USPTO serial 79101310
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
22587 Hamburg, DE
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Charles T.J. Weigell
CHARLES T.J. WEIGELL FROSS ZELNICK LEHRMAN & ZISSU, P.C.866 UNITED NATIONS PLZNEW YORK, NY 10017-1822UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 006 | Masts and towers of metal for wind power plants; building materials of metal for constructing of machine foundations of wind power plants | SECTION 70 - CANCELLED | — |
| 007 | Wind-powered machines, namely, wind powered electricity generators and machines for generating electrical and mechanical energy; turbines, in particular wind turbines; parts and accessories for such wind-powered machines, in particular, rotor blades, rotor consoles, blade hubs, machine housings, yaw rings, yaw gears, brakes, main drive shafts, universal joints, gears, gear boxes, couplings, motors, mechanical rotor adjusters, electric generators and emergency power supplies | SECTION 70 - CANCELLED | — |
| 009 | Switch cabinets for recording, processing, storage and transmission of data from wind power plants and wind farms; switch cabinets in the nature of electric installation material comprising electrical and electronic control apparatus and instruments for wind power plants and wind farms; electrical and electronic voltage and current regulators for wind power plants and wind farms; electrical and electronic regulating, checking supervision, control and monitoring apparatus and instruments for wind power plants and wind farms; data processing equipment, computer and computer operating software; computer interfaces and computer interface programs; voltage surge protectors; vibration sensors for installation in wind power plants and wind farms; watt-hour meters; inverter units, namely, electric converters; electric transformers for wind power plants and wind farms | SECTION 70 - CANCELLED | — |
| 016 | Printed matter, in particular magazines, customer magazines, brochures, test reports and inspection reports, in particular, survey reports, in the field of wind power generation; printed certificates in the field of wind power generation; printed calibration certificates | SECTION 70 - CANCELLED | — |
| 035 | Professional business consultancy with regard to wind power plants and wind farms | SECTION 70 - CANCELLED | — |
| 037 | Building construction in the field of wind power plants; installation services, namely, installation of towers, turbines, electrical and computer systems for wind power plants and farms; maintenance and rebuilding machines that have been worn or partially destroyed; care and repair of wind power plants; assembly of rotor blades for others as part of installation of equipment for wind power plants and wind farms | SECTION 70 - CANCELLED | — |
| 039 | Transport of goods; packaging and storage of goods | SECTION 70 - CANCELLED | — |
| 041 | Training, personnel development through basis and advanced training, arranging and conducting of seminars and schooling events relating to wind power plants and in the field of wind power generation; arranging and conducting of seminars and workshops concerning new developments, procedures and findings in the field of wind power production | SECTION 70 - CANCELLED | — |
| 042 | Remote maintenance, remote control and remote monitoring of wind power plants and wind farms through computerized retrieval of data via the Internet; conducting technical measurements, inspections and calculations in the field of wind power plants and wind farms; electronic data storage; surveying within the scope of data analysis in the field of wind power plants and wind farms; design and development of computer software in the field of wind power plants and wind farms; technical consultancy, technical planning and technical development services as well as technical project management in matters of wind power plants projects; engineering services for calculation, dimensioning and design of rotor blades; technical research in the field of wind power plants and wind farms; providing technical information concerning energy production in matters of wind power plants and wind farm; monitoring of rotor blades | SECTION 70 - CANCELLED | — |
| 045 | Management of intellectual property rights and copyrights, exploitation of intellectual property rights and copyrights through licensing of intellectual property rights and copyrights, as well as licensing on database rights and merchandising rights; exploitation of license rights and other usage rights through awarding of licenses | SECTION 70 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 13, 2014 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Sep 27, 2013 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Mar 27, 2013 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Feb 24, 2013 | OPNX | NOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB | — |
| Feb 6, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 6, 2013 | OPNR | NOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB | — |
| Sep 26, 2012 | RCSC | REPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED | — |
| Sep 26, 2012 | ALIE | ASSIGNED TO LIE | — |
| Mar 29, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Mar 29, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 21, 2012 | CNSL | LETTER OF SUSPENSION MAILED | — |
| Mar 20, 2012 | CNSL | SUSPENSION LETTER WRITTEN | — |
| Mar 8, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Mar 7, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Mar 7, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Sep 24, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Sep 8, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Sep 8, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Sep 8, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Sep 7, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Sep 6, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 2, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 2, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 1, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |