Drawing for BOP

USPTO serial 79103834

BOP

Reviewed by CopyMark Law Group

Reg. 4228376Status 404
Filing date
Status date
Registration date
Oct 23, 2012
Examiner
FARRELL, ANNE M
Law office
POST REGISTRATION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with BOP?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John H. Weber

John H. Weber Baker & Hostetler LLP1050 Connecticut Avenue, N.W.Washington Square, Suite 1100Washington, DC 20036

Goods and services

ClassDescriptionStatusFirst use
007Machines, machine tools and equipment and structural parts therefor for the construction industry, namely, traffic area construction, asphalt construction, earth-moving, hydraulic engineering, landfill construction and mining, as well as road demolition and road repair, in particular crushers, road millers, road surface breakers, road finishers, asphalt finishers, pavers, road topping recyclers, ground stabilisers, binding agent and grit spreaders, and compactors for soil, asphalt and waste, namely, rollers, multi-purpose compactors, single-drum rollers, tampers, vibrating and hydraulic plates; machines and equipment for the horizontal or vertical conveying of building materials, namely, conveyor belts, slides, hoists and hydraulic lift tablesSECTION 71 - CANCELLED—
009Measuring, control and regulating apparatus and instruments for the construction industry, namely, apparatus for the checking, reproduction and recording of machine data and process parameters, and for the checking and dosing of materials for any kind of earth and asphalt construction works, namely, loan, gravel, clay, sand, silt, cobbles, boulders and granular bases as well as asphalt courses and asphalt wearing courses [; computer terminals for recycling, compacting and ground stabilizing works in the construction industry; apparatus for recording, transmission or reproduction of sound or images in the construction industry; data processing equipment and computers for the construction industry; computer programs for measuring, controlling and regulating technology in the construction industry; parts and accessories for the aforesaid systems, apparatus and instruments, namely, multifunctional electronic displays and electronic adjustment devices for operation ]SECTION 71 - CANCELLED—
042Engineering, technical consultancy in the field of engineering, scientific and industrial research in the construction industry, namely, in road building, asphalt construction, earth-moving, hydraulic engineering services, landfill construction and mining, and waste compactingSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Mar 12, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Mar 12, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Mar 20, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Feb 20, 2020INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Feb 19, 2020INPCINVALIDATION PROCESSED—
Jan 24, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
May 24, 2019C71TCANCELLED SECTION 71—
Oct 23, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 7, 2015INNAINVALIDATION REVIEWED - NO ACTION REQUIRED BY OFFICE—
Sep 23, 2014INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 23, 2014COC.CORRECTION UNDER SECTION 7 - PROCESSED—
Jan 23, 2014PLGLASSIGNED TO PARALEGAL—
Jan 23, 2014LIMELIMITATION FROM THE IB EXAMINED AND ENTERED—
Oct 6, 2013NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 14, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Jul 27, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Jun 26, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Jun 26, 2013FIMPFINAL DISPOSITION PROCESSED—
Jan 23, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Oct 23, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Sep 22, 2012GPNXNOTIFICATION PROCESSED BY IB—
Aug 7, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Aug 7, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 18, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jul 18, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jul 18, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 3, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jun 30, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jun 27, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 27, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 12, 2012ALIEASSIGNED TO LIE—
May 31, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 31, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 31, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jan 9, 2012RFNTREFUSAL PROCESSED BY IB—
Dec 20, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 20, 2011RFRRREFUSAL PROCESSED BY MPU—
Dec 19, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 18, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Dec 8, 2011DOCKASSIGNED TO EXAMINER—
Nov 11, 2011MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 7, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 3, 2011LIMILIMITATION FROM ORIGINAL APPLICATION ENTERED—
Nov 3, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance