USPTO serial 79100019
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nicholas D. Wells
Nicholas D. Wells Wells IP Law330 N. Main St.Kaysville, UT 84037UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal building materials, namely, soffits, fascia, ceiling boards and floor boards, metal trim for buildings, metal floor panels, wall panels of metal, composite panels composed primarily of metal; goods of common metal, in particular substructures for photovoltaic plants comprised of soffits, fascia, ceiling boards and floor boards, metal floor panels, wall panels of metal, composite panels composed primarily of metal, namely, aluminum and steel | SECTION 71 - CANCELLED | — |
| 009 | Apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical circuit boards, electrical power distribution units, circuit boards that act as fuses, cables, transformers; apparatus and instruments for electric power generating in the area of photovoltaic energy, namely, solar modules for power generation; inverters; control and communication systems comprised of irradiation and temperature sensors, computers, electronic data loggers, network routers | SECTION 71 - CANCELLED | — |
| 035 | Organizational preparation of building projects by providing organizational services for business purposes in the field of photovoltaic building projects | SECTION 71 - CANCELLED | — |
| 036 | Financial preparation of building projects in the photovoltaic field through the transfer of financing and loan services, provision of financing, and bridge financing of photovoltaic projects | SECTION 71 - CANCELLED | — |
| 037 | Execution of building projects, namely, installation, operation, and maintenance and repair services for buildings and industrial facilities in the field of photovoltaic apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, apparatus and instruments for electric power generating in the area of photovoltaic, in particular solar modules for power generation, inverter, control and communication systems | SECTION 71 - CANCELLED | — |
| 039 | Transportation and delivery services, namely, transportation, delivery, distribution of products and materials of others in the photovoltaic field | SECTION 71 - CANCELLED | — |
| 042 | Technical preparations of building projects in the photovoltaic field, namely, engineering services, technical project planning and design engineering of photovoltaic power plants, technical consultancy in the field of operating photovoltaic power plants, coordination of electrical grid connections between photovoltaic power plants and an electrical network operator | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 21, 2022 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 20, 2021 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 20, 2021 | INPC | INVALIDATION PROCESSED | — |
| Nov 22, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Nov 22, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 26, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Feb 26, 2021 | C71T | CANCELLED SECTION 71 | — |
| Oct 22, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Jan 11, 2016 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Feb 18, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jan 27, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jan 27, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 22, 2014 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 22, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 29, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 6, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 6, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 17, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 17, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 17, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 28, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 27, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 27, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 27, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 27, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 27, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 27, 2013 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 27, 2013 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 27, 2013 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 5, 2013 | RCCK | SUSPENSION CHECKED - TO ATTORNEY FOR ACTION | — |
| Jan 26, 2013 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Jan 9, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 9, 2013 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 3, 2012 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| May 29, 2012 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| May 29, 2012 | ALIE | ASSIGNED TO LIE | — |
| Feb 24, 2012 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Nov 28, 2011 | GNS3 | NOTIFICATION OF LETTER OF SUSPENSION E-MAILED | — |
| Nov 28, 2011 | GNSL | LETTER OF SUSPENSION E-MAILED | — |
| Nov 28, 2011 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Nov 4, 2011 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 4, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 4, 2011 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Aug 27, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 11, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 8, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 8, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 8, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 7, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 7, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 7, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 4, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |