USPTO serial 79111962
PENTOL
Reviewed by CopyMark Law Group
Reg. 4385895Status 709
- Filing date
- Status date
- Registration date
- Aug 20, 2013
- Examiner
- WEBSTER, WILLIAM M
- Law office
- GENERIC WEB UPDATE
What this means
This page summarizes the public USPTO record for this serial number, including owners, goods and services, and prosecution history.
Need help with PENTOL?
If you own this trademark, we can monitor new filings and help with USPTO deadlines. If you do not, we can file a new U.S. application.
Current trademark owner
Monitor this mark, or talk with CopyMark about this registration.
Not the owner?
File a new U.S. trademark application, or speak with our attorneys.
Owner
Attorney of record
The USPTO lists this attorney as the applicant's representative for correspondence on this application.
Kiranjit K Dharsan
Kiranjit K Dharsan Seiter Legal Studio2450 Colorado Ave., Suite 100ESanta Monica, CA 90404UNITED STATESGoods and services
| Class | Description | Status | First use |
|---|---|---|---|
| 001 | Chemical preparations for use in industry, namely, chemical products for use in industry, particularly for combustion gas scrubbing; magnesium oxides and magnesium hydroxide for technical-chemical use | SECTION 71 - CANCELLED | — |
| 004 | Non-chemical combustion additives for combustion oils and fuels | SECTION 71 - CANCELLED | — |
| 007 | Apparatus for obtaining industrial chemicals, particularly for combustion gas and fuel oil treatment, namely, emulsification machines, additive storage and dosing machines; installations for the conditioning of exhaust gases to optimize dust collection in incineration installations, namely, flue gas conditioning machines based on SO3 or NH3 injection; installations for the industrial conversion of fuels, namely, emulsification machines | SECTION 71 - CANCELLED | — |
| 009 | Measuring apparatus and instruments, particularly for the measurement of gases in incinerators; apparatus for proportioning chemical products for industrial use, namely, dosing pumps for additives, water pumps for emulsification, water-cut monitors, static mixers, high pressure water injection nozzles, for combustion gas and fuel oil treatment | SECTION 71 - CANCELLED | — |
| 037 | Construction of electrical installations, namely, control system and electrical cabinets for emulsification units, additive storage and dosing units, flue gas conditioning systems; construction of installations for chemical-technical laboratory work, namely, SO3 generators and installations for the conditioning of exhaust gases to optimize dust collection in incineration installations; installation and commissioning of steam generators; repairing machines for flue gas conditioning units, based on SO3 and NH3 injection, in the field of flue gas treatment and combustion optimization and repairing installations for flue gas conditioning units, based on SO3 and NH3 injection, in the field of flue gas treatment and combustion optimization; maintenance of installations for emulsification units in the field of flue gas treatment and combustion optimization and maintenance of machines for emulsification units in the field of flue gas; rental of installations for the conditioning of exhaust gases and apparatus for proportioning chemical additives for fuel | SECTION 71 - CANCELLED | — |
| 042 | Electronic and electrical systems design services, namely, consulting in connection with chemical product selection for combustion optimization in electrical and electronic installations; engineering services, namely, design and establishment of electrical installations; engineering services, namely, design, establishment, programming and optimization of installations for emission reduction and installations for combustion optimization and installations for conditioning exhaust gases; engineering services, namely, design and establishment of installations for chemical-technical laboratory work and installations for conditioning exhaust gases; engineering services, namely, design of and data calculation relating to insulated conduits, particularly double-walled conduits; product safety testing, namely, producing risk analyses studies and drawings of installations for emission reduction and installations for conditioning exhaust gases; engineering services in the field of emission reduction and combustion process optimization, in particular commissioning of installations as well as monitoring and interpreting measurement values; engineering services, namely, technical engineering design, installation and commissioning of steam generators; monitoring and interpretation of technical measurements for combustion optimization | SECTION 71 - CANCELLED | — |
Related trademarks
CopyMark links this record to cited §2(d) serials, the owner's other marks, Nice classes, similar mark names, and recently changed USPTO applications.
- Other trademarks owned by Pentomag Holding AG
- Other trademarks owned by Pentomag Holding AG
- Other trademarks owned by Pentomag Holding AG
- Other trademarks in Class 001
- Other trademarks in Class 004
- Other trademarks in Class 007
- Other trademarks in Class 009
- Other trademarks in Class 037
- Other trademarks in Class 042
- Similar marks named PENTOL
- Recently changed USPTO trademarks
- Recently filed trademarks
- Browse all trademark records
Prosecution history
| Date | Code | Event | What it means |
|---|---|---|---|
| Dec 21, 2024 | INNT | TOTAL INVALIDATION PROCESSED BY THE IB | — |
| Nov 25, 2024 | INTS | TOTAL INVALIDATION OF REG EXT PROTECTION SENT TO IB | — |
| Nov 25, 2024 | INPC | INVALIDATION PROCESSED | — |
| Nov 9, 2024 | INTR | TOTAL INVALIDATION OF REG EXT PROTECTION CREATED | — |
| Mar 8, 2024 | C71T | CANCELLED SECTION 71 | — |
| Aug 20, 2022 | REM4 | COURTESY REMINDER - SEC. 71 (10-YR) E-MAILED | — |
| May 10, 2022 | CHAN | APPLICANT/CORRESPONDENCE CHANGES (NON-RESPONSIVE) ENTERED | — |
| May 10, 2022 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 10, 2022 | EWAF | TEAS WITHDRAWAL OF ATTORNEY RECEIVED-FIRM RETAINS | — |
| May 10, 2022 | ARAA | ATTORNEY/DOM.REP.REVOKED AND/OR APPOINTED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| May 10, 2022 | REAP | TEAS REVOKE/APP/CHANGE ADDR OF ATTY/DOM REP RECEIVED | — |
| May 10, 2022 | COAR | TEAS CHANGE OF OWNER ADDRESS RECEIVED | — |
| Dec 9, 2021 | RNWL | INTERNATIONAL REGISTRATION RENEWED | — |
| Feb 16, 2019 | NA71 | NOTICE OF ACCEPTANCE OF SEC. 71 - E-MAILED | — |
| Feb 16, 2019 | 71AG | REGISTERED-SEC.71 ACCEPTED | — |
| Feb 8, 2019 | APRE | CASE ASSIGNED TO POST REGISTRATION PARALEGAL | — |
| Feb 5, 2019 | ES71 | TEAS SECTION 71 RECEIVED | — |
| Aug 20, 2018 | REM3 | COURTESY REMINDER - SEC. 71 (6-YR) E-MAILED | — |
| Mar 17, 2017 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| Aug 13, 2015 | NREP | NEW REPRESENTATIVE AT IB RECEIVED | — |
| Dec 24, 2013 | FINO | FINAL DECISION TRANSACTION PROCESSED BY IB | — |
| Nov 21, 2013 | FICS | FINAL DISPOSITION NOTICE SENT TO IB | — |
| Nov 21, 2013 | FIMP | FINAL DISPOSITION PROCESSED | — |
| Nov 20, 2013 | FICR | FINAL DISPOSITION NOTICE CREATED, TO BE SENT TO IB | — |
| Aug 20, 2013 | R.PR | REGISTERED-PRINCIPAL REGISTER | Your trademark is registered on the Principal Register — the strongest form of federal trademark protection. You may use the ® symbol for the covered goods and services. Maintenance filings (Section 8 and renewals) are required to keep the registration alive. |
| Jul 21, 2013 | GPNX | NOTIFICATION PROCESSED BY IB | — |
| Jun 4, 2013 | NPUB | OFFICIAL GAZETTE PUBLICATION CONFIRMATION E-MAILED | — |
| Jun 4, 2013 | PUBO | PUBLISHED FOR OPPOSITION | Your mark was published in the USPTO Official Gazette for a 30-day opposition window. During that period, third parties who believe they would be harmed can file an opposition. If no opposition is filed, prosecution usually continues toward registration or a Notice of Allowance. |
| Jun 2, 2013 | TCCA | TEAS CHANGE OF CORRESPONDENCE RECEIVED | — |
| May 15, 2013 | OPNS | NOTIFICATION OF POSSIBLE OPPOSITION SENT TO IB | — |
| May 15, 2013 | OP2R | NOTICE OF START OF OPPOSITION PERIOD CREATED, TO BE SENT TO IB | — |
| May 15, 2013 | NONP | NOTIFICATION OF NOTICE OF PUBLICATION E-MAILED | — |
| Apr 26, 2013 | PREV | LAW OFFICE PUBLICATION REVIEW COMPLETED | — |
| Apr 25, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 25, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 23, 2013 | ALIE | ASSIGNED TO LIE | — |
| Apr 23, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 23, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 23, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 23, 2013 | ZZZX | PREVIOUS ALLOWANCE COUNT WITHDRAWN | — |
| Apr 19, 2013 | CNSA | APPROVED FOR PUB - PRINCIPAL REGISTER | — |
| Apr 19, 2013 | XAEC | EXAMINER'S AMENDMENT ENTERED | — |
| Apr 19, 2013 | GNEN | NOTIFICATION OF EXAMINERS AMENDMENT E-MAILED | — |
| Apr 19, 2013 | GNEA | EXAMINERS AMENDMENT E-MAILED | — |
| Apr 19, 2013 | CNEA | EXAMINERS AMENDMENT -WRITTEN | — |
| Apr 12, 2013 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Apr 12, 2013 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Apr 12, 2013 | ERFR | TEAS REQUEST FOR RECONSIDERATION RECEIVED | — |
| Mar 2, 2013 | LIMN | LIMITATION FROM THE IB EXAMINED, NO ACTION IS NEEDED | — |
| Jan 25, 2013 | LIMG | LIMITATION OF GOODS RECEIVED FROM IB | — |
| Oct 15, 2012 | GNFN | NOTIFICATION OF FINAL REFUSAL EMAILED | — |
| Oct 15, 2012 | GNFR | FINAL REFUSAL E-MAILED | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Oct 15, 2012 | CNFR | FINAL REFUSAL WRITTEN | A final Office Action (final refusal) means the examining attorney is maintaining at least one refusal and your options are narrower. You can file a response addressing the refusal, appeal to the Trademark Trial and Appeal Board, or let the application abandon. |
| Sep 24, 2012 | TEME | TEAS/EMAIL CORRESPONDENCE ENTERED | — |
| Sep 23, 2012 | CRFA | CORRESPONDENCE RECEIVED IN LAW OFFICE | — |
| Sep 23, 2012 | TROA | TEAS RESPONSE TO OFFICE ACTION RECEIVED | This event means the applicant filed a response to a USPTO Office Action — typically arguments, amendments, or evidence addressing the examiner's objections. The USPTO will review the response and either allow the mark to proceed or issue another action. |
| Jun 7, 2012 | RFNP | REFUSAL PROCESSED BY IB | — |
| May 16, 2012 | RFCS | NON-FINAL ACTION MAILED - REFUSAL SENT TO IB | — |
| May 16, 2012 | RFRR | REFUSAL PROCESSED BY MPU | — |
| May 15, 2012 | RFCR | NON-FINAL ACTION (IB REFUSAL) PREPARED FOR REVIEW | — |
| May 15, 2012 | MAFR | APPLICATION FILING RECEIPT MAILED | — |
| May 14, 2012 | CNRT | NON-FINAL ACTION WRITTEN | A non-final Office Action means the USPTO examining attorney has raised at least one issue with your trademark application but has not made a final decision. You usually have three months to respond with arguments, amendments, or evidence. Missing the deadline can abandon the application. |
| May 11, 2012 | DOCK | ASSIGNED TO EXAMINER | — |
| May 11, 2012 | NWOS | NEW APPLICATION OFFICE SUPPLIED DATA ENTERED | — |
| May 10, 2012 | REPR | SN ASSIGNED FOR SECT 66A APPL FROM IB | — |