May 15, 2021 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Mar 8, 2019 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 6, 2019 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 6, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jan 23, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Oct 5, 2018 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 23, 2018 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| May 23, 2018 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| May 22, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| May 15, 2018 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| May 15, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Nov 13, 2014 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Feb 17, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 30, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 30, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 24, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 15, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 15, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Feb 28, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Feb 28, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 8, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 8, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 8, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 20, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 20, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jan 3, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 29, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 29, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 29, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 6, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jul 16, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 15, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jul 15, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jul 14, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jul 13, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 12, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 12, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 11, 2011 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Jul 9, 2011 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |