USPTO serial 79102192
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
| Class | Description | Status | First use |
|---|---|---|---|
| 017 | Non-metal fittings for flexible pipes, namely, pipe sockets and pipe connectors not of metal for use in heating, refrigeration and ventilation installations, heating engineering, domestic and plumbing engineering, process engineering, the chemical and petrochemical industries, the steel, metallurgical and glass industries, the mining industries, the power station industry, conventional power stations and nuclear power stations, the food processing industry, prime movers and processing machines, land vehicles and for use in ships as covered by this class; non-metal welding collars; non-metal flanges; non-metal flexible pipes, non-metal flexible pipelines and non-metal moldable jointing components for use in heating, refrigeration and ventilation installations, heating engineering, domestic and plumbing engineering, in particular for gas, air, vapour and liquids, process engineering, the chemical and petrochemical industries, the steel, metallurgical and glass industries, the mining industries, the power station industry, conventional power stations and nuclear power stations, the food processing industry, for prime movers and processing machines, for land vehicles and for use in ships as covered by this class | SECTION 71 - CANCELLED | — |
| 019 | Non-metal rigid drain pipes; rigid branch pipes, not of metal; non-metal rigid pressure pipes for use as components; rigid pipes for construction work, not of metal; building materials entirely or predominantly made of non-metallic materials, namely, fittings and mouldings, in particular connection, transition, reduction and closure pieces for pipes; parts of all the aforementioned goods, namely, non-metal pipe fittings | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Jan 31, 2025 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Sep 30, 2022 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 30, 2022 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Nov 29, 2019 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Aug 8, 2019 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Aug 8, 2019 | INPC | INVALIDATION PROCESSED | — |
| Jul 16, 2019 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jul 11, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Nov 16, 2018 | C71T | CANCELLED SECTION 71 | — |
| Jul 31, 2014 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Oct 30, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Oct 24, 2012 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Sep 28, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Sep 28, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jul 10, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Apr 10, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jan 24, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jan 6, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jan 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jan 4, 2012 | NPUB | NOTICE OF PUBLICATION | — |
| Dec 21, 2011 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Dec 19, 2011 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Dec 19, 2011 | CNEA | EXAMINERS AMENDMENT MAILED | — |
| Dec 16, 2011 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Dec 16, 2011 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 15, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Dec 15, 2011 | ACEC | AMENDMENT FROM APPLICANT ENTERED | — |
| Dec 15, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 13, 2011 | ALIE | ASSIGNED TO LIE | — |
| Dec 6, 2011 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 6, 2011 | PAPER RECEIVED | — | |
| Nov 28, 2011 | FAXX | FAX RECEIVED | — |
| Nov 19, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 27, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 27, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 27, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 26, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 19, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Sep 27, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Sep 23, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Sep 22, 2011 | SDRC | SN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB | — |