USPTO serial 79103834
BOP
Reviewed by CopyMark Law Group
Reg. 4228376Status 404
- Filing date
- Status date
- Registration date
- Oct 23, 2012
- Examiner
- FARRELL, ANNE M
- Law office
- POST REGISTRATION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with BOP?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
John H. Weber
John H. Weber Baker & Hostetler LLP1050 Connecticut Avenue, N.W.Washington Square, Suite 1100Washington, DC 20036Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines, machine tools and equipment and structural parts therefor for the construction industry, namely, traffic area construction, asphalt construction, earth-moving, hydraulic engineering, landfill construction and mining, as well as road demolition and road repair, in particular crushers, road millers, road surface breakers, road finishers, asphalt finishers, pavers, road topping recyclers, ground stabilisers, binding agent and grit spreaders, and compactors for soil, asphalt and waste, namely, rollers, multi-purpose compactors, single-drum rollers, tampers, vibrating and hydraulic plates; machines and equipment for the horizontal or vertical conveying of building materials, namely, conveyor belts, slides, hoists and hydraulic lift tables | SECTION 71 - CANCELLED | — |
| 009 | Measuring, control and regulating apparatus and instruments for the construction industry, namely, apparatus for the checking, reproduction and recording of machine data and process parameters, and for the checking and dosing of materials for any kind of earth and asphalt construction works, namely, loan, gravel, clay, sand, silt, cobbles, boulders and granular bases as well as asphalt courses and asphalt wearing courses [; computer terminals for recycling, compacting and ground stabilizing works in the construction industry; apparatus for recording, transmission or reproduction of sound or images in the construction industry; data processing equipment and computers for the construction industry; computer programs for measuring, controlling and regulating technology in the construction industry; parts and accessories for the aforesaid systems, apparatus and instruments, namely, multifunctional electronic displays and electronic adjustment devices for operation ] | SECTION 71 - CANCELLED | — |
| 042 | Engineering, technical consultancy in the field of engineering, scientific and industrial research in the construction industry, namely, in road building, asphalt construction, earth-moving, hydraulic engineering services, landfill construction and mining, and waste compacting | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BOMAG GmbH
- Other trademarks owned by BOMAG GmbH
- Other trademarks owned by BOMAG GmbH
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 042
- Similar marks named BOP
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 12, 2022 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Mar 12, 2022 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Mar 20, 2020 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Feb 20, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Feb 19, 2020 | INPC | INVALIDATION PROCESSED | — |
| Jan 24, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| May 24, 2019 | C71T | CANCELLED SECTION 71 | — |
| Oct 23, 2017 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Apr 7, 2015 | INNA | INVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE | — |
| Sep 23, 2014 | INPR | PARTIAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 23, 2014 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| Jan 23, 2014 | PLGL | ASSIGNED TO PARALEGAL | — |
| Jan 23, 2014 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| Oct 6, 2013 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 14, 2013 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Jul 27, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Jun 26, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Jun 26, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Jan 23, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Oct 23, 2012 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Sep 22, 2012 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Aug 7, 2012 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Aug 7, 2012 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jul 18, 2012 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Jul 18, 2012 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Jul 18, 2012 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jul 3, 2012 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jun 30, 2012 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jun 27, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 27, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 12, 2012 | ALIE | ASSIGNED TO LIE | — |
| May 31, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 31, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 31, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 9, 2012 | RFNT | REFUSAL PROCESSED BY IB | — |
| Dec 20, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 20, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 19, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 18, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 8, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Nov 11, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Nov 7, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Nov 3, 2011 | LIMI | LIMITATION FROM ORIGINAL APPLICATION ENTERED | — |
| Nov 3, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |