Drawing for CPA

USPTO serial 79106994

CPA

Reviewed by CopyMark Law Group

Reg. 4244100Status 404
Filing date
Status date
Registration date
Nov 20, 2012
Examiner
POWERS, ALEXANDER L
Law office
PUBLICATION AND ISSUE SECTION

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with CPA?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Goods and services

ClassDescriptionStatusFirst use
006Non-electric wires of common metalsSECTION 71 - CANCELLED—
007Machines and machine tools for the cutting and forming of materials; belt conveyors; wire drawing machines; belts for conveyors; conveyors; dissolving machines for chemical processing; electro-chemical discharge machine tools for metalworking; emulsifying machines for chemical processing; extracting machines for chemical processing; granulating machines for chemical processing; grinding mills for chemical processing; industrial chemical reactors; industrial mixer for mixing liquids in the pharmaceutical and chemical industries; kneading machines for chemical processing; mechanical spreaders for seed and dry lawn chemicals; separating machines for chemical processing; sintering machines for chemical processing; sorting machines for chemical processing; machines for conveying solids; mechanical winders and machines for forming coils with pipes made of plastic materials; metalworking machines; metalworking machine tools; metalworking machines for the manufacture of wiresSECTION 71 - CANCELLED—
009Apparatus and instruments for conveying, distributing, transforming, storing, regulating or controlling electric current; computer programs for use in database management; galvanometers; instruments for measuring length; weighing apparatus and instruments; electricity distribution consoles; electronic monitors and monitor modules for monitoring electric current and electrical signals; power distributing boxesSECTION 71 - CANCELLED—
011Lighting apparatus, namely, lighting installations; heating installations; steam generating installations; cooking ranges; refrigerating machines and installations; ceramic stoves; electric stoves; gas stoves; solid fuel burning stoves; drying apparatus for use in heating; ventilation systems, air conditioning systems and refrigeration systems; electrical induction heating apparatus for heating metal workpieces; water coolers; water purification installationsSECTION 71 - CANCELLED—
042Scientific and technological services, namely, research and design in the field of manufacturing special wires and machines for wire industry; testing, analysis and evaluation of the goods and services of others in the fields of heat treatment industrial material services and of the galvanic coating industrial process; engineering; consulting in the field of engineering; consulting in the field of structural engineering; consulting services in the field of architectural design; consulting services in the field of computer-based information systems for businesses; consulting services in the field of design and development of engineering processes; consulting services in the field of industrial engineering; construction engineering services; construction draftingSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jan 12, 2022DENCNOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED—
Jan 12, 2022DETHDEATH OF INTERNATIONAL REGISTRATION—
Jun 5, 2020INNTTOTAL INVALIDATION PROCESSED BY THE IB—
May 14, 2020XXSSGENERIC MADRID TRANSACTION SENT TO IB—
May 14, 2020XXCRGENERIC MADRID TRANSACTION CREATED—
Feb 21, 2020INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jun 21, 2019C71TCANCELLED SECTION 71—
Nov 20, 2017REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Sep 8, 2017NREPNEW REPRESENTATIVE AT IB RECEIVED—
Oct 1, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Aug 20, 2015CHLDCHANGE OF OWNER RECEIVED FROM IB—
Mar 19, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Feb 22, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Feb 22, 2013FIMPFINAL DISPOSITION PROCESSED—
Feb 20, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Nov 20, 2012R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Oct 16, 2012GPNXNOTIFICATION PROCESSED BY IB—
Sep 4, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Sep 4, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Aug 15, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Aug 15, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Aug 15, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Jul 30, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Jul 30, 2012ALIEASSIGNED TO LIE—
Jul 13, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Jul 12, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Jul 12, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Jul 12, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
Feb 4, 2012RFNPREFUSAL PROCESSED BY IB—
Jan 13, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Jan 13, 2012RFRRREFUSAL PROCESSED BY MPU—
Jan 11, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Jan 10, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Jan 3, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Dec 30, 2011DOCKASSIGNED TO EXAMINER—
Dec 30, 2011NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Dec 29, 2011REPRSN ASSIGNED FOR SECT 66A APPL FROM IB—

Frequently asked questions

Related guidance