Drawing for LACTEC

USPTO serial 79101794

LACTEC

Reviewed by CopyMark Law Group

Reg. 4355847Status 404
Filing date
Status date
Registration date
Jun 25, 2013
Examiner
HINES, REGINA C
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with LACTEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
002Varnish and diluents for varnish; dyes, namely, industrial paints and paint additives for dyes; dyestuffs for use with electrostatic paint spray machinesSECTION 71 - CANCELLED—
007Paint coating machines; pumps for machines, namely, pumps for transporting, supplying and dosing liquid paints; pumps for machines, namely, gear pumps, mattering pumps piston pumps and squeeze pumps; machine parts, namely, coating pressure controllers; power operated industrial atomizers; pneumatic controllers for machines and motors; hydraulic steerage units for machines and motors; paint color changing machines; Paint application machines, namely, paint atomizers, high speed rotating atomizers, air atomizing guns, hydraulic atomizing guns, painting robots, reciprocators, paint valves, color change modules; paint pigging processors, namely, senders, receivers and fittings for pigs/scrapers for transporting paint in tubes and hoses and controls therefor; electric and electronic control panels for use with paint machines; powder coating machines; paint removing machines; electrostatic spinning machines for spinning fibers or yarnSECTION 71 - CANCELLED—
009Automatic controllers for machines; electric installations for the remote control of industrial operations; high voltage generators for electrostatic painting plants; electrostatic coating machinesSECTION 71 - CANCELLED—
037Maintenance and repair of painting plants, powder coating plants, paint removal plants and electrostatic spinning plantsSECTION 71 - CANCELLED—
042Construction planning; services of an industrial designer, namely, industrial design and engineering services, design and engineering of process concept and layouts, processing and maintenance work; engineering services, particularly technical project planning of painting plants, powder coating plants and paint removal plantsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Nov 14, 2021DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG MAILED—
Nov 14, 2021DETHDEATH OF INTERNATIONAL REGISTRATION—
Nov 13, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Oct 21, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
Oct 21, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Sep 30, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 31, 2020C71TCANCELLED SECTION 71—
Mar 22, 2019NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 12, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Sep 26, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Sep 26, 2013FIMPFINAL DISPOSITION PROCESSED—
Sep 25, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Jun 25, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jun 2, 2013GPNXNOTIFICATION PROCESSED BY IB—
Apr 9, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Mar 20, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Mar 20, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Mar 20, 2013NPUBNOTICE OF PUBLICATION—
Mar 5, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Feb 28, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Feb 28, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Feb 28, 2013CNEAEXAMINERS AMENDMENT MAILED—
Feb 27, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Feb 4, 2013ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Jan 12, 2013PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Dec 31, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Dec 30, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Dec 30, 2012ATRVATTORNEY REVIEW COMPLETED—
Nov 15, 2012CREVCORRECTION FROM IB ENTERED - ATTORNEY REVIEW REQUIRED—
Nov 14, 2012CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Nov 3, 2012ACECAMENDMENT FROM APPLICANT ENTERED—
Nov 3, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 22, 2012MAILPAPER RECEIVED—
Oct 12, 2012FAXXFAX RECEIVED—
May 2, 2012CNRTNON-FINAL ACTION MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 2, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 5, 2012ACECAMENDMENT FROM APPLICANT ENTERED—
Apr 5, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 29, 2012ALIEASSIGNED TO LIE—
Mar 20, 2012MAILPAPER RECEIVED—
Mar 13, 2012FAXXFAX RECEIVED—
Oct 9, 2011RFNPREFUSAL PROCESSED BY IB—
Sep 20, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Sep 20, 2011RFRRREFUSAL PROCESSED BY MPU—
Sep 20, 2011MAFRAPPLICATION FILING RECEIPT MAILED—
Sep 17, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Sep 16, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Sep 16, 2011DOCKASSIGNED TO EXAMINER—
Sep 16, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Sep 15, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance