USPTO serial 79099627
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 004 | Industrial oils and greases; industrial lubricants; dust absorbing, wetting and binding compositions for use in the manufacture of photovoltaic modules; fuels and lighting fuels; electrical energy; candles and wicks for candles for lighting | SECTION 70 - CANCELLED | — |
| 006 | Common metals and their alloys; building materials of metal, namely, aluminium profiles for mounting solar panels, rotary metal structures for mounting solar panels, solar modules and roof constructions; fixing material of metal, namely, metal fasteners for mounting solar panels; materials of metal for scaffolds, metal racks, metal poles, stakes and masts of metal for mounting solar panels, metal building profiles and frames for construction purposes; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal not for electrical purposes; ironmongery, small items of metal hardware, namely, metal brackets, metal washers, and metal nuts for construction purposes; pipes and tubes of metal; metal safes; goods of common metal not included in other classes, namely, substrates primarily of metal for supporting solar cells, photovoltaic cells and solar collectors and solar panel mounts; metal ores | SECTION 70 - CANCELLED | — |
| 009 | Scientific, nautical, surveying, photographic, cinematographic, optical, weighing, measuring, signalling, checking, life-saving and teaching apparatus and instruments, namely, electronic device for monitoring and optimizing photovoltaic arrays, electronical sensors for measuring solar radiation; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, solar panels for production of electricity; solar cells; photovoltaic cells and modules; photovoltaic inverters; apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members, photovoltaic solar modules, photovoltaic cladding panels, photovoltaic solar hybrid modules, photovoltaic thermal hybrid modules, photovoltaic thermal module; photovoltaic systems consisting of solar modules for power generation, inverters, electronic apparatus and instruments for controlling, regulating, accumulating and monitoring; solar panel systems consisting of solar modules, solar collectors and inverters for power generation; electronic apparatus and instruments for controlling, regulating, accumulating and monitoring of power generation; blank magnetic data carriers, data processing apparatus and computers | SECTION 70 - CANCELLED | — |
| 011 | Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating and water conduit purposes, namely, solar collectors, solar energy receivers, solar reactors, solar heat collection panels, and parabolic mirrors designed for the collection of solar energy; solar energy based cooling apparatus; solar water heaters; solar light fixtures, namely, indoor and outdoor solar powered lighting units and fixtures, solar thermal installations, namely, solar thermal modules; solar collectors and solar modules for heat generation and systems consisting thereof; solar collectors and solar energy receivers for roof installations and open-air installations | SECTION 70 - CANCELLED | — |
| 019 | Non-metal building materials for mounting solar panels; non-metal architectural mouldings, namely, building profile ledges; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; roofing, not of metal, incorporating solar cells | SECTION 70 - CANCELLED | — |
| 035 | Advertising services; business management services; business administration; providing office functions; professional business and organizational planning of systems and plants for regenerative energy generation; professional business management and business organization consultancy for systems and plants for regenerative energy generation; business project management, in particular for systems and plants in the field of renewable energy; arranging of commercial contracts for others for the buying and selling of power supplies | SECTION 70 - CANCELLED | — |
| 037 | Building construction; repair services, namely, repair services of individual components in the field of photovoltaic and solar thermal energy; installation services, namely, installation of photovoltaic and solar thermal energy equipment, and installation of solar energy systems and alternative energy products for residential and commercial use; construction, cleaning, repair and maintenance of systems and plants in the field of renewable energy; scaffolding erection, construction and repair; roofing services | SECTION 70 - CANCELLED | — |
| 039 | Transport of goods by air, bus, truck, marine and railway; packaging and storage of goods, namely, photovoltaic and solar thermal energy equipment; arranging of travel tours; transmission and transport, namely, distribution of electricity, thermal heat, gas or water; delivery of electricity, thermal heat, gas or water for supply to customers; delivery and distribution of energy | SECTION 70 - CANCELLED | — |
| 040 | Treatment of materials for the production of energy, generation of energy | SECTION 70 - CANCELLED | — |
| 042 | Scientific and technological services, namely, research, technology planning, development and design in the fields of solar energy and renewable energy; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; design and development of computer hardware and software; technological analysis and preparation of technical certificates for assessment of projects and project partners in the fields of solar energy and renewable energy; technological planning and design of projects and technological coordination of systems and plants in the field of renewable energy; quality management services, namely, quality testing of products for certification purposes; design, planning and engineering for third parties in the field of renewable energy; development services for third parties, namely, construction drafting and architectural consultancy in the field of renewable energy; engineering services | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 8, 2021 | DENA | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Aug 7, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 23, 2020 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jun 25, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 14, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 8, 2016 | FINT | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 20, 2016 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 18, 2016 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 18, 2015 | MAB2 | ABANDONMENT NOTICE MAILED - FAILURE TO RESPOND | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Jun 18, 2015 | ABN2 | ABANDONMENT - FAILURE TO RESPOND OR LATE RESPONSE | The trademark application was abandoned because a required response or document was not filed by the deadline — usually a missed Office Action response. The application is dead unless a petition to revive is granted within a limited time. |
| Mar 26, 2015 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 12, 2014 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 12, 2014 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Nov 12, 2014 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 6, 2014 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Mar 31, 2014 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Sep 30, 2013 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Mar 25, 2013 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Jan 11, 2013 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Dec 26, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Dec 26, 2012 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 10, 2012 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Sep 4, 2012 | ALIE | ASSIGNED TO LIE | — |
| May 11, 2012 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Apr 27, 2012 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Mar 1, 2012 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Mar 1, 2012 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Mar 1, 2012 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Feb 7, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 7, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 7, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 27, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 9, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 9, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 9, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 8, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 2, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Jul 27, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Jul 27, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Jul 22, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |