USPTO serial 79102890
Reviewed by CopyMark Law Group
This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
James Schroeder
James Schroeder Schroeder Intellectual Property Law Group, LLC155 N. Pfingsten Rd., Suite 380Deerfield, IL 60015UNITED STATES| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Installations for cleaning waste air, in particular adsorption installations and condensation installations; machines and installations assembled therefrom for materials-handling technology, in particular circular conveyors, power-and-free conveyors,[ electric telpher railways, electric pallet tracks,] driver-less transport systems, pallet-conveying systems, belt and plate transport systems, roller track systems, under-floor conveyors, cross-bar conveyors, multiple-strand chain conveyors, towing, carrying and accumulating chain conveyors, vertical transport conveyors, motor-driven raising, lowering and tilting devices[, motor-driven devices for feeding and dispensing workpieces,] sorting installations for packages and packs, warehouse pre-zone conveyors,[ assembly and testing belts, assembly bench circular conveyors; gantry robots as machines;] automatic handling systems; [machines for piece-goods; distributing, sorting and order-picking machines; ]installations and motor-driven devices for warehousing technology, namely, motor-driven storage and retrieval machines; [enameling installations, consisting of pre-treatment installations, coating installations and conveyors; ]lifting beam stores as machine parts; machines and installations assembled therefrom for the surface treatment and surface-coating of metals, in articular run-through and timed-cycle washing machines, powder coating installations,[ electrode position painting installations,] spraying and dipping installations for conventional paints and aqueous paints, spray stands,[ splash-boards,] spray booths,[ whirl-sintering installations, electron beam hardening installations; ] installations for pre-treating areas prior to coating, in particular for flat and rolled metal sheets; complete painting lines, consisting of pre-treatment installations and coating installations and conveyors;[ machines and installations assembled therefrom for the surface-coating of tubes made of different materials; machines and installations assembled therefrom for coating electrical components with casting resin; coating and laminating machines;] paint-stripping installations, essentially consisting of chemical paint-stripping basins and high-pressure paint-stripping machines; machines and installations assembled therefrom for painting wooden and plastic parts; motor-driven handling appliances and robots for loading and unloading firing supports; oil/water separating installations; installations for separating solvents from water, installations for aqueous paint recycling in the form of filtration and mechanical recuperation via special overspray-collecting systems[; installations for printing ink recycling in the form of filtration] | ACTIVE | — |
| 011 | [Drying installations for sawn timber;] Installations for the cleansing of exhaust air, in particular installations with regenerative, thermal and catalytic combustion; installations for the production and thermal use of biogases; installations for the conditioning and cleaning of water, in particular softening installations, desalination installations, sedimentation installations, filtration installations, flocculation and precipitation installations, flotation installations, emulsion-splitting installations, ultrafiltration installations, reverse-osmosis installations, ion-exchanger installations, detoxification and neutralisation installations; installations for recycling valuable substances and energy from industrial wastes and biomasses, namely, installations for the pyrolysis, low-temperature carbonization and combustion of industrial wastes and biomasses; high-temperature firing kilns for ceramic products, in particular for sanitary ware, porcelain ware, structural ceramics and technical ceramics; dryers and firing kilns for the ceramics industry; ovens for the drying of surface coating; [enameling installations, consisting of enamel-dryers, enamel ovens and waste air installations;] complete painting lines, consisting of paint ovens, waste air and water installations; drying and curing machines for non-metallic materials and installations assembled therefrom; paint-stripping installations, essentially consisting of paint-stripping ovens | ACTIVE | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Oct 31, 2023 | INNP | PARTIAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 27, 2023 | INPS | PARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 27, 2023 | INPC | INVALIDATION PROCESSED | — |
| Sep 21, 2023 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 21, 2023 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Jan 21, 2023 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Jan 6, 2023 | EROP | TEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED | — |
| Jul 6, 2022 | PUM1 | OFFICE ACTION ISSUED POU1 | — |
| Jul 5, 2022 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jun 27, 2022 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Jun 17, 2022 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jun 26, 2021 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| Jun 4, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Apr 23, 2021 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 16, 2019 | NA75 | NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED | — |
| Feb 16, 2019 | C75A | REGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK. | — |
| Feb 1, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Dec 26, 2018 | ES75 | TEAS SECTION 71 & 15 RECEIVED | — |
| Jun 26, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Sep 17, 2015 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| Apr 20, 2014 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Dec 2, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Nov 15, 2012 | FINV | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 22, 2012 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 22, 2012 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Sep 26, 2012 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jun 26, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 10, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 4, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 4, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Mar 21, 2012 | NPUB | NOTICE OF PUBLICATION | — |
| Mar 6, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Mar 6, 2012 | ALIE | ASSIGNED TO LIE | — |
| Feb 15, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Feb 14, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 14, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 14, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Nov 12, 2011 | RFNT | REFUSAL PROCESSED BY IB | — |
| Oct 24, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Oct 24, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Oct 23, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 22, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 18, 2011 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Oct 18, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Oct 15, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Oct 14, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Oct 14, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Oct 14, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Oct 13, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |