Drawing for K2

USPTO serial 79099627

K2

Reviewed by CopyMark Law Group

Status 402
Filing date
Status date
Registration date
Examiner
TRIPI, CYNTHIA
Law office
TMO LAW OFFICE 118- EXAMINING ATTORNEY ASSIGNED

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with K2?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
004Industrial oils and greases; industrial lubricants; dust absorbing, wetting and binding compositions for use in the manufacture of photovoltaic modules; fuels and lighting fuels; electrical energy; candles and wicks for candles for lightingSECTION 70 - CANCELLED
006Common metals and their alloys; building materials of metal, namely, aluminium profiles for mounting solar panels, rotary metal structures for mounting solar panels, solar modules and roof constructions; fixing material of metal, namely, metal fasteners for mounting solar panels; materials of metal for scaffolds, metal racks, metal poles, stakes and masts of metal for mounting solar panels, metal building profiles and frames for construction purposes; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal not for electrical purposes; ironmongery, small items of metal hardware, namely, metal brackets, metal washers, and metal nuts for construction purposes; pipes and tubes of metal; metal safes; goods of common metal not included in other classes, namely, substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors and solar panel mounts; metal oresSECTION 70 - CANCELLED
009Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking, life-saving and teaching apparatus and instruments, namely, electronic device for monitoring and optimizing photovoltaic arrays, electronical sensors for measuring solar radiation; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, solar panels for production of electricity; solar cells; photovoltaic cells and modules; photovoltaic inverters; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members, photovoltaic solar modules, photovoltaic cladding panels, photovoltaic solar hybrid modules, photovoltaic thermal hybrid modules, photovoltaic thermal module; photovoltaic systems consisting of solar modules for power generation, inverters, electronic apparatus and instruments for controlling, regulating, accumulating and monitoring; solar panel systems consisting of solar modules, solar collectors and inverters for power generation; electronic apparatus and instruments for controlling, regulating, accumulating and monitoring of power generation; blank magnetic data carriers, data processing apparatus and computersSECTION 70 - CANCELLED
011Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating and water conduit purposes, namely, solar collectors, solar energy receivers, solar reactors, solar heat collection panels, and parabolic mirrors designed for the collection of solar energy; solar energy based cooling apparatus; solar water heaters; solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures, solar thermal installations, namely, solar thermal modules; solar collectors and solar modules for heat generation and systems consisting thereof; solar collectors and solar energy receivers for roof installations and open-air installationsSECTION 70 - CANCELLED
019Non-metal building materials for mounting solar panels; non-metal architectural mouldings, namely, building profile ledges; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; roofing, not of metal, incorporating solar cellsSECTION 70 - CANCELLED
035Advertising services; business management services; business administration; providing office functions; professional business and organizational planning of systems and plants for regenerative energy generation; professional business management and business organization consultancy for systems and plants for regenerative energy generation; business project management, in particular for systems and plants in the field of renewable energy; arranging of commercial contracts for others for the buying and selling of power suppliesSECTION 70 - CANCELLED
037Building construction; repair services, namely, repair services of individual components in the field of photovoltaic and solar thermal energy; installation services, namely, installation of photovoltaic and solar thermal energy equipment, and installation of solar energy systems and alternative energy products for residential and commercial use; construction, cleaning, repair and maintenance of systems and plants in the field of renewable energy; scaffolding erection, construction and repair; roofing servicesSECTION 70 - CANCELLED
039Transport of goods by air, bus, truck, marine and railway; packaging and storage of goods, namely, photovoltaic and solar thermal energy equipment; arranging of travel tours; transmission and transport, namely, distribution of electricity, thermal heat, gas or water; delivery of electricity, thermal heat, gas or water for supply to customers; delivery and distribution of energySECTION 70 - CANCELLED
040Treatment of materials for the production of energy, generation of energySECTION 70 - CANCELLED
042Scientific and technological services, namely, research, technology planning, development and design in the fields of solar energy and renewable energy; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; design and development of computer hardware and software; technological analysis and preparation of technical certificates for assessment of projects and project partners in the fields of solar energy and renewable energy; technological planning and design of projects and technological coordination of systems and plants in the field of renewable energy; quality management services, namely, quality testing of products for certification purposes; design, planning and engineering for third parties in the field of renewable energy; development services for third parties, namely, construction drafting and architectural consultancy in the field of renewable energy; engineering servicesSECTION 70 - CANCELLED

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Aug 8, 2021DENANOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED
Aug 7, 2021DETHDEATH OF INTERNATIONAL REGISTRATION
Oct 23, 2020CHLDCHANGE OF OWNER RECEIVED FROM IB
Jun 25, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED
May 14, 2020NREPNEW REPRESENTATIVE AT IB RECEIVED
Jul 8, 2016FINTFINAL DECISION TRANSACTION PROCESSED BY IB
Jun 20, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB
Jun 18, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB
Jun 18, 2015MAB2ABANDONMENT NOTICE MAILED - FAILURE TO RESPONDThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Jun 18, 2015ABN2ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSEThe trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time.
Mar 26, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB
Nov 12, 2014GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 12, 2014GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 12, 2014CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Oct 6, 2014RCCKSUSPENSION CHECKED - TO ATTORNEY FOR ACTION
Mar 31, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Sep 30, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Mar 25, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Jan 11, 2013OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB
Dec 26, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB
Dec 26, 2012OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB
Sep 10, 2012RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED
Sep 4, 2012ALIEASSIGNED TO LIE
May 11, 2012LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED
Apr 27, 2012LIMGLIMITATION OF GOODS RECEIVED FROM IB
Mar 1, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED
Mar 1, 2012GNSLLETTER OF SUSPENSION E-MAILED
Mar 1, 2012CNSLSUSPENSION LETTER WRITTEN
Feb 7, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED
Feb 7, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE
Feb 7, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Aug 27, 2011RFNTREFUSAL PROCESSED BY IB
Aug 9, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB
Aug 9, 2011RFRRREFUSAL PROCESSED BY MPU
Aug 9, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW
Aug 8, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Aug 2, 2011MAFRAPPLICATION FILING RECEIPT MAILED
Jul 27, 2011DOCKASSIGNED TO EXAMINER
Jul 27, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED
Jul 22, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB

Frequently asked questions

Related guidance