USPTO serial 79105143
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Advanced Tail-end Oil Company (Atol) N.V.
CW
Other trademarks owned by Advanced Tail-end Oil Company (Atol) N.V.
Advanced Tail-end Oil Company (Atol) N.V.
CW
Other trademarks owned by Advanced Tail-end Oil Company (Atol) N.V.
Advanced Tail-end Oil Company (Atol) N.V.
CW
Other trademarks owned by Advanced Tail-end Oil Company (Atol) N.V.
CH
CH
Advanced Technologies & Innovations B.V.
NL-6827 BX ARNHEM, NL
Other trademarks owned by Advanced Technologies & Innovations B.V.
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Machines and machine tools, machine equipment and process apparatus, namely, pressure vessels, scrubbers, separators, coalescers, contactors, hydrocyclone units, floatation units, dissolved gas floatation units, filter units, bulk deoilers, bulk dewaterers, desanders, sand cleaning and sand accumulators, monocyclones, sand/solids bagging units, vessel internals, vane type inlet devices, drained vane type inlet devices, inlet cyclones, cyclo vanes, distribution baffles, anti-motion baffles, sandjet systems, sand removal systems, plate coalescers, corrugated plate coalescers, electrostatic coalescers, adjustable weir plates, mesh agglomerators, drained mesh agglomerators, vane agglomerators, mesh mist eliminators, vane mist eliminators, cyclonic mist eliminators, filters units, fiber and mesh candles, liquid distributors, structured and random packing, trays, support grids for structured and random packing, spray systems, inline equipment, degassers, flow splitters, contactors, desanders, electrostatic coalescers, sand cleaning, static mixers, swirl elements, multiphase and single phase boosters and structural parts therefor, all for use in separators; test separators, gas treatment equipment, oil stabilization equipment, produced water treatment equipment, sand removal-handling and cleaning equipment, compact separation equipment, emergency shut-down equipment, drain system equipment, flow measurement equipment, gas-fluid, fluid-fluid and fluid sand separation and for treating suspended solids in liquid | SECTION 71 - CANCELLED | — |
| 037 | Building, construction, repair and maintenance for machines and machine tools, machine equipment and process apparatus, namely, pressure vessels, scrubbers, separators, coalescers, contactors, hydrocyclone units, floatation units, dissolved gas floatation units, filter units, bulk deoilers, bulk dewaterers, desanders, sand cleaning and sand accumulators, monocyclones, sand/solids bagging units, vessel internals, vane type inlet devices, drained vane type inlet devices, inlet cyclones, cyclo vanes, distribution baffles, anti-motion baffles, sandjet systems, sand removal systems, plate coalescers, corrugated plate coalescers, electrostatic coalescers, adjustable weir plates, mesh agglomerators, drained mesh agglomerators, vane agglomerators, mesh mist eliminators, vane mist eliminators, cyclonic mist eliminators, filters units, fiber and mesh candles, liquid distributors, structured and random packing, trays, support grids for structured and random packing, spray systems, inline equipment, degassers, flow splitters, contactors, desanders, electrostatic coalescers, sand cleaning, static mixers, swirl elements, multiphase and single phase boosters and structural parts therefor, all for use in separators, test separators, gas treatment equipment, oil stabilisation equipment, produced water treatment equipment, sand removal-handling and cleaning equipment, compact separation equipment, emergency shut-down equipment, drain system equipment, flow measurement equipment, gas-fluid, fluid-fluid and fluid sand separation and for treating suspended solids in liquid; consultancy regarding the aforesaid services | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services and research and design relating thereto, namely, design, research, and development of technologies for compact oil, water, gas, and sand separation, to enable larger oil and gas recovery from both existing and new oil and gas fields, to enable production of ultra deep water subsea oil and gas fields, compact subsea separators, to allow for debottlenecking of existing production facilities, and to reduce waste generation from oil and gas production in the field of separation science and technology; engineering services in the field of separation science and technology, energy efficiency, increased oil and gas recovery and gas, oil, water and sand treatment; consultancy regarding the aforesaid services; technological consultancy in the field of separation technology, Front End Engineering and Design (FEED) studies and debottlenecking studies, simulations and inspection regarding the use and application of machines and machine tools, machine equipment and process apparatus, namely, pressure vessels, scrubbers, separators, coalescers, contactors, hydrocyclone units, floatation units, dissolved gas floatation units, filter units, bulk deoilers, bulk dewaterers, desanders, sand cleaning and sand accumulators, monocyclones, sand/solids bagging units, vessel internals, vane type inlet devices, drained vane type inlet devices, inlet cyclones, cyclo vanes, distribution baffles, anti-motion baffles, sandjet systems, sand removal systems, plate coalescers, corrugated plate coalescers, electrostatic coalescers, adjustable weir plates, mesh agglomerators, drained mesh agglomerators, vane agglomerators, mesh mist eliminators, vane mist eliminators, cyclonic mist eliminators, filters units, fiber and mesh candles, liquid distributors, structured and random packing, trays, support grids for structured and random packing, spray systems, inline equipment, degassers, flow splitters, contactors, desanders, electrostatic coalescers, sand cleaning, static mixers, swirl elements, multiphase and single phase boosters and structural parts therefor, all for use in separators, test separators, gas treatment equipment, oil stabilisation equipment, produced water treatment equipment, sand removal-handling and cleaning equipment, compact separation equipment, emergency shut-down equipment, drain system equipment, flow measurement equipment; * all of the aforementioned services in this class limited to machines and machine tools, machine equipment and process apparatus in particular regarding gas-fluid, fluid-fluid and fluid sand separation and for treating suspended solids in liquid, parts and accessories of the above-mentioned goods * | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 5, 2021 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Dec 5, 2021 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| May 15, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 17, 2020 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 24, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 24, 2020 | INPC | INVALIDATION PROCESSED | — |
| Aug 27, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Dec 27, 2019 | C71T | CANCELLED SECTION 71 | — |
| Oct 10, 2019 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Jun 7, 2019 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 16, 2019 | ADCH | CHANGE OF NAME/ADDRESS REC'D FROM IB | — |
| May 21, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Dec 15, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 15, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 1, 2017 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Jul 21, 2016 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 21, 2016 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Mar 17, 2016 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 12, 2016 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| May 6, 2015 | LIME | LIMITATION FROM THE IB EXAMINED AND ENTERED | — |
| May 6, 2015 | COC. | CORRECTION UNDER SECTION 7 - PROCESSED | — |
| May 6, 2015 | PLGL | ASSIGNED TO PARALEGAL | — |
| Apr 23, 2015 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Sep 24, 2014 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Aug 27, 2014 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Aug 22, 2014 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Aug 22, 2014 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Feb 17, 2014 | CHLD | CHANGE OF OWNER RECEIVED FROM IB | — |
| Feb 17, 2014 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Sep 6, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Aug 21, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Aug 21, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 21, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| May 21, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 8, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 5, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 5, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 13, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 13, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 13, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Jan 29, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Jan 29, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jan 17, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 17, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Jan 17, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Jan 17, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Jan 17, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Dec 31, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Dec 31, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Dec 31, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jul 15, 2012 | GNRN | NOTIFICATION OF NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2012 | GNRT | NON-FINAL ACTION E-MAILED | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jul 15, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jun 7, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jun 7, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jun 7, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 5, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 5, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 9, 2012 | RFNP | REFUSAL PROCESSED BY IB | — |
| Dec 20, 2011 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Dec 20, 2011 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Dec 16, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 15, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 8, 2011 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 5, 2011 | RFWR | NON-FINAL ACTION (IB REFUSAL) WITHDRAWN FOR REVIEW | — |
| Dec 5, 2011 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Dec 4, 2011 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Dec 4, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 4, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 1, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |