Drawing for FUNDO

USPTO serial 79110900

FUNDO

Reviewed by CopyMark Law Group

Reg. 4299767Status 709
Filing date
Status date
Registration date
Mar 12, 2013
Examiner
VENGROFF, MARILYN
Law office
GENERIC WEB UPDATE

What this means

This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.

Need help with FUNDO?

If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.

Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.

Owner

Attorney of record

The USPTO lists this attorney as the applicant's representative for correspondence on this application.

Ojeiku C. Aisiku

Ojeiku C. Aisiku ECKERT SEAMANS CHERIN & MELLOTT, LLC600 GRANT STREET-44TH FLOORU.S. STEEL TOWERPITTSBURGH, PA 15219-2788

Goods and services

ClassDescriptionStatusFirst use
001chemical preparations for industrial use; adhesives for industrial use; unprocessed synthetic resins and synthetic materials in the nature of synthetic resins; chemical additives for concrete, mortar, screed and construction coatingsSECTION 71 - CANCELLED—
006metal construction materials, namely, semi-finished pipes and sectioning made of metal in the nature of supports and braces for construction use; small items of metal hardware, namely, nails, screws nuts and bolts, and ironmongery goods, namely, metal knobs, drain traps and drain pipes; protection, connection and fixing parts made of metal, namely, metal locks, metal drain parts, metal roofing and roof drainage parts; pipes of metal, metal drains for use in the construction of basement waterproofing systems and drain trap valves of metalSECTION 71 - CANCELLED—
011plumbing fittings, namely, drains; non-metal water pipelines; bath and shower equipment, namely, shower cabins, baths and showersSECTION 71 - CANCELLED—
017semi-finished goods, composed of organic and inorganic, non-metallic materials, namely, plastic and ceramic materials in matting, panel, profile, rod, frame and block form for bath and shower installations; non-metal seals for bathtubs, shower stalls and plumbing connections; pipe gaskets and pipe insulation material; gasket elements made of rubber, caoutchouc, or plastic for plumbing installationsSECTION 71 - CANCELLED—
019rigid plastic pipes; concrete drainage structures, namely, trench drains and drain traps; non-metallic construction material, namely, interior and exterior boards and drywall panels; wall and floor panels made of earthenware and natural stone; tiles; asphalt-based roofing mastics and grout compoundsSECTION 71 - CANCELLED—

Related trademarks

CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.

Prosecution history

DateCodeEventWhat it means
Jul 14, 2024INNTTOTAL INVALIDATION PROCESSED BY THE IB—
Jun 20, 2024INTSTOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB—
Jun 20, 2024INPCINVALIDATION PROCESSED—
Jun 14, 2024INTRTOTAL INVALIDATION OF REG EXT PROTECTION CREATED—
Jan 19, 2024NREPNEW REPRESENTATIVE AT IB RECEIVED—
Sep 29, 2023C71TCANCELLED SECTION 71—
Mar 12, 2022REM4COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED—
Sep 17, 2021RNWLINTERNATIONAL REGISTRATION RENEWED—
Nov 30, 2018NA71NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED—
Nov 30, 201871AGREGISTERED-SEC.71 ACCEPTED—
Nov 29, 2018APRECASE ASSIGNED TO POST REGISTRATION PARALEGAL—
Nov 5, 2018ES71TEAS SECTION 71 RECEIVED—
Mar 12, 2018REM3COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED—
Jun 23, 2016NREPNEW REPRESENTATIVE AT IB RECEIVED—
May 22, 2015NREPNEW REPRESENTATIVE AT IB RECEIVED—
Nov 23, 2013FINOFINAL DECISION TRANSACTION PROCESSED BY IB—
Nov 4, 2013FICSFINAL DISPOSITION NOTICE SENT TO IB—
Nov 4, 2013FIMPFINAL DISPOSITION PROCESSED—
Jun 12, 2013FICRFINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB—
Mar 12, 2013R.PRREGISTERED-PRINCIPAL REGISTERYour trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive.
Dec 25, 2012NPUBOFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED—
Dec 25, 2012PUBOPUBLISHED FOR OPPOSITIONYour mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance.
Dec 23, 2012GPNXNOTIFICATION PROCESSED BY IB—
Dec 5, 2012OPNSNOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB—
Dec 5, 2012OP2RNOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB—
Dec 5, 2012NONPNOTIFICATION OF NOTICE OF PUBLICATION E-MAILED—
Nov 19, 2012PREVLAW OFFICE PUBLICATION REVIEW COMPLETED—
Nov 16, 2012ALIEASSIGNED TO LIE—
Nov 1, 2012CNSAAPPROVED FOR PUB - PRINCIPAL REGISTER—
Nov 1, 2012XAECEXAMINER'S AMENDMENT ENTERED—
Nov 1, 2012GNENNOTIFICATION OF EXAMINERS AMENDMENT E-MAILED—
Nov 1, 2012GNEAEXAMINERS AMENDMENT E-MAILED—
Nov 1, 2012CNEAEXAMINERS AMENDMENT -WRITTEN—
Oct 18, 2012TEMETEAS/EMAIL CORRESPONDENCE ENTERED—
Oct 18, 2012CRFACORRESPONDENCE RECEIVED IN LAW OFFICE—
Oct 18, 2012TROATEAS RESPONSE TO OFFICE ACTION RECEIVEDThis event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action.
May 19, 2012RFNTREFUSAL PROCESSED BY IB—
Apr 27, 2012RFCSNON-FINAL ACTION MAILED - REFUSAL SENT TO IB—
Apr 27, 2012RFRRREFUSAL PROCESSED BY MPU—
Apr 25, 2012RFCRNON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW—
Apr 24, 2012CNRTNON-FINAL ACTION WRITTENA non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application.
Apr 19, 2012DOCKASSIGNED TO EXAMINER—
Apr 17, 2012MAFRAPPLICATION FILING RECEIPT MAILED—
Apr 12, 2012NWOSNEW APPLICATION OFFICE SUPPLIED DATA ENTERED—
Apr 11, 2012SDRCSN ASSIGNED FOR SECT 66A SUBSEQ DESIG FROM IB—

Frequently asked questions

Related guidance