USPTO serial 79101002
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Robert N. Cook
Robert N. Cook Whitham & Cook, P.C.11491 Sunset Hills RoadSuite 340Reston, VA 20190| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Common metals and their alloys including stainless steel; Common metals, unwrought and semi-worked, for further manufacture; Metal building materials, namely, metal elbow pipes, metal t-shaped pipes, metal y-shaped pipes, metal corrugated pipes, metal shell rings, semi-elliptical heads and extrusions made of metal, metal cladding for construction and building, and metal components, namely, reducers and pipe supports; Transportable buildings of metal; Materials of metal for railway construction; Non-electric cables and wires of common metal; Ironmongery in the nature of small items of metal hardware, namely, nails, screws, washers, springs, pulleys, brackets, hooks, nuts, and bolts; Pipes and tubes of metal, namely, corrugated pipes, bent tubes, and T-fittings; Metal pipe connectors and supports; Metal storage tanks and roofs therefor; Metal roofing; General purpose metal storage containers; Metal jalousies; Metal plates, namely, corrosion-resistant metal overlays and alloys for fittings, steel plates, flanges, and piping components; Metal posts; parts and fittings for the foregoing goods | SECTION 71 - CANCELLED | — |
| 011 | Heating installations; Heating units for industrial purposes; Steam generators; Steam generating installations; Refrigerators; Refrigerating machines and installations; Drying apparatus for use in heating, ventilation systems, air conditioning systems, and refrigeration systems; Air-conditioning, air cooling, and ventilation apparatus and instruments; Water heaters; Water purification installations; Water softening apparatus and installations; Water filtering apparatus; Heat exchangers not being parts of machines, namely, plate heat exchangers; Heat pumps; Heat generators; Heat accumulators; parts and fittings for the foregoing goods | SECTION 71 - CANCELLED | — |
| 037 | Building construction; Installation of pipelines and pipeline components; Installation of heating, ventilating, and air conditioning equipment; Maintenance and repair of milling machines, drilling machines, and welding machines; Rental of construction machines, namely, milling machines, drilling machines, and welding machines; Maintenance, cleaning, and repair of heating and boiler installations, namely, steam boilers; Installation, maintenance, and repair of pipelines, pipes and parts of pipes, namely, for industrial plants, chemical and petrochemical plants, power plants, shipbuilding, in heating installations, and in compressor stations | SECTION 71 - CANCELLED | — |
| 040 | Treatment of materials, namely, welding, hardening, plating, and coating of pipes; Metal processing and refinement, namely, surface treatment in the nature of metal treatment; Metal casting; Rental of machines for use in metalworking and manufacturing, namely, milling machines, drilling machines, and welding machines | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services, namely, research and design in the field of metal processing; Industrial research and analysis in the field of metal machining; Construction drafting; Technical consulting concerning the design of pipes and pipe systems, for milling, drilling, and welding works, for tool and mold engineering, in mechanical engineering, and in vehicle and aircraft engineering; Surveying in the field of metal machining | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 21, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Aug 21, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Feb 13, 2021 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Jan 12, 2021 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Jan 12, 2021 | INPC | INVALIDATION PROCESSED | — |
| Jan 5, 2021 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jun 4, 2020 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 6, 2020 | NC71 | NOTICE OF CANCELLATION SEC. 71 E-MAILED | — |
| May 5, 2020 | C71T | CANCELLED SECTION 71 | — |
| Oct 23, 2019 | PR75 | POST REGISTRATION ACTION MAILED - SEC. 71 & 15 | — |
| Apr 24, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Apr 5, 2019 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Oct 9, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 18, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 18, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| May 30, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| May 30, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 9, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 9, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Aug 29, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jul 24, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jul 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 4, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 4, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jun 20, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 14, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 14, 2012 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jun 14, 2012 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jun 14, 2012 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jun 14, 2012 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Jun 6, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 6, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 6, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Feb 20, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 20, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 20, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Feb 9, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 9, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 30, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jan 18, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jan 18, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 18, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 24, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 7, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 7, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 7, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 6, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Aug 30, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Aug 26, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Aug 26, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Aug 25, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |