USPTO serial 79111319
ENVIROTEC
Reviewed by CopyMark Law Group
Reg. 4340429Status 404
- Filing date
- Status date
- Registration date
- May 28, 2013
- Examiner
- VERHOSEK, WILLIAM T
- Law office
- PUBLICATION AND ISSUE SECTION
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with ENVIROTEC?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Shauna M. Wertheim
Shauna M. Wertheim The Marbury Law Group, PLLC11800 Sunrise Valley Drive15th FloorReston, VA 20191Goods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 007 | Filter and Filter bags as parts of machines, automatic apparatuses and automatic systems, namely, product recovery filters, liquid separation filters, dust separation filters made of scrim and felt and with felt layer and felt cover, namely, caps, bags, tubes, flat rods for dust collectors, baghouses, drum filters, horizontal belt filters, disc filters, liquid press filters, and conveying equipment | SECTION 71 - CANCELLED | — |
| 017 | Gaskets made of felt and plastic for use in further manufacturing; plastic articles, namely, flexible tubes, rods, poles, tubes, slabs, foils made of plastic for use in further manufacturing; casting moulded blanks, namely, moldable compounds for use in jointing and packing; glass fiber filtering materials for dedusting | SECTION 71 - CANCELLED | — |
| 019 | Building materials not made of metal, namely, building multilayer panels made of plastic; building materials, namely, building siding, trim, shutters, cover siding, trim, shutters, protection siding, trim, shutters and cover caps for chimney and connection components sold as a unit therewith; building materials made of felt, namely, siding, trim, shutters | SECTION 71 - CANCELLED | — |
| 024 | Textile filter materials, namely, felts, wool felts, needle felts, fleeces, nonwovens, spunbonded nonwovens, needle fleeces, needle felts with supporting scrim as semi-finished product for assembly purposes for parts of machines, automatic apparatuses and automatic systems, namely, product recovery filters, liquid separation filters, and dust separation filters | SECTION 71 - CANCELLED | — |
| 042 | Industrial research services and technological consultation thereto, in the field of industrial dedusting, product recovery and solid liquid separation, environmental protection in relation to filters, filter bags, filter tubes and textile filter materials; technical consultancy in relation to research services regarding filter technique and filter media, namely, analyses of dust separation problems and examination of used filter media; technical consultancy in relation to research services regarding parts made of felt material and material testing | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by BWF Tec GmbH & Co. KG
- Other trademarks owned by BWF Tec GmbH & Co. KG
- Other trademarks owned by BWF Tec GmbH & Co. KG
- Other trademarks in Class 007
- Other trademarks in Class 017
- Other trademarks in Class 019
- Other trademarks in Class 024
- Other trademarks in Class 042
- Similar marks named ENVIROTEC
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| May 2, 2022 | DENC | NOTIFICATION OF EFFECT OF CANCELLATION OF INTL REG E-MAILED | — |
| May 2, 2022 | DETH | DEATH OF INTERNATIONAL REGISTRATION | — |
| Oct 31, 2021 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Oct 24, 2020 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Sep 26, 2020 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Sep 25, 2020 | INPC | INVALIDATION PROCESSED | — |
| Sep 3, 2020 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Jan 3, 2020 | C71T | CANCELLED SECTION 71 | — |
| May 28, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| May 26, 2016 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Aug 25, 2014 | CORR | CORRECTION FROM IB ENTERED - NO REVIEW REQUIRED | — |
| Aug 22, 2014 | CRCV | CORRECTION TRANSACTION RECEIVED FROM IB | — |
| Oct 27, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Oct 8, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Oct 8, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Aug 28, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Jul 26, 2013 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Jul 19, 2013 | ES7R | TEAS SECTION 7 REQUEST RECEIVED | — |
| May 28, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Apr 22, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Mar 12, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Mar 12, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Feb 20, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| Feb 20, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| Feb 20, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Feb 6, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Feb 5, 2013 | ALIE | ASSIGNED TO LIE | — |
| Jan 24, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Jan 23, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Jan 23, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Jan 23, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Nov 1, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Nov 1, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Nov 1, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 29, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Oct 29, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Oct 29, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 19, 2012 | RFNT | REFUSAL PROCESSED BY IB | — |
| Apr 30, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| Apr 30, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| Apr 28, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| Apr 27, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| Apr 26, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| Apr 24, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| Apr 24, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| Apr 21, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |