USPTO serial 79106973
Reviewed by CopyMark Law Group
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Grace Han Stanton
ALEXANDER JA GARCIA PERKINS COIE LLP1201 THIRD AVENUESUITE 4900SEATTLE, WA 98101-3099| Class | Description | Status | First use |
|---|---|---|---|
| 037 | Construction of offshore rigs and ships; general contracting services in the field of marine construction, shipbuilding and offshore drilling; construction of environmentally-conscious buildings; marine construction; construction management services; installation, maintenance and repair of offshore rigs and ships; cleaning of ships; construction, fabrication in the nature of construction and repair of offshore production and/or storage facilities, drilling rigs, ships, barges and all types of vessels; construction, installation, maintenance, repair, servicing of electricity generation, transmission and distribution apparatus and instruments; construction, installation, relating to offshore and marine vessels, ships and structures; information related to marine construction and construction of offshore rigs and ships; providing information related to the repair of ships; on site and offshore project management and refurbishment relating to shipbuilding, dry docking, afloat repairs and voyage repairs, underwater construction and repairs, painting, major modifications and conversion of vessels; on site and offshore project management and refurbishment relating to the construction of facilities; on site and offshore project management and refurbishment relating to the construction, fabrication in the nature of construction and repair of all types of vessels, offshore storage and/or production facilities, drilling rigs, ships, barges and other specialized vessels; construction of steel structures and industrial equipment and plant; shipbuilding, namely, reparative dry docking, afloat repairs and voyage repairs, underwater construction and repairs, painting, major modifications and conversion of ships, barges and all types of vessels, offshore storage and/or production facilities and drilling rigs; construction, installation and erection of ships, barges, vessels, offshore storage and/or production facilities, structures and drilling rigs; rental of construction and building equipment, namely, automation, instrumentation and control systems construction and construction management of industrial and infrastructural plants in environmental business; installation, repair and maintenance of ships; ship building; construction of ships; inspection services in the course of construction of ships, vessels, barges, offshore storage and/or production facilities and drilling rigs; cleaning of ships, all types of vessels, barges, offshore storage and/or production facilities, drilling rigs; sub-contracting services in relation to building construction, repair and installation services; underwater construction, cleaning and repairs of offshore rigs and ships; equipment maintenance services for energy related or energy using equipment; information, advisory and consultancy services relating to the aforesaid; installation of energy consumption reducing equipment; installation of environmental engineering systems; installation, repair and servicing automation, instrumentation and control systems; janitorial services; maintenance and repair of infrastructural plants in environmental business; maintenance, repair and cleaning of building, industrial plants and transportation equipment; marine engineering; marine lifting services for construction purposes; appliance repair services; boiler cleaning and repair; building construction; building construction supervision; building maintenance; rental of cleaning machines; rental of construction equipment; rental of construction equipment and machines; rental of lifting apparatus for construction purposes; rental of marine building materials, equipment and products; rental of material handling equipment for construction purposes; rental of heavy cranes and lifting and hoisting equipment for construction purposes; repair, maintenance and servicing of in this class | SECTION 71 - CANCELLED | — |
| 039 | Sea transport; transport brokerage; transportation information; Packaging articles for transportation; storage of goods; marine towing; provision of tug boat services and marine towage; heavy lifting, hoisting and cranage services for loading and unloading purposes; harbor crane unloading; marine lifting services using floating cranes; marine transport, lighterage; hire or rental of ships or vessels, rental of storage containers; shipbrokerage; information advisory and consultancy services relating to the aforesaid | SECTION 71 - CANCELLED | — |
| 042 | Scientific and technological services and research and design relating thereto; industrial analysis and research services in the field of marine construction, ship building, and offshore drilling; mechanical research; technical research in the field of marine construction, ship building, and offshore drilling; research and development in engineering and construction; industrial design; design development and installation of software; naval architecture services; naval architecture consultation; provision of engineering project development and engineering project management services; engineering; engineering services; engineering feasibility studies; engineering design and construction drafting; preparation of engineering drawings and reports; engineering project management services; engineering services relating to data processing engineering technology; quality control for others; material testing; testing or research on machines, apparatus and instruments for underwater construction; industrial testing of engineering works; commissioning and inspection of plant, machinery and apparatus; inspection of plants and machinery; information, advisory and consultancy services relating to the aforesaid | SECTION 71 - CANCELLED | — |
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
| Date | Code | Event | What it means |
|---|---|---|---|
| Mar 26, 2022 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| Mar 26, 2022 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Jan 22, 2021 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Dec 11, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Dec 11, 2020 | INPC | INVALIDATION PROCESSED | — |
| Dec 7, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Apr 7, 2020 | C71T | CANCELLED SECTION 71 | — |
| Apr 7, 2020 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 23, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 9, 2016 | TMBN | TTAB RELEASE CASE TO TRADEMARKS | — |
| Mar 9, 2016 | CANT | CANCELLATION TERMINATED NO. 999999 | — |
| Mar 9, 2016 | CAND | CANCELLATION DENIED NO. 999999 | — |
| Dec 3, 2014 | PETC | CANCELLATION INSTITUTED NO. 999999 | — |
| Nov 16, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 28, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 24, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Oct 23, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 23, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 6, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| May 7, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| May 7, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Apr 17, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Apr 17, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Apr 17, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 2, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 2, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 2, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 2, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 2, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 2, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Feb 13, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Feb 13, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Feb 11, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Feb 11, 2013 | EXPI | EX PARTE APPEAL-INSTITUTED | — |
| Feb 11, 2013 | JURT | JURISDICTION RESTORED TO EXAMINING ATTORNEY | — |
| Feb 11, 2013 | EXAF | EXPARTE APPEAL RECEIVED AT TTAB | — |
| Aug 14, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Aug 14, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Aug 14, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Jul 19, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jul 19, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jul 18, 2012 | ALIE | ASSIGNED TO LIE | — |
| Jul 11, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2012 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 24, 2012 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| Jan 28, 2012 | RFNT | REFUSAL PROCESSED BY IB | — |
| Jan 12, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Jan 12, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Jan 12, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Jan 11, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Jan 3, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Dec 30, 2011 | DOCK | ASSIGNED TO EXAMINER | — |
| Dec 30, 2011 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Dec 29, 2011 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |