USPTO serial 79100977
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Jessica Garrett Kraver
Jessica Garrett Kraver KATTEN MUCHIN ROSENMAN LLP50 Rockefeller PlazaNew York, NY, 10020UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Metal bearings for construction, namely, pot, elastomeric, spherical, linear rocker, incremental launch, horizontal force, stroke-measuring, earthquake and guide bearings, metal support seismic isolation bearings used in construction for protection of structures against damage by nature and other causes, structural parts and members for all such bearings, namely, metal shock absorbers, metal shock transmission units, preloaded metal spring and spring disc dampers, lead rubber bearings and pendulum isolators for application in bridges or other types of edifices, primarily made of metal; expansion joint structures for construction, namely, single gap joints, modular expansion joints, cantilever and sliding finger joints, mat joints and railway expansion joints for installation into asphalt, concrete, plastic and steel for application in bridges or other types of edifices, primarily made of metal; structural component and replacement parts of such bearings and expansion, namely, sealing alloys, metal elastomeric pads, metal bearing pots, metal bearing shells, metal sliding plates, metal anchors, metal profiles, bars and cover plates | ACTIVE | — |
| 009 | Surveying, measuring, signalling, checking and monitoring apparatus and instruments, namely, force sensors, strain and tilt sensors, movement sensors, acceleration sensors, vibration sensors, structural temperature sensors and GPS position monitoring and meteorological surveillance instruments; devices and apparatus for monitoring, remote monitoring of physical entities and conditions of bearings, expansion joints, other construction elements and building structures, namely, force sensors, strain and tilt sensors, movement sensors, acceleration sensors, vibration sensors, structural temperature sensors and GPS position monitoring and meteorological surveillance instruments | ACTIVE | — |
| 019 | Bearings for construction not of metal, namely, slide bearings for accommodating relative movement of buildings and bridges, non-metal anti-vibration bearing mountings for construction for application in bridges or other types of edifices, primarily made of non-metallic material; Non-metal expansion joints for floors and walls for construction, namely, for application in bridges or other types of edifices, primarily made of non-metallic material | ACTIVE | — |
| 037 | Building construction work; repair and maintenance services of bridges and buildings | ACTIVE | — |
| 042 | Civil engineering services; technological services, namely, structural engineering services, structural inspection services, planning of infrastructure systems relating to construction of bridges, other edifices and other building structures; consultancy services in the field of bridge technology; engineering design of structural parts of bridges and other edifices | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Nov 9, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Nov 9, 2023 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Nov 7, 2023 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Mar 23, 2023 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Mar 18, 2022 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Sep 25, 2021 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jul 16, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Sep 29, 2018 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Sep 29, 2018 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Sep 27, 2018 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Sep 24, 2018 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Sep 21, 2018 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 21, 2018 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Sep 14, 2018 | WOAG | WITHDRAWAL OF ATTORNEY GRANTED | — |
| Sep 14, 2018 | WOAR | TEAS WITHDRAWAL OF ATTORNEY RECEIVED | — |
| Sep 25, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 4, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jan 14, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Dec 26, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Dec 26, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Dec 25, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Sep 25, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 22, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 10, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 10, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 20, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jun 20, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jun 20, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 2, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| May 31, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| May 31, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| May 31, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| May 31, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| May 31, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| May 24, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 24, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| May 24, 2012 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 22, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Mar 22, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 22, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Mar 1, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 1, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 1, 2012 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| Feb 9, 2012 | ALIE | ASSIGNED TO LIE | — |
| Feb 2, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Oct 9, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 20, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 20, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 19, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 18, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 17, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 30, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 26, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 25, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |