Drawing for CLEAN-TEC

USPTO serial 79104866

CLEAN-TEC

Reviewed by CopyMark Law Group

Reg. 5043204Status 706Renewal
Filing date
Status date
Registration date
Sep 20, 2016
Examiner
MIDDLETON, BERNICE L
Law office
Historical data usage

What this means

This registration is in, or will soon enter, a USPTO maintenance window. Missing a Section 8 or Section 9 filing can cancel the registration.

Need help with CLEAN-TEC?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Get help with this Renewal, set up monitoring, or talk with CopyMark.
Get Attorney Assistance for just $399*

Plus Government fees of $850

Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Daniel M. Gurfinkel

Daniel M. Gurfinkel Dennemeyer & Associates, LLC230 W. Monroe St.Suite 2100Chicago, IL 60606

Goods and services

ClassDescriptionStatusFirst use
001[ Adhesive substances for use in industry; premixed adhesive foam cements; ] glues and mortars which harden, namely, adhesives and glues for industrial and commercial purposes [, plastic adhesives; glues in the form of strips, sticks and shaped parts for use in the construction industry; hard, ductile, expandable or expanded organic and inorganic fire stop products and substances, in these forms or in the form of cartridges, cassettes, refills, bags, recipients made of plastic sheets and accessories, namely, chemical sealants used for buildings which penetrate through walls, floors and ceilings for fire prevention, fire extinguishing compositions and preparations, fire retardant chemicals ]ACTIVE—
002[ Fire retardant paints ]SECTION 71 - CANCELLED—
006[ Fastening, assembling, insulating and installing materials made of metal, namely, wire rope stud fittings, expansion anchors, nails, anchoring rods, pipe clips, spacer brackets for casting concrete walls, angle bars, supports for construction, nail magazines, hanging devices for hoses; metal bump keys for locksmithing and metal hardware items, namely, nuts, washers; metal elements for assembling and installing ventilation and cable ducts, pipes and channels, namely, pipe supports, pipe rings, fix points ]SECTION 71 - CANCELLED—
007[ Tools and apparatus, namely, stationary and hand-held tools, stationary and portable apparatus and apparatus powered by electricity, cartridges, gas expansion, compressed air or by combustion, namely, direct fastening apparatus for fastening pins, nails and clips, power staplers, electric and power-operated screw driving machines, electric and power drills, diamond-edged power drill and power-operated cross-cutting saw, electro pneumatic chisels, electro pneumatic saws, electro pneumatic grinders, sanding machines; power-operated applicator guns and injection guns for liquid, viscous and hard products, namely, dispensers; repair parts and attachments for the aforementioned tools and apparatus, namely, chucks and adaptors in the nature of non-electrical adapters for use in joining extensions and power drill bits, extension shafts, tripods for electric and power tools, hydraulic motors or generating sets, bits, drill bits, including crowns with diamond sections and diamond drill bits, saws, saw blades, trimming and cutting wheels, abrasive discs, chisels, screwing bits ]SECTION 71 - CANCELLED—
008[ Drilling machines, cutting machines; grinding tools, namely, manually operated grinding wheels and grindstones; abrasive discs, namely, sanding pads for non-electric, hand-operated sanders; slicing machines and hand-operated saws; manually-operated dosage guns, applicator guns and injection guns for liquid, viscous and hard products, namely, adhesives, mortars and glues ]SECTION 71 - CANCELLED—
017[ Plastic foils and profiles, namely, semi-worked synthetic plastic as semi-finished products in the form of foils, synthetic plastic as semi-finished products in the form of foils, laminated foil consisting primarily of plastic with or without a metal layer for application to a substrate; plastic fastening, namely, molded and extruded plastic for use in the manufacture of hook and loop fasteners ]SECTION 71 - CANCELLED—
019[ Non-metal fastening, assembling, insulating and installing materials, namely, non-metal self-aligning demountable snap fasteners consisting of press fasteners and press studs for use in attaching panels, hatches, floors and furniture in buildings; anchoring rods in the nature of reinforcements for concrete and wood building construction, conduit clips, shuttering spacers forms for casting concrete walls, angle bars in the nature of reinforcements for concrete and wood building construction, supports for construction; non-metal elements for assembling and installing ventilation and cable ducts, pipes and channels, namely, non-metal ventilating ducts, vent covers for HVAC ducts, roof vents for ventilation in residential and commercial buildings ]SECTION 71 - CANCELLED—
037[ Technical assistance, information and rendering of services in the sector of screw and direct fastenings, building construction and building demolition, namely, providing consulting services, information, and supervision services in the field of building construction and building demolition; repair services for tools and apparatus used for fastening, cutting, measuring, positioning, drilling, chiseling and demolition, aimed at ensuring, improving or restoring faultless operation, namely, tools, machines and apparatus used for stone, concrete, masonry and metal working, construction and demolition tools, machines and apparatus ]SECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Sep 23, 2026NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Sep 23, 202671AGREGISTERED-SEC.71 ACCEPTED—
Sep 21, 2026APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 19, 2026ES71TEAS SECTION 71 RECEIVED—
Sep 20, 2025REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Dec 10, 2023INNPPARTIAL INVALIDATION PROCESSED BY THE IB—
Nov 16, 2023INPSPARTIAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Nov 15, 2023INPCINVALIDATION PROCESSED—
Nov 12, 2023INPRPARTIAL INVALIDATION OF REG EXT PROTECTION CREATED—
Mar 12, 2023NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Mar 12, 2023NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - MAILED—
Mar 12, 2023C75PREGISTERED - PARTIAL SEC. 71 ACCEPTED & SEC. 15 ACK.—
Mar 12, 2023C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Mar 10, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Mar 10, 2023EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Sep 13, 2022PUM1OFFICE ACTION ISSUED POU1—
Sep 13, 2022APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Aug 31, 2022ES75TEAS SECTION 71 & 15 RECEIVED—
Sep 20, 2021REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Apr 15, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Jan 12, 2017FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Dec 22, 2016FICSFINAL DISPOSITION NOTICE SENT TO IB—
Dec 22, 2016FIMPFINAL DISPOSITION PROCESSED—
Dec 20, 2016FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Sep 20, 2016R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Jul 5, 2016NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Jul 5, 2016PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Jul 1, 2016OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Jun 15, 2016OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Jun 15, 2016OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Jun 15, 2016NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jun 2, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
May 25, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
May 23, 2016XAECEXAMINER'S AMENDMENT ENTERED—
May 23, 2016GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
May 23, 2016GNEAEXAMINERS AMENDMENT E-MAILED—
May 23, 2016CNEAEXAMINERS AMENDMENT -WRITTEN—
May 3, 2016GNRNNOTIFICATION OF NON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 3, 2016GNRTNON-FINAL ACTION E-MAILEDA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
May 3, 2016CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 27, 2016ZZZXPREVIOUS ALLOWANCE COUNT WITHDRAWN—
Apr 26, 2016PBCRWITHDRAWN FROM PUB - OG REVIEW QUERY—
Apr 14, 2016PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Apr 14, 2016EXPTEXPARTE APPEAL TERMINATED—
Apr 14, 2016CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Mar 24, 2016JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Feb 22, 2016GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Feb 22, 2016GECDACTION DENYING REQ FOR RECON E-MAILED—
Feb 22, 2016CNCFACTION CONTINUING FINAL - COMPLETED—
Jan 27, 2016TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 27, 2016CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 21, 2016ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 21, 2016EXPIEX PARTE APPEAL-INSTITUTED—
Jan 21, 2016JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Jan 21, 2016EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Jul 24, 2015GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Jul 24, 2015GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jul 24, 2015CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Jun 4, 2015TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 4, 2015CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
May 28, 2015ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Apr 30, 2015RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 23, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Apr 17, 2014RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Oct 10, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Jun 12, 2013LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jun 1, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
May 13, 2013OPNXNOTIFICATION OF POSSIBLE OPPOSITION - PROCESSED BY IB—
Apr 24, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Apr 24, 2013OPNRNOTIFICATION OF POSSIBLE OPPOSITION CREATED, TO BE SENT TO IB—
Apr 8, 2013GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Apr 8, 2013GNSLLETTER OF SUSPENSION E-MAILED—
Apr 8, 2013CNSLSUSPENSION LETTER WRITTEN—
Mar 8, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Mar 8, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Mar 8, 2013ERSITEAS RESPONSE TO SUSPENSION INQUIRY RECEIVED—
Jan 15, 2013RCSCREPORT COMPLETED SUSPENSION CHECK CASE STILL SUSPENDED—
Dec 27, 2012ALIEASSIGNED TO LIE—
Jun 23, 2012ADCHCHANGE OF NAME/ADDRESS REC'D FROM IB—
Jun 21, 2012GNS3NOTIFICATION OF LETTER OF SUSPENSION E-MAILED—
Jun 21, 2012GNSLLETTER OF SUSPENSION E-MAILED—
Jun 21, 2012CNSLSUSPENSION LETTER WRITTEN—
Jun 2, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jun 1, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jun 1, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Dec 24, 2011RFNTREFUSAL PROCESSED BY IB—
Dec 2, 2011RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Dec 2, 2011RFRRREFUSAL PROCESSED BY MPU—
Dec 2, 2011RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Dec 1, 2011CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Nov 29, 2011MAFRAPPLICATION FILING RECEIPT MAILED—
Nov 25, 2011DOCKASSIGNED TO EXAMINER—
Nov 25, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Nov 24, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance