USPTO serial 79100690
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Miriam D. Trudell
Miriam D. Trudell Davis Graham & Stubbs LLP3400 Walnut Street, Suite 700Denver, CO 80205United States| Class | Description | Status | First use |
|---|---|---|---|
| 004 | [ Industrial oils and greases; industrial lubricants, dust absorbing, wetting and binding compositions for use in the manufacture of photovoltaic modules; fuels; gasoline; lighting fuels; electrical energy; candles and wicks for candles for lighting ] | SECTION 71 - CANCELLED | — |
| 006 | [ Common metals and their alloys; building materials of metal, namely, roof hooks, screws, rails and clamps; aluminium profiles; rotatable metal structures for mounting solar panels and solar modules; fixing material of metal, namely, metal fasteners for mounting solar panels; materials of metal for scaffolds; metal racks; metal poles; metal stakes for mounting solar panels; masts of metal; metal building profiles and frames; transportable buildings of metal; materials of metal for railway tracks; non-electric cables and wires of common metal; ironmongery and small items of metal hardware, namely, metal brackets, metal washers, and metal nuts for construction purposes; pipes and tubes of metal; metal safes; goods of common metal, namely, solar panel mounts of common metal; metal ores ] | SECTION 71 - CANCELLED | — |
| 009 | [ Scientific, ] [nautical, surveying, photographic, cinematographic, optical, weighing, ] [ measuring, signalling, checking, ] [ life-saving and teaching apparatus and instruments, namely, optical mirrors, ] [ conductivity meters, clamp meters for measuring electricity, electronic device for monitoring and optimizing photovoltaic arrays, electronic sensors for measuring solar radiation; apparatus and instruments for conducting, switching, transforming, accumulating, regulating or controlling electricity, namely, electrical conductors, electrical switches, electric voltage transformers, electric accumulators, voltage regulators for electric power, electrical controllers, solar panels for production of electricity, solar cells, photovoltaic cells and modules, photovoltaic inverters, and apparatus for converting electronic radiation to electrical energy, namely, photovoltaic roofing members, photovoltaic solar modules, photovoltaic cladding panels, ] [ photovoltaic solar hybrid modules, photovoltaic thermal hybrid modules, and photovoltaic thermal modules; ] [ photovoltaic systems that convert sunlight into electric energy, namely, systems comprised of solar modules for power generation, inverters and electronic apparatus and instruments for controlling, regulating, accumulating and monitoring electric current and electrical signals; solar panel systems for production of electricity, comprised primarily of photovoltaic solar modules, solar collectors and photovoltaic inverters all sold as a unit; electronic apparatus and instruments for controlling, regulating, accumulating and monitoring electric current and electrical signals; blank magnetic data carriers; data processing apparatus and computers ] | SECTION 71 - CANCELLED | — |
| 011 | [ Apparatus for lighting, heating, steam generating, cooking, refrigerating, drying, ventilating and water conduit purposes, namely, solar water heaters, solar collectors for heating, solar-powered all-weather lights; solar collectors and solar thermal modules for heating purposes; heating systems for residential and commercial buildings comprised primarily of solar collectors and solar thermal modules; solar thermal installations, namely, solar thermal modules for installation on roofs; solar thermal air systems for heating purposes ] | SECTION 71 - CANCELLED | — |
| 019 | [ Non-metal building materials, namely, for mounting solar panels; non-metal profiled ledges in the nature of decorative moldings and decorative trim for use in building construction; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; non-metallic roofs incorporating solar cells ] | SECTION 71 - CANCELLED | — |
| 035 | [ Advertising; business management; business administration; office functions; ] [ business planning and business organizational planning in the field of operation of systems and plants for regenerative energy generation; business organization and operation consultancy in the field of operation of systems and plants for regenerative energy generation; ] Project management services for others for business purposes in the field of operation of systems [ and plants ] in the field of renewable energy; arranging of contracts for others for the buying and selling of power supplies | ACTIVE | — |
| 037 | [ Building construction; repair of individual components of photovoltaic electric energy installations and solar thermal energy installations; ] installation [, ] * and * construction [, cleaning, repair and maintenance ] of renewable energy generation systems [ and of renewable energy power plants; installation services in the nature of scaffolding erection; roofing services ] | ACTIVE | — |
| 039 | [ Transport of goods by ferry, boat, truck, rail and air; packaging, namely, packaging articles for transportation; storage of goods [; arranging of travel tours; distribution and transmission of electricity; thermal heat, gas and water supplying; transportation of liquefied petroleum gas; transmission of gas through pipelines; delivery and distribution of energy] ] | SECTION 71 - CANCELLED | — |
| 040 | [ Treatment of materials for the production of energy, namely, treatment of crystalline materials, namely, semi-precious stones, articles of stone, metals and glass materials; generation of energy ] | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, [ research, ] technology planning, development and design in the fields of solar energy [ and renewable energy; industrial analysis and research services, namely, industrial research in the fields of solar energy and renewable energy; design and development of computer hardware and software; technological services, namely, technological analysis relating to assessment of engineering projects and engineering project partners in the field of renewable energy; technical writing for others in the field of assessment of engineering projects and engineering project partners in the field of renewable energy; ] technological planning in the field of systems [ and plants ] for generation of renewable energy; design and engineering of systems [ and plants ] for generation of renewable energy; [ quality testing of products of others for the purpose of certification; ] engineering services in the field of renewable energy; design and development services for others in the field of renewable energy products; [ technological planning in the field of renewable energy resources; ] engineering | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 18, 2024 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Nov 18, 2024 | ECDR | TEAS CHANGE OF DOMESTIC REPRESENTATIVES ADDRESS | — |
| Nov 18, 2024 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 18, 2024 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Oct 26, 2024 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 2, 2024 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 2, 2024 | INPC | INVALIDATION PROCESSED | — |
| Jul 13, 2024 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Nov 12, 2023 | PRAN | POST REGISTRATION ACTION MAILED NO RESPONSE REQUIRED | — |
| Aug 1, 2023 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| Jul 19, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jul 19, 2023 | 71.P | REGISTERED - PARTIAL SEC 71 ACCEPTED | — |
| Jul 18, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jan 5, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jul 10, 2021 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jun 18, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Feb 4, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Jun 25, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 14, 2020 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 4, 2019 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Jun 10, 2019 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jun 10, 2019 | INPC | INVALIDATION PROCESSED | — |
| May 19, 2019 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Sep 19, 2018 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Sep 19, 2018 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Jul 9, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 11, 2018 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jul 10, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 8, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Mar 20, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Mar 20, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 2, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 10, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 10, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 24, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Apr 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 4, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 4, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Mar 19, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 16, 2012 | ALIE | ASSIGNED TO LIE | — |
| Feb 29, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 29, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Feb 29, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Feb 29, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Feb 29, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 25, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 24, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 24, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 18, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Aug 26, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Aug 26, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Aug 26, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Aug 25, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 23, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 19, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 19, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 18, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |