Drawing for SIMONA

USPTO serial 79106971

SIMONA

Reviewed by CopyMark Law Group

Reg. 4482936Status 706Registered
Filing date
Status date
Registration date
Feb 18, 2014
Examiner
WHITE, RICHARD F
Law office
Historical data usage

What this means

This trademark is registered with the USPTO. Monitoring new filings can help you catch lookalike marks early.

Need help with SIMONA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

John J. O'Malley

John J. O'Malley VOLPE KOENIG30 South 17th StreetSuite 1800PHILADELPHIA, PA 19103-4009

Goods and services

ClassDescriptionStatusFirst use
011Heating apparatus, namely, solar heating panels, radiators for heating buildings, radiators for motors and engines; steam generating installations; refrigerating apparatus, namely, refrigerators, freezers; ventilating apparatus, namely, ventilating fans, kitchen exhaust fans; water supply apparatus, namely, hot water tanks, hot water boilers; sanitary apparatus, namely, domestic sewage and domestic water treatment systems; water purification installations; water conduit installations; water supply installations, namely, tubes and pipes of plastic being parts for domestic, municipal and industrial water supply systems; desalination plants; purification installations for sewage; distilling units; hot water storage tanks; solar furnaces; solar storage equipment, namely, solar storage tanks for use in the field of solar heating; solar collectors and heating apparatus in the nature of pipe register collectors; heat pumps; heat accumulators; heat exchangers not being parts of machines; piping and plumbing fittings, namely, elbows, tees, caps, stub flanges, bends, reducers, branches and adaptors, sockets, saddles and bracket rings, for liquid transportation installations; pipes and pipelines of plastic being parts of plumbing, sanitary or heating installations; composite and multilayered pipes of plastic being parts of plumbing, sanitary or heating installations; junctions and junction pieces of plastic for pipes being parts of plumbing, sanitary or heating installations; heating apparatus, namely, flat and tubular collectors, namely, solar collectors; draw-off taps, namely, level regulating valves for water supply containers; heating pipes and fittings for heating installations and floor heating apparatus; under floor heating systems comprising water heaters and pipes made of plastic, sold as a unit; showers and shower cubicles; bath tubs and shower trays of plastic; ventilating fans; boiler pipe tubes for heating installations; pipe line cocks, namely, spigots; coils being parts of distilling, heating or cooling installations; refrigerating containers; pipes, profiles, solid rods, mouldings and panels of plastic all being parts of sanitary installationsACTIVE—
017Plastics in extruded form for use in manufacture; packing, stopping and insulating materials, namely, plastic packing for shipping containers, thermal insulation, insulation materials; flexible pipes, not of metal; threads of plastic for soldering; pipe muffs, not of metal for use with pipes; junctions, not of metal, for pipes; pipe couplings; plastics in extruded form for use in manufacture, in the form of blocks, sheets, webs, films, rods, profiles, pipes and pipe mouldings; rings of rubber for use as pipe connection seals; sheets and rods of plastics; plastic fibres, not for textile use for use in manufacture of chemical tanks; plastic in extruded form for general industrial use; pressed and mechanically processed panels of plastic for bullet-arrester devices for shooting rangesACTIVE—
019Non-metallic building materials, namely, plastic boards, multilayer boards with layers of plastic and metal, plastic panels, beams made of plastic; non-metallic rigid pipes for building; asphalt, pitch and bitumen; non-metallic transportable buildings; monuments, not of metal; pipes, profiles, solid rods, mouldings and panels of plastic; foundry moulds, not of metal; pipework of plastic; floor-heating pipes of plastic, composite and multilayered pipes of plastic; water tanks of plastic; tiles of plastic; flooring tiles of plastic; profile strips of plastic for building; drainage pipes of plastic; branching pipes of plastic; penstock pipes of plastic; plastic building boards; road marking sheets and strips of synthetic material; drainpipes and drainpipe systems of plastic, namely, drainpipes for drainage of traffic routes and landfill engineering; plastic pipes, mouldings and shafts for floor drainage and degasificationACTIVE—
020Furniture, mirrors, picture frames; tanks, not of metal nor of masonry, namely, chemical tanks; tote boxes of plastic; plastic storage containers; packaging containers of plastic; heating-oil containers of plastic; tanks of plastic for liquids; screw caps and sealing caps of plastic; container closures of plastic; valves of plastic other than parts of machines; pipe and cable clips and ties of plastic; cable or pipe clips of plastic; water-pipe valves of plastics; plastic signboards; shelves for storage and table tops; non-metal, transport pallets; chopping blocks and saw horses of plastic; mouldings for picture framesACTIVE—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jun 12, 2025NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 8, 2024NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Oct 8, 202471AGREGISTERED-SEC.71 ACCEPTED—
Oct 7, 2024APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 13, 2024ES71TEAS SECTION 71 RECEIVED—
Feb 18, 2023REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Oct 2, 2021NREPNEW REPRESENTATIVE AT IB RECEIVED—
Jun 11, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Oct 29, 2020NA75NOTICE OF ACCEPTANCE OF SEC. 71 & 15 - E-MAILED—
Oct 29, 2020C75AREGISTERED - SEC. 71 ACCEPTED & SEC. 15 ACK.—
Oct 13, 2020815FREGISTERED - SEC. 8 (6-YR) & SEC. 15 FILED—
Oct 13, 2020EROPTEAS RESPONSE TO OFFICE ACTION-POST REG RECEIVED—
Apr 13, 2020PR75POST REGISTRATION ACTION MAILED - SEC. 71 & 15—
Apr 1, 2020APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Feb 18, 2020TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Feb 18, 2020CHANAPPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED—
Feb 18, 2020ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 18, 2020REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Feb 18, 2020COARTEAS CHANGE OF OWNER ADDRESS RECEIVED—
Feb 18, 2020ES75TEAS SECTION 71 & 15 RECEIVED—
Feb 18, 2019REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 6, 2014FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
May 19, 2014FICSFINAL DISPOSITION NOTICE SENT TO IB—
May 19, 2014FIMPFINAL DISPOSITION PROCESSED—
May 18, 2014FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Feb 18, 2014R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 3, 2013NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 3, 2013PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Nov 13, 2013OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Nov 13, 2013OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Nov 13, 2013NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Oct 25, 2013PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Oct 22, 2013EXPTEXPARTE APPEAL TERMINATED—
Oct 22, 2013CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Oct 22, 2013XAECEXAMINER'S AMENDMENT ENTERED—
Oct 22, 2013GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Oct 22, 2013GNEAEXAMINERS AMENDMENT E-MAILED—
Oct 22, 2013CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 21, 2013JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Oct 16, 2013ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jul 2, 2013LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
May 24, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
May 6, 2013CORNCORRECTION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Apr 18, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Apr 18, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Apr 18, 2013GEA1NOTIFICATION OF ACTION DENYING REQ FOR RECON E-MAILED—
Apr 18, 2013GECDACTION DENYING REQ FOR RECON E-MAILED—
Apr 18, 2013CNCFACTION CONTINUING FINAL - COMPLETED—
Mar 25, 2013EXPIEX PARTE APPEAL-INSTITUTED—
Mar 25, 2013JURTJURISDICTION RESTORED TO EXAMINING ATTORNEY—
Mar 25, 2013EXAFEXPARTE APPEAL RECEIVED AT TTAB—
Mar 25, 2013ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Mar 19, 2013CRCVCORRECTION TRANSACTION RECEIVED FROM IB—
Mar 18, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Feb 6, 2013LIMNLIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED—
Jan 24, 2013TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jan 23, 2013CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jan 23, 2013ERFRTEAS REQUEST FOR RECONSIDERATION RECEIVED—
Jan 18, 2013LIMGLIMITATION OF GOODS RECEIVED FROM IB—
Sep 23, 2012GNFNNOTIFICATION OF FINAL REFUSAL EMAILED—
Sep 23, 2012GNFRFINAL REFUSAL E-MAILEDA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 23, 2012CNFRFINAL REFUSAL WRITTENA final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon.
Sep 18, 2012DMCCDATA MODIFICATION COMPLETED—
Aug 9, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Aug 9, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 30, 2012ARAAATTORNEY/DOM.REP.REVOKED AND/OR APPOINTEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 30, 2012REAPTEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED—
Jul 17, 2012ALIEASSIGNED TO LIE—
Jul 10, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Jul 10, 2012TCCATEAS CHANGE OF CORRESPONDENCE RECEIVED—
Jan 28, 2012RFNTREFUSAL PROCESSED BY IB—
Jan 10, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 10, 2012RFRRREFUSAL PROCESSED BY MPU—
Jan 10, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 9, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 30, 2011DOCKASSIGNED TO EXAMINER—
Dec 30, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 29, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance