USPTO serial 79101246
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Nicole L. Linehan
Nicole L. Linehan Schneider Electric - IP Legal800 Federal StreetLegal Department (2C-PR013)Andover, MA 01810| Class | Description | Status | First use |
|---|---|---|---|
| 007 | [ Electric motors and engines other than for land vehicles; speed regulators being parts of electric motors, engines, and pumps; pumps as parts of machines or engines; valves as machine parts ] | SECTION 71 - CANCELLED | — |
| 009 | [ Scientific, electric and electronic apparatus and instruments for transporting, conducting, distributing, transforming, storing, regulating, filtering, measuring, signaling, monitoring or controlling electric current, including electric or electronic components for such apparatus and instruments, namely, electric capacitors, harmonic filters for reducing harmonic distortion in electrical appliances, harmonic capacitors for reducing harmonic distortion in electrical appliances, electrical inductors, circuit breakers, electrical circuit breakers, switch disconnectors, distribution boxes and panels, electric transformers, electric relays, voltage surge suppressors, photovoltaic solar cells, photovoltaic solar modules, photovoltaic converters, electric regulators for controlling and regulating photovoltaic and solar installations, and apparatus for monitoring electrical energy consumption, namely, monitors for monitoring electrical energy consumption and indicators of electrical energy consumption; apparatus and instruments for the analysis, protection, inspection, measurement, signaling, regulation, setting, monitoring, maintaining, supervision, design, management, control and remote control systems for lighting, heating, cooling, humidifying, ventilating, air-conditioning, energy consumption, fire safety, access control, energy management, namely, electric wires, electric cables, electrical ducts, electricity conduits, sheaths for electric cables, electric conductors, electrical connectors, electrical components in the nature of electrical contactors, electric couplings, electrical connection boxes, power distribution boxes, electrical distribution boxes, junction boxes, rectifiers, inverters, voltage regulators, electric converters, semiconductors, semiconductor devices, electric relays, cut-out switches, electric switches, electric and electronic indicator panels, electric power loss indicator panels, electric power converters, electric resistance, transformers, electrical plugs, electric sockets and electric contacts, electrical circuit boards, electric control panels, electric distribution consoles and electrical distribution boxes, electrical power supplies, magnetic coded cards, namely, magnetic cards for building access control, magnetic cards for radio-frequency identification credentials, and magnetically encoded pre-paid debit cards; electrical heating, ventilating and air conditioning controllers; electrical lighting controllers, electrical valves for controlling gas or fluids, electrical valve actuators; electrical water, heat and electricity meters; pressure switches for monitoring, controlling, and switching hydraulic or pneumatic systems; pressure transducers, electrical thermometers, electrical water flow switches, remote controls for electrical devices and programmable logic controllers, electric motor speed control apparatus, push-button electrical switches, indicator lights for electrical monitors for monitoring electric current and electrical signals; programmable electrical controllers, programmable power controllers for reducing power consumption, programmable power controllers for monitoring and control of home and office power consumption, programmable logic modules in the nature of electrical controllers, and programmable logic controllers; electronic communication cables and wires, electronic receivers for electronic signals for monitoring and controlling automated installations; electric light dimmers; timers; electrical sensors and monitors in the nature of motion detectors, smoke detectors, gas detectors, heat detectors, charger fault detectors, thermostats, fire sensors, air flow sensors, air quality sensors, humidity sensors, light sensors, pressure sensors, wet media pressure sensors, temperature sensors, and air velocity sensors; electrical outlets; computer hardware, computer software for the analysis, protection, inspection, measurement, signaling, regulation, setting, monitoring, maintaining, supervision, design, management, control and remote control of systems for lighting, heating, cooling, humidifying, ventilating, air-conditioning, energy consumption, fire safety, access control, and energy management; electrical terminals and stations for the electrical powering and recharging of electric vehicles and electric cells; electrical plugs, electrical plug sockets and cords for recharging electric vehicles and rechargeable electric cells ] | SECTION 71 - CANCELLED | — |
| 011 | [ Apparatus and installations for lighting, heating, cooling, humidifying, ventilating and air-conditioning buildings, namely, heat accumulators, air conditioning installations, air filtering installations, air cooling installations, electric lamps, ventilation installations, heating installations ] | SECTION 71 - CANCELLED | — |
| 037 | Construction, installation, maintenance and repair of electrical and automatic control installations and equipment, [ photovoltaic installations and electrical recharging installations for electric vehicles and electric cells; ] installation and maintenance of home automation installations and programmable automatic units installations for the technical management of buildings; installation, maintenance and repair of lighting, heating, cooling, humidifying, ventilating and air-conditioning apparatus and installations of buildings | ACTIVE | — |
| 042 | Consulting services in the field of energy measurement to improve energy efficiency; technological planning services in the field of energy management and building management; auditing in connection with saving energy and electrical energy management; on-site or remote monitoring and control services of energy consumption, namely, monitoring and controlling energy consumption by third parties for individuals and enterprises; evaluation, estimation and simulation services of energy consumption, namely, evaluating, estimating and simulating energy consumption by third parties for individuals and enterprises; computer programming, software development and database design in connection with electrical energy management and building management | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Aug 11, 2023 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Aug 11, 2023 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Aug 11, 2023 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 6, 2022 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Aug 19, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Dec 25, 2020 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 3, 2020 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 3, 2020 | INPC | INVALIDATION PROCESSED | — |
| Nov 30, 2020 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 31, 2020 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Mar 31, 2020 | C75P | REGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Mar 30, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 5, 2020 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Aug 6, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 3, 2014 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Feb 26, 2014 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Feb 26, 2014 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 6, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 6, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 20, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 21, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 21, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| May 1, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 1, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 1, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 17, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 17, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 16, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 15, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 15, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Feb 24, 2013 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 6, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 6, 2013 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Dec 20, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Dec 20, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Dec 20, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 29, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Nov 29, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Nov 19, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 24, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 24, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 3, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| May 3, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 23, 2012 | ALIE | ASSIGNED TO LIE | — |
| Apr 17, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Apr 17, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 5, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 20, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 20, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 20, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 19, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 18, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 6, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 2, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 1, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |